• Title/Summary/Keyword: half slab method

Search Result 35, Processing Time 0.018 seconds

Development of Construction Method and Design Guide for Newly Constructed Precast Concrete Pavements (신설 프리캐스트 콘크리트 포장 시공방법 및 설계지침 개발)

  • Kim, Seong-Min;Park, Hee-Beom;Yang, Sung-Chul;Han, Seung-Hwan
    • International Journal of Highway Engineering
    • /
    • v.10 no.2
    • /
    • pp.193-203
    • /
    • 2008
  • This study was conducted to investigate the feasibility of the expedite construction of new pavement systems using precast concrete slabs and to develop the design and construction guide based on the results of the experimental construction. Half scale concrete slabs were designed and fabricated and the optimal reinforcement design, linkages between the slabs in the longitudinal and transverse directions, and the grouting methods were investigated. The experimental construction was performed fast and easily by assembling two slabs in the longitudinal direction and the other two in the transverse direction. The slabs were leveled and the pockets and the space between the slab bottom and the underlying layer were grouted. From the experimental construction, details about the design and construction of the precast pavements were acquired. Finally, the design and construction guide for the newly constructed precast concrete pavement systems was developed.

  • PDF

Evaluation of Stiffness Structure and Grouting Efficiency beneath the Precast Slab Track by Elastic Wave Tests (탄성파시험에 의한 프리캐스트 슬래브궤도의 강성구조와 충전성능 평가)

  • Lee, Il-Wha;Joh, Sung-Ho;Jang, Seung-Yup;Kang, Youn-Suk;Han, Sung-Woo
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1303-1308
    • /
    • 2007
  • Recently, precast concrete tracks are replacing ballast track for efficient and economic maintenance of track. Precast concrete railroad tracks are manufactured in factory, and transported to railroad construction site for installation. Therefore, quality of precast concrete track itself should be sufficiently good. On the contrary to the convenient manufacturing of precast concrete track, the installation of a precast concrete track requires careful steps. Typically, a precast concrete track is placed on an approximately 15-cm thick lean concrete layer. A mortar is filled between lean concrete layer and precast concrete track to adjust the sloping angle of a precast concrete track for a safe train operation at a curvy section. Then, the use of filled mortarproduces a void underneath a precast concrete track, which is harmful to structural safety of a precast concrete track undercyclic loading. Therefore, it is essential to make sure that there is no void left beneath a precast concrete track after mortar filling. In the continuous resonance method, the amplitude of frequency response measured using an instrumented hammer and an accelerometer is plotted against a pseudo-depth, which is half of the wave velocity divided by frequency. The frequency response functions are measured at consecutive measurement locations, 6-cm interval between measurement points, and then combined together to generate a 2-D plot of frequency response. The sections with strong reflections or large amplitude of frequency response are suspicious areas with internal voids and unfilled areas. The 2-D frequency response plot was efficient in locating problematic sections just by examining the color shade of a visualized plot in 2-D format. Some of the problematic sections were drilled to make a visual inspection of mortar filling. The visual image of interface between mortar and precast concrete track was verified using the validity of the continuous resonance technique adopted in this research.

  • PDF

Soil and ribbed concrete slab interface modeling using large shear box and 3D FEM

  • Qian, Jian-Gu;Gao, Qian;Xue, Jian-feng;Chen, Hong-Wei;Huang, Mao-Song
    • Geomechanics and Engineering
    • /
    • v.12 no.2
    • /
    • pp.295-312
    • /
    • 2017
  • Cast in situ and grouted concrete helical piles with 150-200 mm diameter half cylindrical ribs have become an economical and effective choice in Shanghai, China for uplift piles in deep soft soils. Though this type of pile has been successful used in practice, the reinforcing mechanism and the contribution of the ribs to the total resistance is not clear, and there is no clear guideline for the design of such piles. To study the inclusion of ribs to the contribution of shear resistance, the shear behaviour between silty sand and concrete slabs with parallel ribs at different spacing and angles were tested in a large direct shear box ($600mm{\times}400mm{\times}200mm$). The front panels of the shear box are detachable to observe the soil deformation after the test. The tests were modelled with three-dimensional finite element method in ABAQUS. It was found that, passive zones can be developed ahead of the ribs to form undulated failure surfaces. The shear resistance and failure mode are affected by the ratio of rib spacing to rib diameter. Based on the shape and continuity of the failure zones at the interface, the failure modes at the interface can be classified as "punching", "local" or "general" shear failure respectively. With the inclusion of the ribs, the pull out resistance can increase up to 17%. The optimum rib spacing to rib diameter ratio was found to be around 7 based on the observed experimental results and the numerical modelling.

Benefit·Cost Analysis of Combine Method Using Hollow Precast Concrete Column (중공 PC기둥 복합공법의 편익-비용 분석)

  • Kim, Jae-Yeob;Park, Byeong-Hun;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.429-436
    • /
    • 2016
  • Because of the shortage of construction workers due to The rising labor costs and an aging labor force, construction time has been extended. As a solution, The construction time of high-rise buildings can be reduced by adopting precast concrete construction methods. Most relevant studies have focused on the development and structural analysis of such methods and not on their construction management. Therefore, this study focused on the construction management of the hollow precast concrete column (HPC) method. The objective of this study was to evaluate the performance of HPC formulations through the analytic hierarchy process and benefit-cost analysis. After a gap analysis of the available literature and expert interviews, the evaluation criteria were selected. A questionnaire survey was administered to professionals with ample experience in precast concrete construction for the pair-wise evaluation of the benefit and costs of the HPC method. The results show that the benefits of the HPC method outweighed its costs. Therefore, the HPC method is a suitable substitute for the half-slab method.

Influence of Openings on the Structural Behavior of Shear Walls with Slabs (슬래브가 있는 전단벽의 구조적 거동에 대한 개구부의 영향)

  • Choi, Youn-Cheul;Choi, Hyun-Ki;Choi, Chang-Sik
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.1
    • /
    • pp.3-11
    • /
    • 2008
  • An experimental investigation was conducted with half-scale representations of the reinforced concrete shear walls with the opening subjected to cyclic loads. Specimens were half scale representations of a one-story wall in the apartment built in 1980. The area ratio of the opening section, as well as the size and critical section of coupling slabs, were decided based on results from a previous researches. The test result of WS-0.23 specimen, which has artificial damages to install the opening, the strength of the wall decreased due to the opening. It is apparent that influence of cutting reinforcing bars and decrease of effective section area lead to early first yield of the reinforcing bars before the allowable limit of drift ratio of the shear walls was reached. Therefore, proper reinforcing method is needed to prevent this. The decrease of strength of the shear walls by installation of openings shows a great deal of difference compared to previous researches. This is because flexural capacity of the slabs is working as coupling elements for the shear walls. The critical section of coupling slabs that works as coupling elements for shear walls was a little different from the results of previous researches.