Pillar stability in very near-twin tunnels (초근접 병설터널의 필라 안정성 확보)

  • Kim, Donggyou;Koh, Sungyil;Lee, Jeongyong;Lee, Chulhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.699-714
    • /
    • 2022
  • The objective of this study is to suggest a safe and economical pillar reinforcement method when very near-twin tunnels with a minimum interval of 1 m passes through a soft zone such as weathered soil or weathered rock. A standard cross-sectional view of a two-lane road tunnel was applied to suggest a pillar reinforcement method for the very near-twin tunnels. The thickness of the pillar was 1 m. The ground condition around the tunnel was weathered soil or weathered rock. There were four reinforcement methods for pillar stability evaluation. These were rock bolt reinforcement, pre-stressed steel strand reinforcement, horizontal steel pipe grouting reinforcement, horizontal steel pipe grouting + prestressed steel strand reinforcement. When the ground condition was weathered soil, only the pillar reinforced the horizontal steel pipe grouting + prestressed steel strand did not failed. When the ground condition was weathered rock, there were no failure of the pillar reinforced the horizontal steel pipe grouting or the horizontal steel pipe grouting + prestressed steel strand. It is considered that the horizontal steel pipe grouting reinforcement played a role in increasing the stability of the upper part of the pillar by supporting the upper load applied to the upper part of the pillar.

A CASE STUDY OF FEM ANALYSIS ON GROUND REINFORCEMENT USING HORIZONTAL JET GROUT ROOFING IN SOFT GROUND TUNNELING (연약 지층 터널의 보강공법에 관한 FEM 해석 사례연구)

  • 김주봉;문상조
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.10a
    • /
    • pp.51-56
    • /
    • 1993
  • This paper presents the FEM anlysis results performed to assess the applicability of Horizontal Jet Grout Roofing, and of ground improvement methods for tunneling in soft ground. Horizontal Jet Grount Roofing Method is applicable to ensure the stability of tunnel face in non-cemeted alluvial strata under high ground water pressure. For applying this method, to ensure the reliability, the Horizontel Jet Grout Roofing should be double lined with pre-grouting to reduce the water inflow during the jet grouting.

  • PDF

A study on the characteristics of tunnel deformation and support system according to tunnel portal reinforcement method (터널 갱구부 보강방법에 따른 터널 변형 및 지보재 응력특성에 관한 연구)

  • Moon, Kyoung-Sun;Seo, Yoon-Sic;Kang, Si-On;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.625-639
    • /
    • 2018
  • This study is about the reinforcing type of reinforcement method which is reinforced in tunnel portal of tunnel with bad ground condition. Generally, it is known that the horizontal reinforcement method is more effective than the conventional reinforcement method. However, as a limitation of the tunnel construction technology, it is being constructed by the superposition reinforcement method. In recent years, high-strength large-diameter steel pipes and horizontally oriented longitudes (L = 30.0~50.0 m) construction technology have been developed. Therefore, it is required to study reinforcement method of tunnel portal reinforcement method. Therefore, 3-D numerical analysis (Midas GTS NX 3D) was performed by setting the reinforcement method (No reinforcement type, overlap reinforcement type and horizontal reinforcement type) and ground condition as parameters. As a result, it was considered that the reinforcement effect was the largest as the horizontal reinforcement type of the reinforcement method was the smallest in the displacement and the support material stress. Based on the results of the numerical analysis, horizontal steel pipe grouting was applied to the actual tunnel site. The displacement of the tunnel portal and the stress of the support material occurred within the allowable values and were considered to ensure sufficient stability.

The Ground Reinforcement on Daylight Collapsed Block of Crown Head in the Face of the Tunnel of Highway (고속도로 터널막장 천단부의 붕락구간에 대한 지반보강)

  • 천병식;정덕교;한기식;정진교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.323-330
    • /
    • 1999
  • Daylight collapse have been occurred by about 5.0m deep at ground surface and collapse of the crown head part of the tunnel have connected to the ground surface during first step of shotcrete work after blasting of upper half section of the tunnel driving at two-way double track tunnel face section on highway construction. This study is for a successful illustration case for the earth improvement method through applying such strengthening methods as cement milk grouting, S.G.R grouting,, steel pipe reinforced multi-step grouting etc. for the purpose of earth strengthening of loosened earth block occurred by tunnel collapse.

  • PDF

Bearing capacity of micropiled-raft system

  • Hwang, Tae-Hyun;Kim, Kang-Hyun;Shin, Jong-Ho
    • Structural Engineering and Mechanics
    • /
    • v.63 no.3
    • /
    • pp.417-428
    • /
    • 2017
  • The micropile has been mainly used under the concept of supplementing structural support or reinforcing soft ground. For the micropiled-raft system which uses a micropile and a raft in combination in particular, it is generally considered as ground reinforcement rather than foundation components considering the bearing capacity of the micropile in many cases. In this study, the bearing capacity mechanism of the micropiled-raft system is investigated through a physical model test and numerical method. The numerical results have shown that not only the slender-pile-effect of the micropile, but also the ground reinforcement effect, increase the bearing capacity considerably. The bearing capacity formula of the micropiled-raft system is derived based on the failure mechanism obtained through model tests. The formula is verified and proposed as a design chart.

