• Title/Summary/Keyword: grab dredging construction

Search Result 2, Processing Time 0.02 seconds

Development of Hydrographic Dredging Surveying and Construction Management System Based on Grab Dredger (그래브 준설선에 의한 해상준설측량 및 시공관리시스템의 개발)

  • Lee, Jin Duk;Lee, Jae Bin;Kim, Hyun Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.21 no.4
    • /
    • pp.3-12
    • /
    • 2013
  • In order to evaluate dredging results scientifically the system which can manage and estimate working process by monitoring dredging process in real-time needs to be constructed. We constructed real-time dredging management system for guidance of a dredging vessel and for survey of dredging construction. This system was designed to have functions of dredger location by GPS, ship direction measurement by GPS/Gyroscope combination, Grab position measurement, dredging depth measurement and correction. In addition, we developed the programs for controlling and operating the constructed system. The system could induce the vessel to accurate position and conduct dredging according to plan and the effectiveness of the system was evaluated through the results of application to actual dredging construction site.

The Movement Characteristics of Suspended Solid(SS) in Harbor Construction(II) - The Landfill Construction and The Grab Dredging Construction (항만공사시 부유토사의 거동 특성에 관한 연구(II) - 매립 및 준설공사시 -)

  • Lee Ji Wang;Maeng Jun Ho;Cho Kwang Woo;Yang Gwon Weol;Kim Young Seup
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.6 no.2
    • /
    • pp.46-53
    • /
    • 2003
  • In order to analyze the movement characteristics of suspended solid(SS) in harbor construction, we investigate the generation and movement processes of the SS for the landfill construction by direct casting method and the grab dredging construction which is the most frequent process in harbor construction. We find that the SS is generated into a very high concentration right after the direct casting of landfill soil and continued up to 60 minutes in the landfill construction using the direct casting method with dredged materials by a ship of 700-tonnage. In the grab dredging construction, the SS is generated in a high density of concentration near at its source regardless of water depth, formed belt and diffused up to 700m along the trajectory of tidal current. Based on the result of the present study, it is recommended for the mitigation of SS generation that the silt protector be deployed near at construction site close enough to block the diffusion of SS and the body length of silt protector be long enough to mitigate the SS diffusion in the bottom layer.

  • PDF