• Title/Summary/Keyword: harbor construction

Search Result 239, Processing Time 0.021 seconds

The Change of Coastal Water Area due to the Development of Mokpo Harbor and Construction of Daebul Industrial Complex(II) (木浦港 開發 및 大佛産業團地 造成에 따른 沿岸海域 變化(II) - 海上環境을 中心으로 -)

  • 이중우;정명선;민병언
    • Journal of the Korean Institute of Navigation
    • /
    • v.16 no.1
    • /
    • pp.37-64
    • /
    • 1992
  • A study on the changes of the oceanographical environment caused by Mokpo coastal zone development was carried out. Special emphasis was placed on the clarification of the water level changes and coastal current structure and influence of the environmental factors on the coastal area. In order to understand the structure oceangraphical environemnt, such as water temperature, salinity, suspended solids, pH, dissolved oxygen, chemical oxygen demand, biochemical oxygen demand, distribution of bottom sediment, tide and current were measured. To investigated the structure of tide and current for the future development, a numerical analysis was carried out. In certain zones, it was found to be flooding problems near the lowlying commercial area.

  • PDF

Artificial Resort Beach Development and Numerical Analysis (인공휴양해변개발과 수치실험분석)

  • Lee, Joong Woo;Jeong, Myoeng Seon
    • Journal of Korean Port Research
    • /
    • v.4 no.1
    • /
    • pp.21-31
    • /
    • 1990
  • The application of computer model to the port and harbor development is categorized in the field of port development policy, economic analysis and evaluation, civil engineering analysis, hydrodynamic analysis, evaluation of social and natural environment effect, etc. The study in this paper, however, is limited to hydrodynamic analysis, especially the analysis of water wave propagation and response to the shore structure due to the construction and implementation of shore boundary, the mathematical formulation of the numerical model is established systematically based on the hybrid Element Method and applied to solving the wave refraction, diffraction and radiation problems for a circular basin, the artificial beach or lagoon in terms of coastal zone development.

  • PDF

A Numerical Experiment of Tide Changes due to the Development of Land Reclamation near the Youngsan River (영산강지구 대단위간척지 개발로 인한 조석변화에 대한 수치실험)

  • Lee, J.W.;Shin, S.H.
    • Journal of Korean Port Research
    • /
    • v.5 no.2
    • /
    • pp.65-75
    • /
    • 1991
  • Tidal current and water level change in coastal waters are formulated in terms of mathematical models. A systematic discussion of the derivation of a set of governing equations, expressing conservation of mass and momentum is presented. A simplification is introduced by integrating all variables and equations over the total water depth, the Solution of the formulated problem is achieved by using the finite difference method(FDM). The applied study area is taken from Mokpo harbor and its adjacent coastal water which have significant hydrographical changes due to the construction of the estuary barrage and land reclamation work of estuary barren. Some comparisons with the observed current and water level changes the numerical solutions are found to be considerably fit well for the recent coastal water motion.

  • PDF

Structural health monitoring of a newly built high-piled wharf in a harbor with fiber Bragg grating sensor technology: design and deployment

  • Liu, Hong-biao;Zhang, Qiang;Zhang, Bao-hua
    • Smart Structures and Systems
    • /
    • v.20 no.2
    • /
    • pp.163-173
    • /
    • 2017
  • Structural health monitoring (SHM) of civil infrastructure using fiber Bragg grating sensor networks (FBGSNs) has received significant public attention in recent years. However, there is currently little research on the health-monitoring technology of high-piled wharfs in coastal ports using the fiber Bragg grating (FBG) sensor technique. The benefits of FBG sensors are their small size, light weight, lack of conductivity, resistance corrosion, multiplexing ability and immunity to electromagnetic interference. Based on the properties of high-piled wharfs in coastal ports and servicing seawater environment and the benefits of FBG sensors, the SHM system for a high-piled wharf in the Tianjin Port of China is devised and deployed partly using the FBG sensor technique. In addition, the health-monitoring parameters are proposed. The system can monitor the structural mechanical properties and durability, which provides a state-of-the-art mean to monitor the health conditions of the wharf and display the monitored data with the BIM technique. In total, 289 FBG stain sensors, 87 FBG temperature sensors, 20 FBG obliquity sensors, 16 FBG pressure sensors, 8 FBG acceleration sensors and 4 anode ladders are installed in the components of the back platform and front platform. After the installation of some components in the wharf construction site, the good signal that each sensor measures demonstrates the suitability of the sensor setup methods, and it is proper for the full-scale, continuous, autonomous SHM deployment for the high-piled wharf in the costal port. The South 27# Wharf SHM system constitutes the largest deployment of FBG sensors for wharf structures in costal ports to date. This deployment demonstrates the strong potential of FBGSNs to monitor the health of large-scale coastal wharf structures. This study can provide a reference to the long-term health-monitoring system deployment for high-piled wharf structures in coastal ports.

