• Title/Summary/Keyword: four operation

Search Result 2,254, Processing Time 0.029 seconds

A five-axis CAM system for free-surface grinding (금형연마작업을 위한 5축 CAM 시스템)

  • 서석환;이민석;김두형
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.1024-1030
    • /
    • 1993
  • In manufacturing press die with free surface, grinding operation is an important post process for surface finish and dimensional accuracy. With the advancement of NC technology. surface grinding operation is increasingly replaced by the gantry type manipulator. As the mechanics for grinding operation is different from machining operation, conventional CAM system for machining operation is hard to apply. In this. paper, we develop a five-axis CAM system by which an efficient gantry trajectory can be planned and verified. The developed system consists of four conceptual modules; namely CAD, PROCESS. CAM, and ANALYSIS. In the CAD module, the machined surface is represented by CL-data or surface modeler, and process parameters are specified by the PROCESS module. Then, the CAM module generates a series of grinding paths based on the grinding mechanics together with process databases for tool spaces and grinding conditions. The generated paths are verified via ANALYSIS module. Validation via real experiments is left for further study.

  • PDF

Surgical Results of Brock Operation with a Mosquito Clamp in Neonates (Mosquito 겸자를 이용한 Brock 술식의 단기 성적 -중증 폐동맥유출로차단을 동반한 신생아 4예-)

  • 안홍남
    • Journal of Chest Surgery
    • /
    • v.22 no.5
    • /
    • pp.766-774
    • /
    • 1989
  • Four neonates with critical pulmonary outflow obstruction underwent emergency palliative operation between February 1988 and May 1989 at the department of Thoracic and Cardiovascular Surgery, Kyungpook National University Hospital. There were three boys and one girl, the mean age was 12.25 days [ranging from 3 days to 26 days], and the mean body weight was 3,625 gm [ranging from 3,450 gm to 4,200 gm]. Two patients had severe pulmonic valvular stenosis with intact ventricular septum, a third had pulmonary atresia with intact ventricular septum, and another had pulmonary atresia with ventricular septal defect. All were cyanotic, showed arterial desaturation with metabolic acidosis, and had congestive heart failure. To relieve the pulmonary outflow tract obstruction, we performed transventricular pulmonary valvulotomy [Brock operation] with a mosquito clamp in all cases without extracorporeal circulation. Three patients survived the operation and showed satisfactory postoperative results. The patient who had pulmonary atresia with ventricular septal defect expired 5 days after surgery. We consider transventricular pulmonary valvulotomy [Brock operation] with a mosquito clamp as one of the preferable procedures for critical pulmonary outflow obstruction in the neonatal period.

  • PDF

The Operation Characteristics and Cost Analysis of an Ice Thermal Storage System (빙축열 냉방시스템의 운전특성 및 비용 분석)

  • Ahn Young Hwan;Kang Byung Ha;Kim Suk Hyun;Lee Dae Young
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.17 no.2
    • /
    • pp.156-164
    • /
    • 2005
  • A comparative analysis of an ice storage system has been performed on the operation cost for the four control strategies, i.e., chiller priority and chiller downstream, chiller priority and chiller upstream, storage priority and chiller upstream, storage priority and chiller downstream. Main components of the ice storage system are an ice-on-coil storage tank and a screw compressor chiller. With the simulation program, the operation cost has been evaluated from the economics of an ice storage system. It is found that the operation cost of the ice storage system is strongly dependent on the control strategy, i.e., chiller priority or storage priority, but less affected by the arrangement method, i.e., chiller upstream or chiller downstream. In case of the maximum load day, the control strategy with chiller priority and chiller upstream is supposed to obtain the reduction of operation cost. However, it is found that the control strategy with storage priority and chiller downstream is the best economical operation for most summer seasons except the maximum load day.

