• Title/Summary/Keyword: ground water level condition

Search Result 96, Processing Time 0.02 seconds

An investigation on the ground collapse mechanism induced by cracks in a non-pressurized buried pipe through model tests (모형시험을 통한 비압력 지중관거 균열로 인한 지반함몰 메커니즘 연구)

  • Kim, Yong-Key;Nam, Kyu-Tae;Kim, Ho-Jong;Shin, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.235-253
    • /
    • 2018
  • Groundwater flow induced by cracks in a buried pipe causes ground loss in the vicinity of it which can lead to underground cavities and sinkhole problems. In this study, the ground collapse mechanism and the failure mode based on an aperture in the pipe located in cohesionless ground were investigated through a series of physical model studies. As the influence parameters, size of the crack, flow velocity in the pipe, groundwater level, ground cover depth and ground composition were adopted in order to examine how each of the parameters affected the behavior of the ground collapse. Influence of every experimental condition was evaluated by the final shape of ground failure (failure mode) and the amount of ground loss. According to the results, the failure mode appeared to be a 'Y' shape which featured a discontinuous change of the angle of erosion when a groundwater level was equal to the height of the ground depth. While in the case of a water table getting higher than the level of ground cover depth, the shape of the failure mode turned to be a 'V' shape that had a constant erosion angle. As the height of the ground depth increased, it was revealed that a mechanism where a vertically collapsed area which consisted of a width proportional to the ground height and a constant length occurred was repeated.

Hydrogeochemical Environmental Research in Nitrate Contamination in Alluvial Fan Area Groundwater in Tsukui, Central Japan (일본 츠꾸이 선상지 지하수의 질산성 질소 오염에 대한 수문지구화학적 연구)

  • Okazaki, Masanori;Ham, Young-Sik
    • Korean Journal of Ecology and Environment
    • /
    • v.37 no.4 s.109
    • /
    • pp.431-435
    • /
    • 2004
  • A nitrate-contaminated groundwater was hydrogeochemically investigated to estimate the factors controlling groundwater quality in an alluvial fan area. Even though monthly groundwater levels increased with monthly rainfalls, the monthly $NO_3^--N$ concentrations in groundwater showed a small variation, mostly exceeding a maximum contaminant level of 10 mg $L^{-1}$ in environmental quality standards for groundwater during 2003. The 2003 annual groundwater recharge was 1,730 mm =20,056 mm-18,326 mm. Where 20,056 mm and 18,326 mm are annual sum of daily increase and decrease in ground water level. However, the annual sum of increase in ground water level (20,056 mm) was approximately 10 times higher than annual rainfall. Moreover, the annual sum of daily ground water level decrease (-18,326mm) showed that a large amount of groundwater was discharged with $NO_3^-$-contamination. Hydrogeochemically, a large amount of groundwater input and output through the alluvial fan area were observed after rainfall with a considerably high concentration of $NO_3^-$. Consequently, this alluvial fan area including forest area reflects on the evidence under the condition of 'nitrogen excess' or 'nitrogen saturation'. In addition, such a large amount of groundwater outflow can cause environmental damage in surface water, associated with $NO_3^-$- contamination. This study also expects that this hydrogeochemical data will be useful for water management.

A Physical Model Test on the Behavior of Shield-tunnel Lining According to Drainage Conditions in Weathered Granite Soil (화강풍화토 지반에서 배수조건에 따른 쉴드터널 라이닝의 거동연구를 위한 모형실험)

  • Choi, Gou-Moon;Yune, Chan-Young;Ma, Sang-Joon
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.6
    • /
    • pp.71-82
    • /
    • 2015
  • Recently, due to the expansion of urban infrastructure for the citizen convenience, the shield tunnel construction has increased considering the civil complaints minimization and construction stability. Most shield tunnels are designed based on the assumption of the undrained condition that underground water does not inflow, but they are operated in the field as drained tunnels with drainage facility to drain underground water. Therefore, the drained condition needs to be considered in the shield tunnel design. It is also necessary to consider the weathered granite soil that is widely distributed throughout the country and consequently is encountered in most of construction sites. In this paper, the model test which can control total stress and pore water pressure and simulate the underground tunnel located in the weathered granite soil below ground water level is conducted. Total stress, pore water pressure and an inflow water into an inner pipe were measured using the testing device. Test results showed that the total stress in a drained condition was lower than in an undrained condition because pore water pressure decreased in a drained condition and an inflow water into an inner pipe was proportional to the loading stress in a drained condition. As a result, if a drained condition is considered in the shield tunnel design, the more economical design can be expected because of the stress reduction of the lining.