A study on the status and improvement of preliminary feasibility study of culture and tourism projects (문화.관광부분사업의 예비타당성조사 실태분석 및 개선방안 연구 -운용관리비용 분석을 중심으로-)

  • Sun, Shu-Li;Kim, Ju-Hyung;Shin, Sung-Wooi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.129-138
    • /
    • 2007
  • According to the preceding research outcomes, feasibility studies on public construction projects were incorrect and subjective. To resolve the problems, Korean government initiated Preliminary Feasibility Study (PFS) system prior to undertaking the main feasibility study. The PSF can be categorized into four areas such as road, railroad, harbor, airport, and Culture & Tourism (C&T). Especially when it comes to complex due to the introduction of five-weekday working system and local $government^{\circ}{\phi}s$ self administrative system. As a result, the standardization and legislation of the PSF can not be operated effectively. Accordingly this paper seeks to 1) identify actual condition of conducted PSF in C&T; 2) set up analytical model considering cost factor of economical efficiency and seek obstacles of PSF system; 3) suggest improvement plan for construction PSF projects.

Analysis of Harbor Responses due to the Dredging Work at Waterway and Mooring Basin in Busan New Port (부산 신항만에서 수로 및 박지 준설에 따른 항만정온도의 변화 분석)

  • Lee Joong-Woo;Lee Hak-Seung;Lee Hoon;Yang Sang-Yong
    • Journal of Navigation and Port Research
    • /
    • v.30 no.1 s.107
    • /
    • pp.97-104
    • /
    • 2006
  • Recently the first stage qf construction for Busan new port emerged over the sea surface at the north container terminal site. With this, there are lot of discussions and debates on increasing the water depth at the approaching channel and mooring basin from the existing 15m to 18m by dredging work in order to be able to serve 12,000TEU containership, and at the same time, correction to the reclamation plan of hinterland at the part of Undong Bay qf the new port site. Since the attack of typhoon 'Maemi' in 2003, it is expected that the design wave parameters for coastal and harbor structures in this area would be somewhat changed and so the extreme wave condition at each terminal and tranquility of berthing area does, and therefore, it is necessary to analyze the tranquility at each berth Hence in this study, we constructed a wave model for these conditions and performed simulation together with the circulation model simulation, compared with the field data collected The result showed the increase of the harbor response throughout the basin but not severe condition However, a certain location needs to be prepared for the rough sea condition when a severe typhoon hit the site.

Developing a water discharge anchor & trap bolt to prevent basic salt from penetrating to harbor structures (해수 염기 침투방지를 위한 항만구조물 보수보강용 물배출 앵커 및 트랩볼트 개발에 관한 연구)

  • Ock, Jong-Ho;Moon, Sang-Deok;Lee, Hwa-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.535-541
    • /
    • 2018
  • Most construction methods for the repair and reinforcement of old reinforced concrete harbor structures involve a process of applying a fiber complex or fiber complex panel just like wallpaper to the bottom of structures, such as slabs or beams. On the other hand, these techniques result in the sealing of repaired and reinforced portions of the structures by the fiber products, preventing moisture, such as rainwater entering the structures through the upper surfaces of the slabs or beams from being released, and causing the entire concrete covering of the structures to be peeled off in the long run. To prevent this, it is necessary to develop a technique to protect the basic salt from the sea water from penetrating into the structures while expelling the water absorbed in the structures swiftly. This study attempted to solve the problem by modifying the anchor bolts currently used to repair and reinforce the port structure. That is, by drilling holes into the body of anchor bolts and modifying the caps of the bolts to produce a structure that would let the water flow like a toilet trap, the moisture inside of the structure could be drained through the holes in the anchor bolts. The water discharge anchor bolts developed were tested and observed for 6 months; the water was discharged in 73% of the anchors (200 anchor installation, 145 anchors).

