Measurement used electrical sounding(MacOHM 2115, Japan) for large scale grounding resistance of So-Yang Dam hydroelectric power plant. To applied measurement method is fall of potential method. This result propose to method of efficient administration for grounding system.
The grounding of an electrical system is one of the essential elements for public safety. Domestic practice of grounding system design has been to get grounding resistance values which are classified by facilities or equipment in the regulations. But the concept of grounding system design of IEC is, as a main factor of safety index, to consider touch voltage and step voltage instead of the resistance value itself. Recently IEC actively develops or revises safety related standards which are essential for the grounding system performance. In this paper, we present the recent trend of the international standards on the safety criteria for Electric Shock Protection.
The electric safety tends to be more important according to electric facilities's increase and its use in these days. This paper analyzes soil resistivity of two areas in the country using CDEGS(Current Distribution, Electromagnetic Interference, Grounding and Soil Structure, Canada). We designed rod and mesh grounding system and made a comparative study of ground resistance, GPR(Main Electrode Potential Rin), step voltage and touch voltage. Then we could analyz only the safety but also economical efficiency in elocution of grounding. As a result of simulation, ground resistance, GPR(Main Electrode Potential Rise), step voltage and touch voltage became higher in proportion to soil resistivity. Therefore we expect to estimate the propriety of grounding system design through accumulation and analysis of data in consideration of characteristics of soil.
This paper describes the analysis of deterioration characteristics for connection factor used in grounding system. The connection method of grounding system is specified in IEC standard. In order to analyze the deterioration characteristics for connection factor, deterioration test was carried out when the connection factor was buried in salt water and underground. The test connection factors were C-type sleeve, clamp, and exothermic welding. As a consequence, most of the connection factor was corroded, and the electrical resistance decreased after deterioration. The analytical results can be used to establish the safety of grounding system.
Presently, typical maximum probe spacing of soil resistivity survey(Wenners 4 pin method) is 20 m in case of 154 K substation grounding design of KEPCO. This paper examined the effects of maximum probe spacing of wenner method on the equivalent soil modeling and the accuracy of grounding resistance measurement by comparing the calculated FOP(Fall-of-Potential) curves of various soil models with the measured one at 154kV H substation. The comparison results showed that the inaccurate estimation of deep soil resistivity, which is caused from the short probe spacing of soil resistivity survey, can produce large errors on measurement of grounding resistance. In this paper a quantitative analysis of FOP at H substation has been presented.
In this paper, we investigate the grounding installation using grounding electrode into the earth in order to protect the power transmission line and transmission system and to improve the reliability of operations. Grounding electrode into the earth that has small grounding resistance is found to be very cost effective compare to other electrode systems by the ease of installation and making the earth damage small.
This paper presents the error factors of Fall-of-potential test method used in measurements of the grounding-system impedance. This test methods inherently can introduce two possible errors in the measurements of grounding-system impedance: (1) ground mutual resistance due to current flow through ground from the ground electrode to the current probe, (2) ac mutual coupling between the current test lead and the potential test lead. The errors of ground mutual resistances and ac mutual coupling are expressed by the equation in calculating grounding impedance. These equations were calculated by Matlab that is commercial tool using mathematical calculation. The results of calculation were applied to correct grounding impedance.
국내 외 메쉬접지극은 격자형태의 등간격 접지Grid로 설계하고 있다. 격자형 접지Grid의 경우 구석의 접촉전압이 중심 부분에 비해 높아지는 문제점이 있다. 이러한 문제점을 극복하기 위해 사선형태의 접지 Grid를 사용하면 메쉬전압이 발생하는 구석부분의 면적이 감소함으로써 메쉬전압이 감소한다. 따라서 본 논문에서는 기존의 격자형태의 접지Grid의 형태와 다르게 사선형태의 접지Grid를 제안하며, 격자형태의 접지Grid와 사선형태의 접지Grid로 설계된 메쉬접지극에 동일한 접지설계제원을 적용하고 메쉬전압, GPR, 접지저항, 접지도체의 총길이를 비교 검토하여 사선형태 접지Grid의 우수성을 검증하였다.
The Korean distribution system consists of overhead ground wire (OHGW), phase conductors and neutral wire. Especially, OHGW is installed over the phase conductors to protect distribution system from the lightning surge. The flashover rate and the magnitude of lightning overvoltage on distribution system can be affected by grounding condition of OHGW such as grounding resistance and grounding interval. In this paper, we conduct an analysis of lightning overvoltage and flashover rate according to the grounding condition of OHGW. The distribution system and lightning surge are modeled by using ElectroMagnetic Transient Program (EMTP). Also, the Monte Carlo method is applied to consider random characteristics of lightning, and the flashover rate is calculated based on IEEE std. 1410. The simulations are performed by changing the grounding resistance and interval of OHGW and the simulation results are analyzed.
This paper deals with analysis of complex grounding system using electromagnetic simulation method. Electrical devices could be damaged by transient voltage such as a lightning surge. Therefore the measures to protect the equipments from transient, such as a lightning are required. The ground system is important in this respect. The representative parameter of grounding system performance is earth ground resistance. Precise prediction of earth resistance is required, because it is difficult to modify and change after the completion of the grounding system construction. Numerical modeling is often used in numerical analysis to identify the electrical characteristics of the grounding system. However complex systems are difficult to predict grounding characteristics by numerical analysis. If the total electric field of the earth in general is similar to the antenna model, in that the incident electric field and expressed as a sum of the scattering field. In this study, the electromagnetic field simulation tool "ANSYS HFSS" module containing the antenna model was used to analyze performance of ground system. Both the simple and complex grounding system were analyzed by simulation tool and experimental method. As a result simulation method is effective to predict performance of a complex ground system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.