• Title/Summary/Keyword: harbor construction

Search Result 239, Processing Time 0.023 seconds

Problems and Ways of Improvement towards the Maldevelopment of Reserved Areas of Natural Environments, Ulleung Island (울릉도 자연환경자원보호구역에서의 난개발 문제점과 개선방안)

  • Oh, Nam-Hyun
    • Journal of the Korean association of regional geographers
    • /
    • v.7 no.3
    • /
    • pp.14-28
    • /
    • 2001
  • This study is to discuss the problems due to the maldevelopment occurred at the reserved areas of natural environments of the Ulleung Island, Gyeongsangbuk-do province, and it also suggests the ways of solving them The types of the maldevelopment practiced on the Ulleung Island consist of the change of land use, the opening of a round road, the destruction of mountains for the construction of harbor, the development of tourist areas, and the construction of military facilities. The decreased habitat of animals and the pollution of drinking water are occurred by the change of land use. The destruction of ecological system is due to the opening of a round road. The damage of natural landscape and the change of ocean eco-system is closely related to the construction of harbor and the destruction of mountains. Finally, the damage of rare plants and the pollution of drinking water are due to the development of tourist areas and the construction of military facilities. In the followings, the ways of solving the problems occurred by the various types of maldevelopment are suggested. First, the planning of pro-environmental development has to be established and practiced to preserve rare plants which are damaged due to the change of land use. Second, the destruction of natural landscape and resources has to be minimized by the implementation of environmental impact assesment when road and harbor are constructed. Third, the stones needed for the development of islands ought to be imported from mainland. Fourth, the established tourist areas are needed to rationally manage and the potential tourist areas has to be transferred to the reserved areas of natural environments. Fifth, military facilities should be constructed though the cooperation of autonomous local government. Finally, government officers' and residents' conscience of protecting and reserving natural environments is needed, and government has to give residents financial supports.

  • PDF

Dredging and Reclamation Technology for Prevention of Water Pollution (수질오염 방지를 위한 준설매립공법에 관한 연구)

  • 신은철;오영인;이학주
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.05a
    • /
    • pp.41-45
    • /
    • 2000
  • Geotube is made of permeable but soil-tight geotextile, hydraulically filled with soil include dredged sand and mud, which has been successfully applied in hydraulic and coastal engineering projects. Ceotube method is getting popular and being used a lot in many countries of the world because of the simplicity of the placement and construction, cost effectiveness and minimum impact on the environment, and enable to store & isolate contaminated materials as obtained by harbor dredging. Laboratory tests and field construction were performed to determine the design methodology and construction procedures. From the results of laboratory and field construction, the retention ratio of solid particle is a minimum 86%. The minimum permeability and the tensile strength of geotextile are $\alpha$ x 10$^{-4}$ cm/sec and 20t/m, respectively Also, based on the environmental test results, it can be concluded that this method does meet the Korean EPA standards.

  • PDF

Fine dust(PM10) emission calculated of Dong-Hae harbor around area using inverse modeling technique (역모델링 기법을 이용한 동해항 주변지역 미세먼지 배출량 산출)

  • Kim, Ji-Hyun;Park, Young-Koo
    • Journal of the Korean Applied Science and Technology
    • /
    • v.32 no.4
    • /
    • pp.649-660
    • /
    • 2015
  • Data obtained from the Calpuff inverse modeling estimate the emission amount of pollutants, and enable to establish the aim for reduction through the comparison of various cases. This study pursued to accumulate the fundamental data by the Calpuff inverse modeling for five areas in the vicinity of Donghae harbor, which focused on reduction of atmospheric fine dust. As a result of evaluation of the allowed emission amount for local sites, site-D required the most reduction, $4.95{\mu}g/m^2{\cdot}S$, based on the atmospheric guideline, $50{\mu}g/m^3$. The theoretical mitigation could decrease the average concentration of PM10 to $42.6{\mu}g/m^3$ for the study field (Donghae waste water treatment plant). Modeling only for site-A emission showed the potential concentration around the residential area of Donghae harbor, $40{\sim}50{\mu}g/m^3$. However, it will rise over $50{\mu}g/m^3$ with the addition of background level. Therefore no more emission would be allowed. Site-B including commercial area and unpaved field required the reduction of $0.11{\mu}g/m^2{\cdot}S$ due to vehicles and fugitive dust. Site-C and E did not emit additional pollutants.