Centrifuge Model Tests on Characteristics in Forced Replacement Method for Soft Ocean Ground to Build Coastal Structures (해안구조물 축조를 위한 해양연약지반의 강제치환 특성에 관한 원심모형실험)

  • Park, Byung-Soo
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.5 s.72
    • /
    • pp.42-48
    • /
    • 2006
  • This paper shows theresults of centrifuge model experiments to investigate the behavior of a replacement method in dredged and reclaimed ground. For this experimental work, centrifuge model tests were carried out to investigate the behavior of a replacement method in soft clay ground. Basic soil property tests were performed to find the mechanical properties of clay soil sampled from the southern coast of Korea, which was used for the ground material in the centrifuge model tests. The reconstituted clay ground of the model was prepared by applying reconsolidntion pressure in a 1 g condition with a specially built model container. Centrifuge model tests were carried out under the artificially accelerated gravitational level of 50 g. Replacement material of lead with a certain degree of angularity was used and placed until the settlement of the replacement material embankment reached a state of equilibrium. Vertical displacement of the replacement material was monitored during tests. The depth and shape of the replacement, especially the slope of the penetrated material and the water content of the clay ground were measured after finishing tests. Model tests for investigating the stability of an embankment after backfilling were also performed to simulate the behavior of a dike treated with replacement and backfilled with sandy material. As a result of the centrifuge model test, the behavior of the replacement, the mechanism of the replacement material being penetrated into clay ground, and the depth of the replacement were evaluated.

Evaluation of Roofing Potential at the Ground-structure Interface (지반-구조물 경계면의 루핑 포텐셜 평가)

  • Park, Jeongman;Kim, Kanghyun;Shin, Jongho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.3
    • /
    • pp.25-33
    • /
    • 2018
  • Piping is one of the most frequently occurring collapse type of a levee, and is often caused by roofing (backward erosion piping) at the ground-structure interface. Roofing is generally evaluated using creep ratio. However, creep ratio does not take into account the characteristics of the ground-structure interface. In this study, the roofing risk was investigated by using model test and numerical analysis considering the ground-structure interface characteristics. In the model test, it was confirmed that the piping potential decreased as the interface roughness increased, and this was applied to the numerical analysis. Existing numerical methods can not adequately simulate the particle behavior at the ground-structure interface because only the water level difference is considered. In this paper, particle behavior at the interface was investigated by performing seepage analysis and then, carrying out particle analysis technique simulating the boundary condition of the ground-structure interface. Analysis results have shown that the roofing resistance decreases as the ground-structure interface roughness decreases.

The Fluid Loss and Sealing Mechanisms in Slurry Trench Condition (II) : Finite Element Models of Fluid Loss for a Slurry Trench (Slurry wall 공법에서 안정액의 역할 (II) : 유한요소해석법 적용)

  • Kim, Hak-Moon
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.4
    • /
    • pp.249-256
    • /
    • 2002
  • The stability of slurry trench system is closely associated with the characteristics of the filter cake (assumed impervious membrane) transferring the hydrostatic force of slurry to the trench walls. The effectiveness of this assumption in a wide range of trench systems has been examined with the aid of a Finite Element program. Build up of excess porewater pressure in the soil mass behind the filter cake is a function of the slurry density, the properties of filter cake, the ground conditions, time, the geometry of trench and the original ground water level. These factors were all investigated by the Finite Element Method. The most significant factors were found to be the ground conditions and the properties of filter cake.

