• 제목/요약/키워드: government construction

Search Result 2,127, Processing Time 0.03 seconds

A STUDY OF STRUCTURING OF NEW MANAGEMENT SYSTEM FOR LOCAL GOVERNMENTS IN JAPAN

  • Takashi Goso;Shunji Kusayanagi;Seigo Nasu;Kotomi Uemoto
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.371-376
    • /
    • 2005
  • Administrative works of local governments in Japan always have been led by central government. Local government organizations have gotten used to control of central government, whose organization is divided vertically into divisions. Such organizations as lack of cooperation of each administrative division could not define strategic goal appropriate for their district independently and could not give an efficient and optimized solution to their strategic goal. Under existing management system, it will be difficult for local governments to rapidly adapt to changing society. Under these circumstances, it is necessary for local governments to structure new management system independent on central government's instructions in order to manage appropriately.

  • PDF

Enterprise GIS Implementation Plan at Local Government: from Data Centric to Service Centric Architecture (지방자치단체의 Enterprise GIS 고도화전략: 데이터중심에서 서비스중심 아키텍처로)

  • Kang, Young-Ok
    • Spatial Information Research
    • /
    • v.15 no.3
    • /
    • pp.347-362
    • /
    • 2007
  • GIS has been rapidly developed since 1995 when the Ministry of Construction and Transportation started the First National GIS Construction Project and built large scale topographic map at local governments level. From that time local governments have been built several application system such as road management system, waterworks management system, sewer management system, underground facilities management system, and urban planning information system, etc. However, the construction of GIS application system at different department level brings the problem of data sharing and overlapping database construction. To overcome this environment Enterprise GIS concepts has been introduced. In case of Seoul Metropolitan government Spatial Data Warehouse have been constructed. However, Seoul Metropolitan government still have the problem of inactive use of GIS system and adaption to the rapidly changing information environment. This study aims to present Strategic plan to uggrade Enterprise GIS concenpt from data centric to service centric architecture at local government level.

  • PDF

A Study on the Classification of Standard of Cost Estimation in Construction New Excellent Technology (건설신기술품셈 유형분류에 관한 연구)

  • Ahn, Bnag Ryul;Tae, Yong Ho;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.249-251
    • /
    • 2013
  • The government has applied the Construction New Excellent Technology Endorsement System to enhance national competitiveness and advance domestic construction technology since 1989. Nevertheless, It's application hasn't been expanded to overall construction industry, due to insufficient verification of the cost effectiveness. So, the government has established the standardized cost estimation guideline to verify the cost effectiveness in 2011. This research classified the technology group based on 27 cases of the cost estimation reports to increase understanding of the cost effectiveness of the new excellent technology. It is expected to contribute establishing reasonable and feasible cost estimation standards.

  • PDF

APPLICATION OF CONTRACTORS' RISK PREFERENCE ON THE EVALUATION OF THE PHILIPPINE GOVERNMENT STANDARD CONTRACT

  • Visuth Chovichien;Joel Cesarius V. Reyes
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.144-152
    • /
    • 2009
  • Construction contracts involve the allocation or distribution of the risks inherent to a construction project between or among contracting parties. However, it has been a common practice that only one party drafts the contract due to practical reasons and particular policies of various organizations. Interviews were conducted on some local contractors to gain their meaningful insights and standpoints on the allocation of each risk. These results were compared with the actual risk allocation using the Philippine government standard contract and risk principles from the literature to determine if their considered opinions provide a plausible alternative. A sample application of this evaluation is presented for construction-related risks and risk allocation recommendations are provided in the end.

  • PDF

A Study on the Reformation Proposal of Post-Evaluation Indicator for Performance Measurement in the Public Construction (공공공사 성과측정을 위한 사후평가항목 개선방안에 관한 연구)

  • Lee, Eun-Ji;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.523-526
    • /
    • 2007
  • In Korea, the construction industry has been growing quantitatively because of its aggressive advances into overseas construction market and the Korean government's housing policy. Moreover, visions and goals such as 'construction industry promotion build up plan' have recently been promoted by the government while new strategic growth focused on competitiveness is gaining interests among the industry. However, there are a few problems in the construction performance. First, the specific performance measurement indicator or skills for the construction industry are hardly found in Korea. Currently, the finance or overall management system in the construction business are used as indicators to measure performances in not only the construction industry but all industries including the manufacturing industry. The government, the industry and universities recognized the need for the performance measurement indicator and skill and have developed and actively studied on them.