An Experimental Study for the Empirical Equation to Quantify the Subsidence of Riprap Scour Protection at Downstream of Vertical Drop Structures (연직낙차공 하류부 사석보호공 침하량 산정식에 관한 실험 연구)

  • Kim, Chang-Sung;Kang, Joon-Gu;Yeo, Hong-Koo;Yeo, Woon-Kwang
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.5
    • /
    • pp.433-443
    • /
    • 2010
  • Drop structures that span the entire width of channels are installed to alleviate channel grades and have been constructed widely in Korean rivers. Aprons are normally installed and integrated with drop structures and bed protections are added on the downstream part of aprons to protect both drop structures and aprons. Scour occurring on aprons is reported to provide various habitats such as ripples and pools in natural rivers. This study focuses on the scour characteristics on an apron integrated with a drop structure and the subsidence of a riprap protection. The scour depth on the downstream part of the drop structure is found to increase with the increase of unit discharge; however, to decrease as the tail water depth gets deeper. Based on the experimental measurements, the subsidence of the riprap scour protection is calculated with respect to the thickness of riprap. Finally, the dimensionless empirical equation to quantify the subsidence of the riprap scour protection without filters at downstream of the vertical drop is suggested.

Analysis of Harbor Responses due to the Dredging Work at Waterway and Mooring Basin in Busan New Port (부산 신항만에서 수로 및 박지 준설에 따른 항만정온도의 변화 분석)

  • Lee Joong-Woo;Lee Hak-Seung;Lee Hoon;Yang Sang-Yong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.117-124
    • /
    • 2005
  • Recently the first stage of construction for Busan new port emerged over the sea surface at the north container terminal site. With this, there are lot of discussions and debates on increasing the water depth at the approaching channel and mooring basin from the existing 15m to 18m by dredging work in order to be able to serve 12,000TEU containership, and at the same time, correction to the reclamation plan of hinterland at the part of Undong Bay of the new port site. Since the attack of typhoon 'Maemi' in 2003, it is expected that the design wave parameters for coastal and harbor structures in this area would be somewhat changed and so the extreme wave condition at each terminal and tranquility of berthing area does, and therefore, it is necessary to analyze the tranquility at each berth. Hence in this study, we constructed a wave model for these conditions and performed simulation together with the circulation model simulation, compared with the field data collected. The result showed the increase of the harbor response throughout the basin but not severe condition. However, a certain location needs to be prepared for the rough sea condition when a severe typhoon hit the site.

  • PDF

A Design for the Symbol Park and the Waterfront Park for the Second Stage Development in the Eastern Rear Complex of Gwangyang Harbor (광양항 동측배후단지 2단계 사업지구 상징공원 및 수변공원 설계)

  • Hong Hyoung-Soon;Kim Do-Kyong;Jeong Han-Ho
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.3 s.116
    • /
    • pp.104-119
    • /
    • 2006
  • The eastern rear business complex of the Gwangyang Harbor (second stage) has undergone the 'alternative bid' process by which a construction company is selected based on their suggestions for an alternative plan and the bid for the construction expenses is based on the previously completed original plan, thereby implicitly accepting the arrangement and scale of the park which was presented in the original plan. It is possible, however, that the concept and plan of each park needs to be approached in a new way within the extent of given design guidelines. This study focuses on the alternative plan process and the Symbol Park (the second neighborhood park) and Waterfront Park (the third neighborhood park) among the five neighborhood parks in the eastern rear business complex (second stage). These two parks provide scale and function for the structure of the park and greenways system at the eastern rear complex. The neighboring waterway is a significant resource for emphasizing the pre-development features of the site. The alternative plan process focuses on determining the resources for the park's plan based on the environmental analyses of the site and utilizing the results. That is, through an analysis of the current state, all available resources are determined and the facilities and activities are derived based on these results. By this, Symbol Park and Waterfront Park reflect the regional features of the eastern rear complex, and these parks will feasibly perform the role of the region's key parte. The limit of this study is the fact that there is no chance for landscape architecture to actively play a role in the creation of the master plan, land utilization plan, and plan for the complex. Therefore there is a problem that the function scale and location of the park are not distributed appropriately in the rear complex. Also the plan for protecting the waterway's shore, a significant resource, only considers the structural stability of the engineering works, degrading the visual and ecological quality. These experiences will be used as a case for further designing the industrial complex and for the resulting park plan.