Reoperation for congenital heart disease (선천성 심장기형에 대한 2차수술로서의 개심술)

  • Ahn, H.;Sung, S.W.;Kim, Y.J.;Roh, J.R.;Suh, K.P.
    • Journal of Chest Surgery
    • /
    • v.19 no.2
    • /
    • pp.280-287
    • /
    • 1986
  • Between March 1978 and August 1985, 29 cases at various congenital heart diseases were reoperated because of remnant shunt of residual anomalies at Seoul National University Hospital. They were consisted of 10 cases of Tetralogy, 4 simple VSD, 6 complicated VSD. 3 partial ECD, and 5 other rare congenital anomalies. The interval between the initial and the second procedure ranged from 1 day to 122 months [mean; 26.9 months]. In 4 cases of them, the second procedure was done during initial hospitalization within 3 weeks post-operatively. The primary operation intended to be corrective surgery except four whose primary operation was palliative or exploratory one even though it was done with extracorporeal circulation. The indication for second operation was mainly residual shunt or valvular obstruction due to patch detachment or inadequate relief of stenotic lesion. Others were paravalvular leak, valvuloplasty failure, prosthetic valve failure, and inadequate primary diagnosis. Four patients were dead [14.3%]; three complicated VSD`s and one Tetralogy. There were 7 cases of nonfatal complication with subsequent improvement except one [diffuse cerebral dysfunction].

  • PDF

Reduction of the Reheater Spray for Coal Fired Thermal Power Plant (석탄화력발전소의 재열저감수 저감방안)

  • Kim, Hyung-Deok;Koh, Churl-Kyun;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.9 no.2
    • /
    • pp.46-50
    • /
    • 2013
  • When four operation parameters are adjusted, the temperature of reheater steam is around the designed operator temperature and the decrease of reheater spray flow rate is achieved. As a result, the decrease of thermal efficiency also can be prevented. To keep the reheater exit temperature on the designed value and decrease the use of reheater spray flow rate, the control of four operation parameters is considered and applied in the operation of a thermal power plant.

  • PDF

Development of a Theoretical Model for Predicting Contaminant Concentrations in a Multi-zone Work Environment (다구획 작업환경에서의 오염농도 예측을 위한 이론적 모델의 개발)

  • Cho, Seok-Ho
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.21 no.4
    • /
    • pp.185-192
    • /
    • 2011
  • To predict contaminant concentrations within a multi-zone work environment, an air quality model in the work environment was developed. To do this, airflow equations on the basis of orifice equation were solved by using the Conte and De Boor scheme, and then equations for the conservation of mass on contaminant were solved by using the fourth-order Runge-Kutta algorithm. To validate the accuracy of simulated results, this model was applied to the controlled environment chamber that had been tested in 1998 by Chung KC. The comparison of predicted concentrations by this study with measured concentrations by the Chung KC indicated that the average deviations were 2.66, 3.35, and 3.15% for zone 1, zone 2, and zone 3, respectively. Also, this model was applied to a working plant with four zones. Thus, the results of contaminant concentration versus time were predicted according to the schedule of the openings operation, and case studies were done for four cases of the openings operation to investigate the interaction of airflow and contaminant concentration. The results indicated that opening operation schedules had a significant effect on contaminant removal efficiency. Therefore, this model might be able to apply for the design of ventilation schedules to control contaminants optimally.

A Research on the core PMO function and operation type for the IT project of financial industry in Korea (금융권 핵심 PMO 기능과 운영형태에 관한 연구)

  • Lee, Jae-Beom;Lee, Jae-Chul;Chang, Yun-Hi
    • Journal of Digital Convergence
    • /
    • v.7 no.3
    • /
    • pp.35-47
    • /
    • 2009
  • The IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques, TQM to decrease project failure, and to increase IS performance. But, in spite of such various efforts, the latest Standish Group's research indicates that the project scale is bulkier than $1{\sim}2$ year ago and IS development project's batting average falls from 34% to 28% at the same time, proceeded project is increased, and project discharged arrives to $15%{\sim}18%$. According to a research, success possibility increased by 37% after a year of PMO introduction, and increased sharply by 62% after 2 years and by 65% after S years. This research has a goal to survey how the PMO function and operation type affect the IS project performance in the financial industry. I determine nine independent variables and three dependent variables from previous researches. The results of this study are that the four core functions of PMO have relationship with project performance. But, technical support function does not relate with organization performance. Among the four core PMO operation types, three types have an effect on the IS project performance except the perfectionist type.