A Study on the Analysis of Ship Handling Simulation about Domestic Sea Bridge over the Harbor (국내 항만횡단 해상교량 관련 선박조종시뮬레이션 분석)

  • Lee, Yun-Sok;Cho, Ik-Soon;Cho, Ju-Hyun;Song, Chae-Uk
    • Journal of Navigation and Port Research
    • /
    • v.32 no.5
    • /
    • pp.321-326
    • /
    • 2008
  • Recently the large sea bridge's construction crossing harbor and main ship's route have been propelled in the domestic so that it is active for the smoothly traffic flow of inland transportation and road user's convenience. However, it can bring about the trouble to ensure marine traffic safety if it is built that sea bridge's construction sets to an economy principle in the extension of the land road system. We're adopting Ship Handling Simulation in representative method for the influence assessment of marine traffic safety and danger elements beforehand. This research attempts to show the problems through the comparison and analysis of the reports relating to the sea bridge construction for 4 organization possessing Ship Handling Simulation. Finally, We offer the necessity of standardization on performing and assessment method of simulations.

Finite Element Analysis of Flow and Water Quality in the New Harbor Site (신항만부지에서의 유동 및 수질에 관한 유한요소해석)

  • Ahn, Do-Kyung;Lee, Joong-Woo
    • Journal of Navigation and Port Research
    • /
    • v.26 no.1
    • /
    • pp.137-145
    • /
    • 2002
  • Water flow simulations for environmental problems often require local detailed analyses for better understanding and accurate prediction of the fate of pollutant in water bodies. This study deals with the development and application of a two-dimensional flow an dispersion model to the coastal water area to find out possible changes due to the wide port development plan. As far as the spatial discretization is concerned, the finite element method is attractive because of its flexibility and ability to naturally treat complex coastal geometries. The model uses finite element theory and the Galerkin weighted-residual approach as its basis. Developed model is applied to the Busan New harbor Construction site. Results from the model were compared with the measured water level and flows in four stations. The flow pattern by the model shows to be similar to the observed data away from the construction site where the flow is not affected. From the simulation results, it is concluded that the model may be useful for numerous other studies for planning and management purposes, especially flow and pollution dispersion in the coastal water bodies where the flow is so complicated.

An Experimental Study on Flow Characteristic Around Inclined Crest Groyne (경사수제 주변 흐름특성 분석에 관한 실험연구)

  • Kang, Joon-Gu;Kim, Sung-Jung;Yeo, Hong-Koo
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.9
    • /
    • pp.715-724
    • /
    • 2009
  • In case of inclined crest groyne, flow constriction with water is different. Therefore, it is proper to apply to narrow channel or there is a risk of overflow with water level rising caused by installation of groynes. This study were conducted experiments on inclined crest groyne. Main factors of inclined crest groyne are angles of crests slope and changes of water level. Velocity profile around groyne was measured by LSPIV (Large Scale Particle Image Velocimetry). Flow fields around groyne were analyzed focused on main channel and recirculation area. From the results, Thalweg change has little an effect on rate length and height of recirculation rises on increasing rate length. Length of recirculation area was about 12$\sim$16 times of rate length of groyne. Maximum velocity in main channel area was measured about 1.45$\sim$2.1 times of approach velocity and has little an effect on crest angle of groyne. Back water velocity recirculation area was decreased on approach velocity. This result presents to make stable flow to bank protection.