The non-shrinkage grout to use ground fly ash as admixture

  • Kim, Yoo;Chu, Yong-Sik;Seo, Sung-Kwan;Kim, Jang-ho Jay
    • Journal of Ceramic Processing Research
    • /
    • v.19 no.6
    • /
    • pp.509-513
    • /
    • 2018
  • This study uses fly ash for non-shrinkage grout in order to develop strength of grout and improve its durability. We grind fly ash to the extent of $7,000cm^2/g$ and use ground fly ash and raw fly ash respectively at the proportion of 10%, 20%, 30% instead of OPC and compare the results drawn on the condition of each proportion. As a mixed material of grout, EVA and water-reducing agent is added in order to prevent bleeding and improve segregation resistance, CSA is added with a view to preventing drying shrinkage and improving early strength property. In regard to flow and flow time test for analyzing and evaluating workability, it is revealed that grouts of all mix proportions except raw fly ash 30% mix proportion satisfy all performance criteria. With regard to length change rate, grout with no admixture shows the highest shrinkage rate, but the rate is 0.0005%, extremely insignificant rate. As material age increases, compressive strength of two grouts, that is to say ground fly ash 10% and 20%-used grouts, exceed that of grout with no admixture or show high-level compressive strength.

A Study on the Effectiveness of Radar Rainfall by Comparing with Flood Inundation Record Map Using KIMSTORM (Grid-based KIneMatic Wave STOrm Runoff Model) (분포형 강우유출모형 KIMSTORM을 이용한 침수실적자료와의 비교를 통한 레이더강우의 효용성 연구)

  • Ahn, So Ra;Jung, Chung Gil;Kim, Seong Joon
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.11
    • /
    • pp.925-936
    • /
    • 2015
  • The purpose of this study is to explore the effectiveness of dual-polarization radar rainfall by comapring with the flood inundation record map through KIMSTORM(Grid-based KIneMatic wave STOrm Runoff Model). For Namgang dam ($2,293km^2$) watershed, the Bisl dual-polarization radar data for 3 typhoons (Khanun, Bolaven, Sanba) and 1 heavy rain event in 2012 were prepared. For both 28 ground rainfall data and radar rainfall data, the model was calibrated using observed discharge data at 5 stations with $R^2$, Nash and Sutcliffe Model Efficiency (ME) and Volume Conservation Index (VCI). The calibration results of $R^2$, ME and VCI were 0.85, 0.78 and 1.09 for ground rainfall and 0.85, 0.79, and 1.04 for radar rainfall respectively. The flood inundation record areas (SY and MD/SG district) by typhoon Sanba were compared with the distributed modeling results. The spatial distribution by radar rainfall produced more surface runoff from the watershed and simulated higher stream discharge than the ground rainfall condition in both SY and MD/SG district. In case of MD/SG district, the stream water level by radar rainfall near the flood inundation area showed 0.72 m higher than the water level by ground rainfall.

Flood Forecasting for Pre-Release of Taech'ong Reservoir (대청댐 예비 방류를 위한 홍수 예보)

  • Lee, Jae-Hyeong;Sim, Myeong-Pil;Jeon, Il-Gwon
    • Water for future
    • /
    • v.26 no.2
    • /
    • pp.99-105
    • /
    • 1993
  • A practical flood forecasting model(FFM) is suggested. The output of the model is the results which the initial condition of meteorological parameters and soil moisture are projected on the future. The physically based station model for rainfall forecasting(RF) and the storage function model for runoff prediction(RP) are adopted respectively. Input variables for FFM are air temperature, pressure, and dew-point temperature at the ground level and the flow at the rising limb(FRL). The constant parameters for FFM are average of optimum values which the past storm events have. Also loss rate of rainfall can predicted by FRL.

  • PDF

Preventing disaster system of the subaqueous tunnel under the Han river in the Bundang railway (분당선 한강 하저터널의 방재시스템)

  • Kim Yong-Il;Hwang Nak-Yeon;Yoon Young-Hoon;Jie Hong-Keun;Jang Sung-Wook;Kim Dong-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.308-327
    • /
    • 2004
  • As use of tunnels and subways increase there also are accidents proportionate to it. Daegu Subway Station fire, Hongjimoon tunnel fire led people to be conscious of disaster protection and as a result, there is a trend to adopt standards for fire protection. Accordingly, this thesis is focused on investigating various fire and water protection related issues for subaqueous tunnel under Ran river. The thesis developed evacuation and disaster prevention plan as fire level increases and have identified the suitability of disaster prevention through evacuation and fire simulation, countermeasure of a water leakage during construction and operation considering the subaqueous tunnel. And we selected EPB shield TBM equipment considering the ground condition and effect of boring hole, and accomplished reasonable water protection design through setting goals using event-tree method, as well as examining model test of boring hole and flooding in heavy rain. Also included structured total system consist of water leakage sensing system, water protection gate, pumping system and fire protection system to respond systematically in emergency.

  • PDF