Using the EMTP(Electro Magnetic Transient Program) for the analysis of lightning direct voltage on the railway system, the shielding effects of overhead grounding wire on the railway were studied quantitatively. Installation of overhead ground wire and gap-type arrester such as s-horn Provides a 6.6㎸ HV distribution line with good protection effects. Even severe lightning induced voltage were create, 6.6㎸ HV lines can be withstand.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.56
no.2
/
pp.109-114
/
2007
This paper summarize about the auxiliary electrode measured a ground resistance. The method to measure a ground resistance is the fall-of-potential method to using an auxiliary electrode. And an auxiliary electrode must be set up on the ground. Today it is so difficult to set up the auxiliary electrode on the ground because of many concrete building and many paved roads. So this paper is regarding a trust analysis of the ground resistance measurement by the substitute auxiliary electrode. It substituted a iron structure around the building, a neutral line multiplex ground to earth, a wire net for auxiliary electrode. This information is confirmed bv compared with the measurement value.
In the splay manufacturing process, conveyor systems are widely used for conveying panels. In this conveyor, a large number of grounding lines are used in order to prevent a product failure due to static electricity. In many cases, the grounding line is disconnected due to the rotation of the transporting roller or curling, leading to product failure. In order to solve such a problem, there is a growing need for a system capable of detecting disconnection of a ground wire in real time. Therefore, in this paper, we propose a disconnection monitoring system of ESD (Electro-Static Discharge) ground wire caused by friction between the conveyor drive part and the panel. The proposed system is a monitoring system that can detect disconnection and disconnection of ground wire using ATmega 2560 and Wheatstone Bridge circuit. It can detect disconnection of ground wire immediately and can take measures to reduce the defect rate due to static electricity. The system proposed in this paper is expected to be applicable to the production and test equipments of all industries where the ground wire is used.
Kim Jae-Kwan;Jung Chae-Kyun;Lee Jong-Beom;Cho Han-Goo;Seo Je-Ho
The Transactions of the Korean Institute of Electrical Engineers C
/
v.54
no.6
/
pp.279-285
/
2005
The lightning causes the damage of power system equipments as well as large power failure. Therefore, the insulation design should be established not only to decrease the damage of the facilities itself but also to increase the reliability of electric power system. This paper describes the useful way applying underbuilt ground wire and guy wire in transmission tower that safely protect the substation equipments. One or more shield wires under the phase conductor will not intercept lightning stroke, but they may improve reduce lightning voltages almost as effectively as if they were above the phase conductors. And the guy wires will mitigate the tower surge response. These would not only reduce backflashover possibility but also minimize crest and duration of surges entering the substation. EMTP is used to analyze the efficiency of the proposed methods.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.3
/
pp.331-337
/
2014
The Korean distribution system consists of overhead ground wire (OHGW), phase conductors and neutral wire. Especially, OHGW is installed over the phase conductors to protect distribution system from the lightning surge. The flashover rate and the magnitude of lightning overvoltage on distribution system can be affected by grounding condition of OHGW such as grounding resistance and grounding interval. In this paper, we conduct an analysis of lightning overvoltage and flashover rate according to the grounding condition of OHGW. The distribution system and lightning surge are modeled by using ElectroMagnetic Transient Program (EMTP). Also, the Monte Carlo method is applied to consider random characteristics of lightning, and the flashover rate is calculated based on IEEE std. 1410. The simulations are performed by changing the grounding resistance and interval of OHGW and the simulation results are analyzed.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.9
/
pp.1374-1379
/
2012
Urban rail transit tends to global grounding system in order to control ground potential rise and potential differences between electric equipments. In addition, global grounding system can discharge the large capacity surge current to the ground safely. Since some railway electric equipments are installed all section of line, the global grounding system connected with the connecting grounding wire is more effectively. However, if the fault occurred in the connecting grounding wire area, some dangerous voltage is generated. So, the installation of additional grounding rod will be required. In this study, the global grounding system is simulated using CDEGS program to analyze the divergence spacing of additional ground rod depending on dangerous electric potential characteristics. Grounding net of the each station is modelled in depending on the size of the platform, and the spacing of the connecting grounding rod are compared 50m, 100m, 250m and 400m. Simulation results considering of earth resistivity and underground condition of the connecting grounding wire, spacing of the connecting grounding rod is that less than 250m to spacing of the ground rod was appropriately confirmed.
본 논문에서는 기존의 가공지선(GW, Ground Wire)을 OPGW(Optical Ground Wire)로 교체공사를 할 경우 나타나는 절연로프에서의 건조대 아크현상을 수치적인 모델링를 통하여 해석할 수 있는 프로그램을 제작하고 현장조건을 입력하여 문제점을 판단하고 해결할 수 있는 방안을 제시하고자 한다.
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.38
no.1
/
pp.58-68
/
2002
The model experiments for the Eastern sea bottom trawl were conducted for the 3 types of ground ropes and 2 types of seabeds to examine drag characteristics according to towing speed. The model net was based on the net of trawler with 750ps and made by 1/78 of a full scale net. This experiments focused on the drags for 3 types of ground rope, the serving wire, the original and the chain types and 2 types of seabeds, mud and sand of bottom. The results obtained are summarized as follows 1. In the case of the sand bottom, the drags by 3 types of ground rope were orderly increased in turn of the chain, the serving wire and the original type. But, in the case of the mud bottom, the drag of the original type is higher than that of the serving wire type and less than the chain type. 2. In the case of the serving wire type of ground rope, the drags by the diameters of ground rope, ø 1.3, ø 1.9, ø 2.6 and ø 3.25 were increased respectively by 23g, 25g, 32g and 42g at the towing speed of 0.4m/s. 3. The drags of ground ropes were increased exponentially in proportion to the towing speed, in the same way in all of three types of ground rope. 4. The ratios of drag of ground rope against that of the trawl net by the type of ground rope at the towing speed of 0.4m/s on the mud bottom were 0.69 in the chain type, 0.64 in the serving wire type and 0.67 in the original type respectively. 5. The Coefficient of drag($C_d$) by type of ground rope according to the towing speed were 10.0~56.7, 3.0~l6.0 and 1.5~8.5 respectively in turn of the chain type, the serving wire type and the original type on the mud bottom, and that on the sand bottom were 10.0~60.0, 3.0~14.0 and 1.2~6.0 respectively In turn of the chain type, the serving wire type and the original type.
An, Chang-Gyun;Choi, Bong-Yeon;Kim, Mi-na;Kang, Kyung-Min;Lee, Hoon;Won, Chung-Yuen
Proceedings of the KIPE Conference
/
2019.11a
/
pp.106-107
/
2019
This paper propose a new 3D SVM method for three-phase four wire inverter for fault isolation at a single line ground fault. The available switching combination for isolation of a single line ground fault was analyzed. Using this method, voltage vector diagrams according to each switching combination were classified according to various ground fault situations, and 3D SVM method was performed by generating command for fault isolation. The proposed methods are mathematically analyzed and verified by PSIM simulation.
In order to reduce ground vibration during tunnel excavation, a free surface blasting method has been applied in which a partial free surface is formed on the excavation surface and controlled blasting is performed. In this study, the ground vibration reduction due to artificial joints was evaluated by forming artificial joints on center cut using diamond wire saw and comparing the ground vibration caused by center cut blasting. As a result of comparison, ground vibration was reduced by artificial joints center cut blasting more than normal center cut blasting, and the ground vibration reduction effect of horizontal artificial joints center cut blasting was evaluated more than that of vertical artificial joint center cut blasting.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.