• Title/Summary/Keyword: hanging scaffolding

Search Result 5, Processing Time 0.021 seconds

A Study on the Accident Reduction Method through Survey of Hanging Scaffolding Use in Building Construction (건축공사 달비계 사용 실태조사를 통한 사고저감 방안 연구)

  • Lim, Hyoung-Chul;Lee, Dong-Heon;Jeong, Seong-Choon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.121-126
    • /
    • 2019
  • Despite the trend of decreasing accidents, falling accidents in the construction industry have not decreased and are even rising. Most major accidents are falling accidents caused by hanging scaffolding and are mostly serious. We conducted a review of the literature, institutions, and regulations, which showed that domestic standards are not unified because they are drawn up by referring to overseas standards for hanging scaffolding. New regulations or standards should be established, which should reflect the safety plans for equipment, work advance plans, education, and management. If facility improvement plan for Hanging Scaffolding and implementation of revision of the current work use, regulations and guides are implemented, it will be recognized in advance of the causes of the accident statistics and the classification system and will be the basis for the implementation of joint efforts by workers, managers, supervisors and owners to reduce accidents.

Analysing Disaster Cases on Construction Sites to Prevent Falling Disaster of Hanging Scaffolding (건설현장 달비계 추락재해 예방을 위한 사례분석 연구)

  • Lim, HyoungChul;Kim, DaeYoung;Jeong, SeongChoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.66-73
    • /
    • 2019
  • Thanks to various efforts to reduce disasters by the government and the Health and Safety Authority, disasters across industries and the construction industry show their reduction trend. However, the falling disasters in the construction industry have not decreased and increased on the contrary. Especially falling disaster caused by Hanging Scaffolding is the most critical disaster which shows low occurrence frequency but is directly connected to death of worker. The working environment for Hanging Scaffolding is poor in domestic construction site. In particular, the Hanging Scaffolding workers in small construction sites are not on the safety control and management by anyone for their works. They are driven to unsafe working condition with mostly uncertified facilities which are made by themselves. Therefore, this study is focused on searching falling disaster factors from the 242 disaster cases caused by Hanging Scaffolding Work in 15 years presented by KOSHA, and trying to provide suggestions for improvement. The improvement of the method of work requires facility improvement and work due to high accident rate caused by unsafe behavior. Analysis of the case of a disaster occurring over the past 15 years shows that no disaster occurred due to problems in the order of operations presented by KOSHA. However, it was found that many accidents resulted from death caused by safety belts not being installed or attached to ropes using safety belts without following the order of work. The most important aspect of improving the work method was the installation and wearing of lifeboats and safety belts.

Revitalization Methods of EIFS for High-rise Residential Buildings through Using TACT and Gangform System with Hanging Scaffolding

  • Lee, Sang-Hyun;Yi, June-Seong;Shin, Seung-Woo;Kang, Hae-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.407-418
    • /
    • 2011
  • Recently energy management measures at the political level, for the purpose of reducing energy consumption in the building sector, are being actively introduced. As a practical method, the exterior insulation method, which is proven to effective in reducing the energy loss through walls, has been favored. In this study, detailed implementations are suggested to activate exterior insulation system which can improve the housing insulation performance. The newly designed Gang-form system with hanging scaffolding was suggested to revamp constructability for finishing outer wall. The research results are based on a multifaceted analysis of the current problems of exterior insulation systems, and on recommendations proposed by exterior insulation experts in the Charrette discussion. The study has indicates that the customized TACT schedule considering the site condition has shortened the construction period to 5 months from 7.5 months. Through utilizing the suggestions of this study, the prevalence of exterior insulation systems is expected to become widespread.

Analysis of Tensile Strength Changes by Outdoor Exposure of Scaffolding PP Fiber Rope (달비계용 PP섬유로프의 야외노출에 따른 인장강도 변화 분석)

  • Sung-Yun Kang;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.31-36
    • /
    • 2023
  • The use of hanging scaffolding for exterior wall painting and cleaning in building construction and maintenance carries the inherent risk of fall accidents. While periodic rope replacement is crucial for preventing accidents resulting from rope breakage, current regulations lack specificity in determining appropriate disposal period for fiber ropes. This study analyzed the tensile strength of the most commonly used PP fiber ropes with different diameters (16 mm, 20 mm) in the domestic construction industry. Additionally, the effect of outdoor exposure was examined by measuring the tensile strength of new ropes and ropes exposing to outdoor conditions for 30 days and 90 days. The results showed that the new ropes and those exposed to outdoor for 30 days met the KS (Korean Standards) criteria for tensile strength. However, a significant decrease in tensile strength was observed in ropes exposed to outdoor for 90 days compared to both the new ropes and those exposed for 30 days. Furthermore, the ropes exposed for 90 days did not meet the KS criteria. These findings indicate the degradation of PP fiber ropes due to UV (Ultra Violet) radiation, highlighting the importance of considering this factor when determining the replacement period for fiber ropes used in scaffolding work.

A Study on Rationalization of Policy, Education, and Equipment Use to Improve the Safety at Height Work Using Rope (로프를 이용한 고소작업의 안전성 향상을 위한 정책, 교육 및 장비활용의 합리화에 대한 고찰)

  • Lim, Kwang sub;Hong, Sungchul
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.3
    • /
    • pp.79-85
    • /
    • 2022
  • The annual statistics on fall fatality consistently show the dangers of working at height. The "Occupational Safety and Health Act" specifies legal restrictions on work at height using a scaffold. However, there are different classes of work at height, and some rely only on ropes. This study proposes education, training, and institutionalization of the "rope access work system." In brief, it was concluded that accurate instruction on the knot method and the setting of some standards were important. For this, the use of an integrated work chair harness equipment was suggested.