• Title/Summary/Keyword: gas facility

Search Result 760, Processing Time 0.023 seconds

Modeling and Simulation of O2/CH4 Gas Supply System of Afterburner for Fuel-rich Gas of Gas Generator (가스발생기의 연료과잉가스 후연소용 O2/CH4 가스 공급시스템 설계)

  • Wang, Seungwon;Lee, Kwangjin;Chung, Yonggahp;Han, Yeoungmin
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.18 no.2
    • /
    • pp.86-92
    • /
    • 2014
  • Combustion Chamber Test Facility (CCTF) to be constructed in Naro Space Center for re-burning the fuel-rich gas of gas generator have afterburner system. The afterburner system is supplied the Oxygon ($O_2$) gas and Methane ($CH_4$) gas to reduced the harmful exhaust gas. The detailed design for the planned CCTF afterburner system is simulated and analysed by AMESim program through the all of gas supply system components. Afterburner system is performed to verify the pipe size, orifice diameter, and gas supply conditions according to the total gas consumption from analysis of gas supply system.

A Study on the Odorization Levels and Management in the Facility using Liquified Natural Gas(LNG) (액화천연가스(LNG) 사용시설내의 부취농도 분포 및 관리방법에 관한 연구)

  • Won, Seung Yeon;Shin, Hun Yong
    • Journal of the Korean Institute of Gas
    • /
    • v.23 no.6
    • /
    • pp.25-32
    • /
    • 2019
  • In many mass-consumption gas facilities, natural gas is not supplied through the pipeline of the gas corporation. LNG is supplied from the gas corporation through the tank lorry to be vaporized. In order to prevent human or property damage due to gas leakage at these facilities, a study was conducted to analyze the concentration of odorant injected at the initial and consumption points. An analysis was performed to confirm the change in odorant concentration according to the pipe position in the gas facility when a constant flow rate flowed. For this study the gas samples were taken with aluminium cylinders(4.5 L) which were created a vacuum at the pressure regulator in which the odorants was injected and the points using the gas. Odorant levels of the samples were analyzed by Gas chromatography(Main Body : Agilent 7890A, Detector : ANTEC 7090).We suggest that the small facilities using LNG need to make the management system by the types of facilities for maintaining the odorization system.

Thermodynamic Analysis on Organic Rankine Cycle Using Exhaust Gas of the Chimney in a Resource Recovery Facility (폐기물 소각시설 굴뚝의 배기가스를 이용한 유기랭킨사이클 시스템의 열역학적 해석)

  • Kim, Sunhee;Sung, Taehong;Kim, Kyung Chun
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.5
    • /
    • pp.27-35
    • /
    • 2017
  • The amount and quality of waste heat from a resource recovery facility were measured. The temperature of exhaust gas was $176.6^{\circ}C$ and the amount of that was 13.8 kg/s. This research designed a waste heat recovery system whose working fluid is R-245fa. It simulated three study cases as follows. In simulation of a basic ORC system, the turbine power output and thermal efficiency were respectively 96.56 kW, 14.3%. In simulation of a superheater connection, 0.09% of efficiency could be improved due to the increase of enthalpy by overheating of working fluid, but the obtained output was decreased with 16.58kW because of the decrease of working fluid mass. In simulation of a process heater connection, efficiency was increased up to 38.51%.

Analysis of Internal Flow and Control Speed for NH3 (Ammonia) Leakage Scenario of ALD Facility (ALD 설비의 NH3(Ammonia)누출 시나리오에 대한 내부유동 및 제어 속도 해석)

  • Lee, Seoung-Sam;An, Hyeong-hwan
    • Journal of the Korean Institute of Gas
    • /
    • v.26 no.5
    • /
    • pp.22-27
    • /
    • 2022
  • Atomic Layer Deposition (ALD) is a facility that deposits an atomic layer on a wafer by causing a chemical reaction after decomposition using heat or plasma by inputting two or more gases during the semiconductor process. The main gas used at this time is NH3 (Ammonia). NH3 has a relatively narrow explosive range with an upper limit (UFL) of 33.6% and a lower limit (LEL) of 15%, but it can explode if a large amount suddenly gathers in one place. It is Velocity and fatal if inhaled or in contact with the skin. NH3 (Ammonia) of ALD (Atomic Layer Deposition) facility is supplied to the chamber through the gas inlet and discharged after the reaction.