Reinforcement of underground cavities by Hi-FA(High performance and Multi functional Agent) (Hi-FA(유동성 및 점성 개질제)를 이용한 지하공동 보강사례)

  • Lim, Hai-Sik;Park, Yeung-Ho;Paik, Kyu-Ho;Lee, Yong-Jun;Park, Su-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.676-686
    • /
    • 2010
  • Damage Cases of variously type are reported that the ground subsidence is caused by the underground cavities at structure and construction works in lime stone or abandoned zone. A underground cavities by direct for zone having an effect on structure have been filled with cement agents. But this measure is urgently needed in materials and work methods, because ground water pollution at water down fillings and flow out, ground disturb at high participle, damage of farms and fishery. The research confirm application of filling method and filling materials of environmentally friendly and economical by Hi-FA new materials have both liquidity and viscosity from case reinforcement in APT site, Gunsan.

  • PDF

Application of resistivity monitoring to examine the grouting effect

  • Farooq, Muhammad;Park, Sam-Gyu;Kim, Jung-Ho;Song, Young-Soo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.79-82
    • /
    • 2006
  • This paper presents to examine the ability of an electrical resistivity method to monitor the grouting effect at subsidence area. To monitor the changes in ground resistivity before and during the grout, series of electrical resistivity monitoring surveys have been conducted. Data has acquired in the form of grid making nine lines parallel to road and four lines traverse the road. Two kinds of electrode arrays modify pole-pole and dipole-dipole arrays were used during resistivity data acquisition. In this paper, the results show that electrical prospecting is an effective method to detect low resistivity imaging zone by grout during the ground reinforcement.

  • PDF

A Study of the Construction Method for Soft Ground Reinforcement of Baekje Dynasty Based on the Low Swamp Remains in the Buyeo Area (백제시대 부여지역 저습지에 조성된 유적에서 나타나는 연약지반 개량공법 연구)

  • Cho, Weon-Chang
    • Journal of architectural history
    • /
    • v.19 no.6
    • /
    • pp.155-171
    • /
    • 2010
  • King Seong carried out the large-scale construction transferring the capital from Wungjin (Gongju) to Sabi (Buyeo) in 538. But because most of the Buyeo area was the low swamp in the time, it needed above all to form a site before transferring the capital. Until recently, in addition to the scientific excavation, the relief excavations for the construction of new building or the formation of road were conducted on many sites in the Buyeo area. As a result, many remains which were formed on the low swamp including the temple site of Neungsan-ri, Dongna Castle, the remains of Ssangbuk-ri (280-5 Bukpo, Hyeonnaedeul) and the remains of Gua-ri were identified. Also in these remains, the various engineering construction methods irrespective of the nature of remains were used for the purpose of the soft ground reinforcement as follows: mattress method of construction, pile designation, stone alignment, filing of decomposed granite soil, culverts and storage tanks. Especially, the mattress method of construction and the pile designation are thought to be the traditional engineering construction method at least in that they are appeared since the Three Han Sates era. And these soft ground construction methods had an effect on the construction of reservoir in Japan at the time. In the future, the construction method for soft ground reinforcement shall be concerned and studied further in the architecture and the civil engineering as well as the archeology.

Design and Construction of Cellular Foundation Mattress as Foundations of Building Structures (건축구조물 기초로서 셀룰러 기초 매트리스의 설계 및 시공)

  • Jeong Young Lee;Jong Gon Ko;Nguyen Ngoc Son;Jae Hak Park;Doo Kie Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.25-37
    • /
    • 2023
  • Cellular Foundation Mattress made of new materials such as high density polyethylene, are not currently use for the foundation of small and medium-sized buildings in Korea. Therefore, they need to be developed and verified based on domestic ground and field conditions. This study presents the basic design and construction method of Cellular Foundation Mattress. Since the foundation reinforcement effect of Cellular Foundation Mattress should be evaluated and verified for soft ground, a performance comparison evaluation was conducted using the Soilbag method, which is commonly used for the foundation of small and medium-sized buildings in Korea. After the mattress reinforcement, the settlement amount decreased by 38.4% compared to the original ground and the bearing capacity increased by 159%, confirming the same ground reinforcement effect and ground stability as the Soilbag method.

A Fundamental Study on the Application of Water Souuble Pouch for Ground Reinforcement (지반보강용 수용성파우치(PVP)의 활용을 위한 기초적 연구)

  • Jung, Dongho;Kim, Kiho;Kim, Joo-Hyun;Han, Jung-Geun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2017
  • There have been a number of water and sewer pipe breakdown reports followed by ground subsidence. Also, the excavating works for construction due to overcrowding of city have been common. Particularly, in urban areas ground becomes unstable because of the lowered lifeline sinkage followed excavation and backfilling. In order to solve the problem, some reinforcement works for ground by rod tamping or grouting have been applied. However, it is hard to predict when the buried utilities in underground will be damaged. Also, there is a limit for the underground exploration and investigation methods. Therefore, in this study, the estimated about the water soluble polymer pouch including poor mixed admixture which is designed to eliminate the dangerous factors. The reinforcement strength of this method was confirmed by verifying three points: meltiness in a certain period, water solubility in the ground water level, and characteristics of the pouch, which can be stored in daily conditions. It is also proved that this method allows to keep the ground from getting weakened in the installation of water and sewer pipe along with back filling materials.