Estimation Technique of Computationally Variable Distance Step in 1-D Numerical Model (1차원 수치모형의 가변 계산거리간격 추정 기법)

  • Kim, Keuk-Soo;Kim, Ji-Sung;Kim, Won
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.5
    • /
    • pp.363-376
    • /
    • 2011
  • 1-D hydrodynamic numerical models have been most widely used in the field of flood analysis. The model's input data are upstream/downstream boundaries, roughness coefficients, cross-sections, and so on, and computational distance step and time step are the most important factors in order to guarantee the computational accuracy, stability, and efficiency. In this study, a theoretical explanation is presented for the basis of the previous empirical selection criteria of cross-section's location; also, the estimation technique of computationally variable distance step is proposed to reflect the properties of flow at every computational time step. Combining this technique with 1-D unsteady numerical model, it was applied to two events of Teton dam failure flood and the Han River flood. The numerical experimental results demonstrate that the accuracy and stability is increased when used more interpolated cross-sections and show that the proposed technique of computationally variable distance step has the same order of accuracy with smaller numbers of cross-section than previous empirical selection criteria. The practical use of this technique will be possible to analyze the river floods with high efficiency as well as accuracy and stability.

Concrete Caisson Manufacturing and Transferring Apparatus and Method (II) (초대형 콘크리트 케이슨 다단계 일괄 제작 및 운반공법 개발 (II))

  • Zung, Zi-Man;Lee, Won-Pyo;Park, Jung-Min
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.400-403
    • /
    • 2004
  • In conventional methods, the availability of floating crane has determined the size of a concrete caisson. However, this paper introduces a new method for larger caisson production that make it possible to complete caisson fabrication and launch out without use of floating crane. The new method carries out multi-step fabrication of caisson and horizontal transfer of caisson on a single casting bed which consists of collapsible soffit form, trough, aero go watercaster system or low frictional PTFE added jacking system, half-submergible floating dock. To make the new method successfully launched, the static and dynamic analysis is carried out to obtain the stability of caisson launching and experimental research is conducted in evaluating friction occurred between PTFE pad and steel track. Lastly, the comparison of the new method and the conventional method are detailed. With significant benefits in construction costs reduction and construction time reduction, this new method in this paper would be recommended for extensive application in large port and harbor construction projects.

  • PDF

A Study on the Assessment of Optimum Berth Length for Incheon Container Terminal of the Kyeong-In Port (경인항 인천컨테이너터미널의 최적 부두길이 산정에 관한 연구)

  • Kim, Se-Won;Park, Young-Soo;Kim, Tae-Min
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.23 no.2
    • /
    • pp.210-220
    • /
    • 2011
  • The Keyongin Inland waterway will connect with Han-River and the Northen part of the Incheon-seaway and this way will be opened at the early of October this year. In this regard, the Incheon container terminal is under constructing for 1,000 TEU & 550 TEU container vessels at the place of leftside of the Seohae lockgate. However the terminal length is not still fixed due to at a great expenses of construction and dosposal matter of the dredged soil. So this paper will suggest the optimum berth length by using the full mission shiphandling simulator for berthing and unberthing shipmaneuvering. And also evaluates the design standard of harbor construction rules and analysis optimum berth length against ship's length for safe shiphandling at terminals in accordance with the customary practices of the major ports in Korea.

Construction Monitoring of Geotextile Tube at Young-Jin Bay and Stability Analysis by Hydraulic Model Tests (영진만 지오텍스타일 튜브의 현장 시공계측 및 수리모형시험을 통한 안정성분석)

  • 신은철;오영인;이명호
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.549-556
    • /
    • 2002
  • Geotextile tubes hydraulically or mechanically filled with dredged materials have been applied in hydraulic and coastal engineering in recent years(shore protection structure, detached breakwater, groins and jetty). It can also be used to isolate contaminated material from harbor, detention basin dredging, and to use this unit as dikes for reclamation work. Recently, new preliminary design criteria supported by model and prototype tests, and some stability analysis calculations have been studied. The stability analysis of geotextile tube is composed geotechnical and hydrodynamic analysis. The stability check points are sliding failure, overturning, bearing capacity failure against the wave attack. In this paper presented the construction procedure and in-situ measurement(properties of filling material, effective height variation, stress variation at geotextile tube bottom) of geotextile tube at Young-Jin Bay and stability analysis by theoretical method and hydraulic model tests

  • PDF