The First Operation of Coal Combustion Test Facility in HANJUNG (HANJUNG 석탄 실험연소로의 초기운전)

  • Jang, G.H.;Chang, I.G.;Jeong, S.Y.;Chon, M.H.;Kim, J.S.
    • 한국연소학회:학술대회논문집
    • /
    • 1998.10a
    • /
    • pp.79-84
    • /
    • 1998
  • In this paper we show design and operation of 1MWth pulverized coal combustion test facility. The test facility is consists of coal feeding system, furnace and flue gas treatment system. The furnace is equipped with a top-fired burner in order to avoid influence of gravity on the coal particles. There are two part of vertical(VP) and horizontal pass(HP) at furnace. We can measure temperature and species of coal flames in vertical pass. Also, there is horizontally arranged section where investigation regarding corrosion and deposit formation will be carried out. The burner of combustor was externally air staging burner(EASB) type made by IFRF. The pulverized high bituminous(Blair athol) coal from Australia was used as fuel, and the particle size less than 80 ${\mu}m$ was 83.4%. Overall excess air ratio was 1.2.

  • PDF

Simulation of the Migration of 3H and 14C Radionuclides on the 2nd Phase Facility at the Wolsong LILW Disposal Center

  • Ha, Jaechul;Son, Yuhwa;Cho, Chunhyung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.18 no.4
    • /
    • pp.439-455
    • /
    • 2020
  • Numerical model was developed that simulates radionuclide (3H and 14C) transport modeling at the 2nd phase facility at the Wolsong LILW Disposal Center. Four scenarios were simulated with different assumptions about the integrity of the components of the barrier system. For the design case, the multi-barrier system was shown to be effective in diverting infiltration water around the vaults containing radioactive waste. Nevertheless, the volatile radionuclide 14C migrates outside the containment system and through the unsaturated zone, driven by gas diffusion. 3H is largely contained within the vaults where it decays, with small amounts being flushed out in the liquid state. Various scenarios were examined in which the integrity of the cover barrier system or that of the concrete were compromised. In the absence of any engineered barriers, 3H is washed out to the water table within the first 20 years. The release of 14C by gas diffusion is suppressed if percolation fluxes through the facility are high after a cover failure. However, the high fluxes lead to advective transport of 14C dissolved in the liquid state. The concrete container is an effective barrier, with approximately the same effectiveness as the cover.

Study on Temperature Characteristic of Pressurization System Using Helium Gas (헬륨 가압시스템에 대한 온도특성 연구(II))

  • Chung Yonggahp;Cho Namkyung;Kil Kyoungsub;Kim Youngmog
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • v.y2005m4
    • /
    • pp.168-175
    • /
    • 2005
  • The pressurization system in a liquid rocket propulsion system provides a controlled gas pressure in the ullage space of the vehicle propellant tanks. It is advantage to employ a hot gas heat exchanger in the pressurization system to increase the specific volume of the pressurant and thereby reduce over-all system weight. A significant improvement in pressurization-system performance can be achieved, particularly in a cryogenic system, where the gas supply is stored inside the cryogenic propellant tank. The temperature characteristic of cryogenic pressurant is very important to develop some components in pressurization system. Numerical modeling and Test data were studied using SINDA/FLUINT Program and PTF(Propellant-feeding Test Facility).

  • PDF

Collection Efficiency of a Mist Eliminator for Wet Flue Gas Desulfurization (습식 배연탈황설비용 습분제거기 포집효율 평가)

  • Kim, Moon-Won;Yook, Se-Jin;Yu, Tae U
    • Particle and aerosol research
    • /
    • v.14 no.3
    • /
    • pp.73-80
    • /
    • 2018
  • Recently, there has been much research on the effect of ultrafine dust on human body with increasing interest in the ultrafine dust. In the Republic of Korea, there are many old thermal power plants, and the amount of ultrafine dust emitted from the thermal power plants is reported to be about 14% of the total amount of domestic fine dust. Therefore, the amount of fine dust from the flue gas desulfurization facility in the thermal power plant needs be reduced. In this study, we made an experimental setup to simulate a flue gas desulfurization facility and analyzed the physical characteristics of the particles passing through a mist eliminator. Experiments were carried out to investigate the collection efficiency of the mist eliminator by using the Arizona Test Dust in a dry environment, and then spraying limestone slurry into the flue gas desulfurization system equipped with the mist eliminator to examine the size and morphology of limestone particles upstream and downstream of the mist eliminator. Cut-off size of the mist eliminator was formed at about $6{\mu}m$. The result of this study is expected to be helpful for designing an electrostatic precipitator for removing particles passing through the mist eliminator.

