• Title/Summary/Keyword: grouting reinforcement

Search Result 213, Processing Time 0.026 seconds

A Study on the Determination of Grout Injection Volume according to the Angle of Mine Cavity (채굴적 경사에 따른 그라우트 주입량 결정에 관한 연구)

  • Lee, Byung-Yoon;Jeon, Seok-Won;Kim, Tae-Hyun;Cho, Jung-Woo;Kim, Kwan-Il;Kim, Tae-Hyok;Kim, Soo-Lo
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.107-122
    • /
    • 2009
  • Insufficient reinforcement for maximizing payability and benefits in mining cavities causes subsidence problems and it threatens residents' lives and properties. So many reinforcement management methods are developed and now various methods are being applied in the field. Among them, a filling method which sends reinforcement materials in the cavities is used extensively. However, domestic geological condition and coal mining methods are so complicate that make many steep cavities. Because of those problems, it is difficult to apply foreign methods directly, which is valid for horizontal cavities. In this study, the injection volume of quick setting grouting material which is developed for filling cavities in domestic condition and the shape of consolidated bodies are investigated. And a programming method for estimating proper injection amounts of filling materials is proposed. The results are verified by numerical analysis using UDEC.

Mixed Design of Grouting Materials for Settlement Restoration Using Micro Cement (마이크로시멘트를 이용한 침하복원용 그라우팅재료의 배합 설계)

  • Lee, Il-Wha;Lee, Sung-Jin;Yun, Won-Min;Park, Sung-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1786-1792
    • /
    • 2011
  • If the concrete track is settled excessively, it must be restored or reinforced immediately. Especially, reinforcement/restoration method should be applied without affecting on train operation. To deal with this problem, special equipment, process and material should be prepared. This paper suggest a special mixing ratio to restore the settled concrete track. Materials are classified the quick hardening mortar and the middle hardening mortar. The quick hardening mortar is used to restore the settled track and the middle hardening mortar is used to fill the void. These materials must have the appropriate gel time(1-40sec) and compressive strength($5kg/cm^2$). Various compounds is used and the micro cement is used as a main base.

  • PDF

Deformation Behavior and Reinforcement Design of a Tunnel Excavated in Weak Rock by the NATM (연약암반에 굴착되는 NATM 터널의 변형거동과 보강설계)

  • 서영호;이정인
    • Tunnel and Underground Space
    • /
    • v.3 no.2
    • /
    • pp.132-141
    • /
    • 1993
  • Laboratory and field tests were performed to find out the effectiveness of ground improvement by grouting for an urban subway tunnel that was excavated in weak rock by the NATM. Field measurements were carried out to monitor the behavior of rock mass around the tunnel and to ensure the validity of the current design of the distance form the measuring points to the tunnel face. The final converged displacement and the peroid were predicted using the gamma function. It was found that the ground improvement in terms of reduced permeability and increased stength in the self-supportability of the excavation face enabled the NATM applied in poor gorund. As the result of applying the gamma function to the predicting of displacement, the final displacement including the preceding one and the converged period could be approximately predicted at the early excavation stage.

  • PDF

Reinforcement Effect of Marine Structure Foundation by Column Jet Method (CJM 그라우팅에 의한 호안구조물의 기초보강효과)

  • 천병식;양형칠
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2001.10a
    • /
    • pp.128-131
    • /
    • 2001
  • The purpose of this study is to investigate the application of Column Jet Method(CJM) as countermeasure against settlement and slope sliding of existing marine structure due to embankment load behind reclaimed revetment. CJM is to make high-strengthened body by compacting and grouting cement mortar after forming artificial space in the ground with ground relaxition machine or high pressure water jetting. Before the ground was reinforced by CJM, the result of slope stability analysis was not satisfy the allowable safe ratio, but after the ground was reinforced by CJM, the stability of slope was over the allowable safe ratio and stable, Therefor, the application of CJM to restraint settlement and sliding of marine structure was very satisfactory.

  • PDF

The Ground Reinforcement on Daylight Collapsed Block in Driving Work at the National Road No. 3 Line (국도 3호선 터널건설 공사 중 붕락구간에 대한 지반보강)

  • 천병식;정덕교;이태우;정진교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.02a
    • /
    • pp.14-22
    • /
    • 1999
  • Daylight collapse have been occurred by about 6.$^{0}$ m deep at ground surface which connected to the ground surface and excessive overbreak have been occurred by the space and height of 3.$^1$~6.$^2$m at crown head part of the tunnel during tunnelling of lower-half part after completing upper-half part on tunnelling of a phyllite mountain by NATM method at the construction work of two way-double track national road. This study is a successful illustration case of earth improvement by confirming structural safety of the tunnel in a whole through solving the cause of the tunnel collapse and the work have completed successfully through applying such earth strengthening method as cement mortarㆍcement milk injection, S.G.R, steel pipe reinforced multi-step grouting etc.