  • PDF

Treatment of periodontal lesion caused by palatogingival groove in maxillary lateral incisor: case reports (상악 측절치에서 발견되는 구개치은구로 인한 치주 병소의 치료 : 증례 보고)

  • Kim, Sun-Ha;Park, Jin-Woo;Suh, Jo-Young;Lee, Jae-Mok
    • Journal of Periodontal and Implant Science
    • /
    • v.39 no.4
    • /
    • pp.425-429
    • /
    • 2009
  • Purpose: The palatogingival groove is a developmental anomaly of the incisor teeth, which often presents severe localized periodontal disease. The purpose of this study was to evaluate the clinical outcome of palatogingival groove-associated periodontal lesion following flap operation with glass ionomer filling. Methods: Four patients with periodontal lesion associated with the palatogingival groove were chosen for this case study. Clinical indices were taken and radiographic exam was performed at the baseline of the study and four patients were treated by flap operation with GI filling. Post-surgical visits were scheduled at regular intervals to check clinical and radiographic changes. Results: Symptoms and signs of periodontal lesion were almost completely resolved with improvement of periodontal indices. Conclusions: Flap operation with direct glass ionomer restoration is thought to be an acceptable method which can produce favorable results in the treatment of periodontal lesion caused by palatogingival groove on the maxillary lateral incisor.

Efficient Utilization of Water Resources Linking The Estuary Reservoirs in Asan-Dae Ho Area of Korea (아산호(牙山湖)에서 대호호(大湖湖) 연안(沿岸)의 담수호(淡水湖) 연결(連結)에 의한 효율적(效率的)인 수자원(水資源) 이용방안(利用方案))

  • Choi, Han-Kyu;Koo, Bon-Soo;Lee, Seong-Hong
    • Journal of Industrial Technology
    • /
    • v.18
    • /
    • pp.425-430
    • /
    • 1998
  • The Asan Bay area Korea is situated in an unbalance or water supply and demand relating to the Ansung, Sapkyo, Dangjin and Youmwha rivers and their estuary reservoirs. The multi-reservoir operation was studied by the Hierarchical Operation Model for Multi-reservoir System(HOMMS) assuming that these four estuary reservoirs were linked to each other in order. The result of this study shows that storage capacity deficiency in 2011 was estimated as 8 MCM in the Sapkyo and 31 MCMin Dae Ho estuary reservoir, respectively. In case of linking four reservoirs, the water deficiency will not occurs in all the reservoirs even if additional agricultural water of 78 MCM/yr was supplied. Total additional water demand for agricultural, municipal and industrial uses was estimated as 321.9 MCM/yr while additional supply by linking the reservoirs was estimated as 160.4 MCM/yr. 50% of additional demand. The remaining 161.5MCM/yr would be supplied transferring other watershed.

  • PDF

Cold electronics based 128 temperature sensor interface with 14 leads for testing of high Tc superconducting cable

  • Gour, Abhay Singh;Thadela, S.;Rao, V.V.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.20 no.1
    • /
    • pp.11-14
    • /
    • 2018
  • High Temperature Superconducting (HTS) power cables are capable of transmitting bulk power without any loss compared to conventional copper cables. The major challenge in the design of such HTS cables is the high stresses (electro-thermal/electro-mechanical) developed at high voltages, high currents and cryogenic temperatures. The safe and reliable operation of HTS cables involves lots of instrumentation for monitoring, measurement, control and safe operation. In principle, a four probe method for resistance (RTD PT-100) is used for temperature measurements at various locations of HTS cable. The number of connecting leads required for this is four times that of the number of sensors. The present paper discusses a novel way of connecting 128 RTD sensors with the help of only 14 leads using a cold electronics based multiplexer board. LabVIEW 11.0 software was used for interfacing and displaying the readings of all the sensors on computer screen.