  • PDF

The Influence of Early Government-sponsored Housing on the Modernization of Korean Housing: From Post-Korean War to Late 1960s

  • Jun, Nam-Il;Yang, Se-Hwa
    • International Journal of Human Ecology
    • /
    • v.13 no.1
    • /
    • pp.147-157
    • /
    • 2012
  • The construction of government-sponsored housing in Korea began in the early 1950s. Beyond fulfilling the housing shortage after the Korean War, it also impacted the development of housing in Korea. The aim of this study is to explore the construction and supply of government-sponsored housing and to discuss the positive and negative influences on the modern housing in Korea. In order to achieve the objectives, the pictures and floor plans, newspaper articles and the KNHC publications, which led the public housing supply from 1950 to 1960, were examined. Results indicate as follows: First, government-sponsored housing industrialized the housing production, which satisfied the volume need. The simplified floor plan and exterior, along with the western characteristics, created a new urban landscape. Second, the distinct characteristics of Korean housing were established. By emphasizing development and financial practicality, large scale housing complexes were built with simplified, characterless, and mechanical exteriors in a disconnected territory with neighbor district. Third, government-sponsored housing became the major accelerator to westernize the Korean housing culture. In conclusion, the principles of functionalism of government-sponsored housing have become the fundamental root of Korean housing since the war.

IMPLEMENTATION OF GOVERNMENT E-PROCUREMENT: A COMPARATIVE STUDY OF THAILAND AND INDONESIAN PRACTICES

  • Budi Hasiholan;Shin-ei TAKANO
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.827-834
    • /
    • 2009
  • In respond to the demand of an open, fair, transparent, and efficient environment for procurement, many governments have incorporated the use of internet in their procurement systems with online procurement (e-procurement). Given the different policies and laws which have to be complied with, the practice of government e-procurement system varies from one country to another. Thus, experiences in running e-procurement will vary as well. The achievements and obstacles of one country's experience will be a constructive reference for other countries in establishing e-procurement system. In this regard, government e-procurement system practices in two Southeast Asia countries i.e., Thailand and Indonesia particularly in public works are consecutively presented and finally compared in this paper. The government of Thailand has applied Online Auctions (e-Auctions) as the national procurement practice since 2005 and performed the e-Auctions in two types: Reverse Auction and Sealed Bid Auction. Contrary to the common practice of e-procurement, the Thai government, with some rationales, runs the bid documents obtaining manually as well as qualification and technical documents submission and holding the e-Auctions at bidding office. Whereas Indonesian government runs Online Sealed Bid Bidding (e-Procurement) and most of the bidding stages are performed electronically except bid evaluation for both technical and financial. The advantages and drawbacks of these two e-procurement practices are discussed as well as improvements that have to be made for successful of e-procurement.

  • PDF

Improvement of Public Construction Delivery System & Award Method in Korea;Comparison with Cases of U.S., U.K., Japan (국내 공공공사 발주 및 낙찰제도 개선방안;미국, 영국, 일본 사례와의 비교를 중심으로)

  • Ji, Sae-Hyun;Lee, Hyun-Soo;Park, Moon-Seo;Song, Sang-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.367-372
    • /
    • 2006
  • Government is not only the biggest owner in public sector, but also the leader responsible for improving and fostering construction industry. Delivery systems and award methods are enacted as laws via government's strong will for construction innovation. In addition to establishing relationships between government and contractor, delivery systems and award methods affect every aspect of industry. Therefore, the government should keep trying to remove inefficiency and achieve Best Value. This paper analyzes the delivery systems and award methods of advanced countries to extract lessons for Korean industry focusing on leading parties, direction, and change in owner's awareness of their respective innovative movements for construction. The prerequisites for improvement in delivery systems and award methods are suggested as partnership between public and private sectors, consistent innovation, enhancement in efficiency, and reinforcement of owner's capability.

  • PDF

Development of Cost Management Process during Design Phase based on Design to Cost (DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발)

  • Park, So-Hyun;Moon, Hyun-Seok;Hyun, Chang-Teak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF

A Study on the Maintenance and Management of Geochanghyanggyo Local Confucian School during the Latter part of Joseon Dynasty (조선후기 거창향교의 유지와 관리)

  • Song, Hye-Young
    • Journal of architectural history
    • /
    • v.30 no.2
    • /
    • pp.45-54
    • /
    • 2021
  • During the latter part of Joseon Dynasty, Local Confucian School(Geochanghyanggyo) had served as a government school and left many official documents on the educational construction. The construction of Local Confucian School(Geochanghyanggyo), which was recorded in official documents, was diverse, and most of them were reconstructed. Construction-works recorded in an official document was drafted in two ways. One was in the same format as the accounting records and the other was written in the diary format by date. The construction cost was mainly financed by selling the land owned. Of course, with the help of the government, they could receive some of the essential timber and expenses for the construction. The management and maintenance of educational construction was entrusted by a manager called 'Chaji(次知)'. Then there were employees called 'Jeonjik(殿直)' and 'Gojik(庫直)' and they were paid for their work.