A Comparison on Detected Concentrations of LPG Leakage Distribution through Actual Gas Release, CFD (FLACS) and Calculation of Hazardous Areas (가스 누출 실험, CFD 및 거리산출 비교를 통한 LP가스 누출 검지농도 분포에 대한 고찰)

  • Kim, Jeong Hwan;Lee, Min-Kyeong
    • Applied Chemistry for Engineering
    • /
    • v.32 no.1
    • /
    • pp.102-109
    • /
    • 2021
  • Recently, an interest in risk calculation methods has been increasing in Korea due to the establishment of classification code for explosive hazardous area on gas facility (KGS CODE GC101), which is based on the international standard of classification of areas - explosive gas atmospheres (IEC 60079-10-1). However, experiments to check for leaks of combustible or toxic gases are very difficult. These experiments can lead to fire, explosion, and toxic poisoning. Therefore, even if someone tries to provide a laboratory for this experiment, it is difficult to install a gas leakage equipment. In this study we find out differences among actual experiments, CFD by using FLACS and calculation based on classification code for explosive hazardous area on gas facility (KGS CODE GC101) by comparing to each other. We develpoed KGS HAC (hazardous area classification) program which based on KGS GC101 for convenience and popularization. As a result, actual gas leak, CFD and KGS HAC are showing slightly different results. The results of dispersion of 1.8 to 2.7 m were shown in the actual experiment, and the CFD and KGS HAC showed a linear increase of about 0.4 to 1 m depending on the increase in a flow rate. In the actual experiment, the application of 3/8" tubes and orifice to take into account the momentum drop resulted in an increase in the hazardous distance of about 1.95 m. Comparing three methods was able to identify similarities between real and CFD, and also similarities and limitations of CFD and KGS HAC. We hope these results will provide a good basis for future experiments and risk calculations.

Methods to Reduce Greenhouse Gas for University Buildings to Make a Low-Carbon Green Campus - With Case Study on the 'E' University -

  • Song, Su Min;Peom, Sung Woo;Park, Hyo Soon;Song, Kyoo Dong
    • KIEAE Journal
    • /
    • v.14 no.2
    • /
    • pp.37-46
    • /
    • 2014
  • University buildings are energy-guzzling facility that consume more than 10,000TOE within a campus annually. Even the consumption is on an upswing trend. Behind such high consumption are there cheap power rates for education facility, lack of high-efficiency equipment and ever-increasing use of various information equipment. Being keenly aware that greenhouse gas emission increases due to such rise of energy consumption, the present study carried out a case study. In the case study, the study chose the buildings of E university from top 10 universities that consume energy most in Seoul and examined the current status of their energy consumption and greenhouse gas emission. And then it set the reduction target of greenhouse gas by year. Putting aside a middle and long-termed strategy for later endeavor, it first established the 1st year's implementation plan (2014) for energy saving and greenhouse gas reduction with limited budget and according to greenhouse gas reduction target. The plan is specified as follows. Targets for energy saving are mainly divided into two sectors: machine equipment and electric equipment. 7 ideas were proposed. Three ideas to improve machine equipment are to replace with high-efficiency boilers and chillers and to adjust the position of the cooling tower. By doing so, it was estimated that energy could be saved by 176.34TOE in total and greenhouse gas could be reduced by 370.771t$CO_2$-eq. Four ideas to improve electric equipment include the replacement with LED lights, LED emergency lights and high-efficiency motors and the installation of motion sensors. It was calculated that such replacement could conserve 1,076.08TOE (electric energy) and reduce 2,181.420t$CO_2$-eq (greenhouse gas).