  • PDF

Investigation and Design of Underground Cavern for Oil Storage in Korea (국내원유비축지하공동의 조사 및 설계)

  • Kim Chee Whan;Lee Seok Chun
    • Explosives and Blasting
    • /
    • v.12 no.1
    • /
    • pp.32-38
    • /
    • 1994
  • This study Is to summarize the contents for the investigation and design of the construction for oil storage. Since underground caverns are large scale, in their construction one should consider the mechanical stability of cave·rns and the economic view of construction. On the basis of them, cavern's section and layout were determined and water curtains were designed to maintain hydraulic equilibrium so that gases were sealed tightly. Also the supporting criteria for rock bolt and stotcrete were determined by means of the classification of rock masses and the results of finite element method. The criteria of grouting reinforcement were presented according to the results of injection test in the pilot holes of working face.

  • PDF

The Lower Part Landsliding of Embankment Dam According to a Heavy Rainfall and the Reinforced Design for Their Protection (필(흙)댐체의 하부 성토법면의 붕괴에 따른 안정성 확보에 대하여)

  • Hwang, Seong-Chun;Oh, Byung-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.23-34
    • /
    • 2006
  • In a oo dam at oo city of Gyeongbuk, severe damages have been occurred on lower part of dam due to heavy rainfall for several years. This caused significant impediment for maintaining its original function. This is considered as an excellent case for overall improvement of stability of dam system through successful investigation and construction work. This paper present comprehensive specifications that are generalized and used for securing stability of dams by quoting this example.

  • PDF

Investigation and Design of Underground Cavern for Oil Storage in Korea (국내 원유 비축 지하공동의 조사 및 설계 사례)

  • 김치환
    • Tunnel and Underground Space
    • /
    • v.2 no.2
    • /
    • pp.190-198
    • /
    • 1992
  • This study is to summarize the contents for the investigation and design of the construction for oil storage. Since underground caverns are large scale, in their construction one should consider the mechanical stability of caverns and the economic view of construction. On the basis of them, cavern's section and layout were determined and water curtains were designed to maintain hydraulic equilibrium so that gases were sealed tightly. Also the supporting criterial for rock bolt and stotcrete were determined by means of the classification of rock masses and the results of finite element method. The criteria of grouting reinforcement were presented according to the results of injection test in the pilot holes of working face.

  • PDF

A Case Study of Ground Improvement on Railroad Station Foundation by the Application of CGS Method. (역사기초 보강 공법으로써 CGS 공법 적용사례 연구)

  • Yeoh Yoo-Hyeon;Chun Byung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1065-1070
    • /
    • 2004
  • Recenlty, there are many cases that structures are constructed on soft ground in domestic. Generally in those cases, appropriate geotechnical techniques for the ground are needed. In this study, an example for ground improvement of OO railroad station construction site is introduced and analyzed. The ground conditions of this site which is soft ground are that N value is under 6, average depth and ground water table is 24.4m, GL-1.7. So, as a countermeasure technique for bearing reinforcement, Compaction Grouting System (CGS) method was applied on construction site. To estimate the application of CGS method, piezo cone penetration test and static pile loading test were carried out during the construction. Results of analysis show that CGS method for improving the bearing capacity of soft ground is applicable for the ground well.

  • PDF

Evaluation of the Applicability of FRP Grouted Reinforcing Method for Rock Slopes (암반사면에서 FRP 보강 그라우팅 공법의 적용성 평가)

  • Kim, Seong-Chan;Lee, Dal-Won
    • Korean Journal of Agricultural Science
    • /
    • v.35 no.2
    • /
    • pp.213-223
    • /
    • 2008
  • The instability of rock slopes caused by heavy rainfall and soil mass sliding needs the preventable and reinforcing method. The most important factor for the stability is the shear strength available in the planar part of the failure surface, which shows that a progressive failure takes place and a reinforcing of rock slope using FRP grout is effectively available. In this study, a grouting bolting interval predictions by limit equilibrium analysis and Matlab mathematical computer codes in several cases is presented for FRP reinforced rock slope. The proposed mathematical computer code can be easily applied for seeking properly FRP grout intervals prior to design and execute a reinforcement of a rock slope in practice.

  • PDF