A Structural Response Estimation and Response Amplitude Operator of Floating Type Salvage Crane (부유식 인양크레인의 운동응답특성과 구조응답 평가)

  • Oh, Young-Cheol;Gim, Ok-Sok;Lee, Gyoung-Woo;Ko, Jae-Yong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2013.06a
    • /
    • pp.132-133
    • /
    • 2013
  • Ship salvage crane is to salvage the equipment safely, this type of crane in the shipyard's large ships or port is being used a lot of container etc. Such a salvage crane was installed on the land and it is built to use the harbour facilities. In this paper, the response amplitude operator and the wave exiting force of floating type salvage crane is calculated and it is performed to structural response estimation.

  • PDF

Prediction on Mooring Tension & Motion Response Characteristics of a Floating Dock in Regular Waves (규칙파 중 플로팅 도크의 운동응답특성 및 계류장력 추정)

  • Oh, Young-Cheol;Gim, Ok-Sok;Ko, Jae-Yong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.19 no.2
    • /
    • pp.200-206
    • /
    • 2013
  • The paper was investigated on the mooring forces(or tension) and motion response characteristics for a 8-point mooring floating dock in regular waves using a commercial code(AQWA). To achieve the aim of the research, a numerical simulation was adapted on an inner port environment condition, which the water depth is 10 meters, significant wave amplitude(1.05 m). wave period(3.85 sec), wind speed(20.21 m/s), wind and current direction ($90^{\circ}$), incident waves(${\chi}=180^{\circ}$, $135^{\circ}$ and $90^{\circ}$). The dimension of the numerical model is length(140 m), breadth(32 m), depth(14.6 m). The maximum length of a mooring line is 120m. We can expected that roll and pitch motions appeared in beam seas better than head sea. the mooring forces also indicated higher in bean seas than in head seas including wind forces.

A Study on the Structural Reinforcement of the Modified Caisson Floating Dock (개조된 케이슨 플로팅 도크의 구조 보강에 대한 연구)

  • Kim, Hong-Jo;Seo, Kwang-Cheol;Park, Joo-Shin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.1
    • /
    • pp.172-178
    • /
    • 2021
  • In the ship repair market, interest in maintenance and repair is steadily increasing due to the reinforcement of prevention of environmental pollution caused by ships and the reinforcement of safety standards for ship structures. By reflecting this effect, the number of requests for repairs by foreign shipping companies increases to repair shipbuilders in the Southwest Sea. However, because most of the repair shipbuilders in the southwestern area are small and medium-sized companies, it is difficult to lead to the integrated synergy effect of the repair shipbuilding companies. Moreover, the infrastructure is not integrated; hence, using the infrastructure jointly is a challenge, which acts as an obstacle to the activation of the repair shipbuilding industry. Floating docks are indispensable to operating the repair shipbuilding business; in addition, most of them are operated through renovation/repair after importing aging caisson docks from overseas. However, their service life is more than 30 years; additionally, there is no structure inspection standard. Therefore, it is vulnerable to the safety field. In this study, the finite element analysis program of ANSYS was used to evaluate the structural safety of the modified caisson dock and obtain additional structural reinforcement schemes to solve the derived problems. For the floating docks, there are classification regulations; however, concerning structural strength, the regulations are insufficient, and the applicability is inferior. These insufficient evaluation areas were supplemented through a detailed structural FE-analysis. The reinforcement plan was decided by reinforcing the pontoon deck and reinforcement of the side tank, considering the characteristics of the repair shipyard condition. The final plan was selected to reinforce the side wing tank through the structural analysis of the decision; in addition, the actual structure was fabricated to reflect the reinforcement plan. Our results can be used as reference data for improving the structural strength of similar facilities; we believe that the optimal solution can be found quickly if this method is used during renovation/repair.

Dynamic Stability during Transportation of Bridge Caisson (교량 케이슨 운송의 동적 안정성 고찰)

  • Jo, Chul-Hee;Kim, Sung-Jun;Cheong, Hyun
    • Journal of Ocean Engineering and Technology
    • /
    • v.23 no.1
    • /
    • pp.104-108
    • /
    • 2009
  • As the demands of ocean resource development increase, many offshore structures are required. To cope with the active ocean developments, many types of construction methods have been applied for offshore facilities, including oil, gas and harbors. One of the challenges is to transport and install the heave bridge caisson. Several construction methods are well understood. However, for the sake of safety and reliability, the F/D installation method can be utilized. While the caisson is carried by an F/D, the mooring force of the tug boat and the structure stability from exiting motions in the dock should be checked against external loadings and sea conditions. The external loads can be classified with wind force, current force, and wave force. In the stability analysis, transportation velocity and draft of F/D are important factors. The dynamic stability and hook load for crane barge installation for the same caisson are also studied. Considering external loads and dominant factors, the stability of caisson during transportation has been investigated.

Development of float off Operation Design for Mdlti Semi-submersible Barges with Symmetrical Stability Casings (반 잠수식 복수부선의 진수설계)

  • 양영태;최문길;이춘보;박병남;성석부
    • Journal of Ocean Engineering and Technology
    • /
    • v.17 no.2
    • /
    • pp.72-76
    • /
    • 2003
  • This paper presents the design concept and operation results of float-off for FSO (340,000 DWT Class, ELF AMENAM KPONO Project) built on the ground, without dry dock facilities. It was the first attempt to build FSO, completely, on the ground and launch it using DBU (Double Barge Unit, which was connected by rigid frame structure.) The major characteristics of FSO, which are similar to general VLCC type hull, including topside structure, weigh 51,000 metric ton. In order to have sufficient stability during the deck immersion of DBU, while passing through a minimum water plane area zone, proper trim control was completed with LMC (Load Master Computer). The major features of the monitoring system include calculation for transverse bending moment, shear force, local strength check of each connector, based on component stress, and deformation check during the load-out and float-off. Another major concern during the operation was to avoid damages at the bottom and sides of FSO, due to motion & movement after free-floating; therefore, adequate clearances between DBU and FSO were to be provided, and guide posts were installed to prevent side damage of the DBU casings. This paper also presents various measures that indecate the connector bending moment, damage stability analysis, and mooring of DBU during float off.

A Study on Structural Safety Assessment for Docking Condition (선박의 docking 시 반력 계산 및 구조 안전성 평가법에 관한 연구)

  • Suh, Young-Suk;Hur, Ki-Sun;Chung, Sung-Wook;Park, Seung-Mun;Cho, Hyun-Kyoo;Chun, Min-Sung
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2006.09a
    • /
    • pp.89-96
    • /
    • 2006
  • The objective of this paper is to find out a reasonable method for docking analysis of ships. The characteristics of reaction force distribution under docking condition are investigated by carrying out parametric study. To assess the allowable reaction force on keel block from structural strength point of view, two kinds of structural assessment methods are proposed in accordance with expected collapse pattern. In order to verify the proposed method, linear buckling and elasto-plastic large deflection analyses of typical double bottom structure are carried out and the results are compared.

  • PDF

Case Study on the Bogie Arrangement of the Load-out System for On-ground Shipbuilding (선박 육상건조를 위한 로드-아웃 시스템의 보기 배치 사례 연구)

  • Hwang, John-Kyu;Ko, Jae-Yong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.1
    • /
    • pp.153-160
    • /
    • 2022
  • This study presents the bogie arrangement of the load-out system for on-ground shipbuilding. The load-out system is one of the most important systems to perform the bogie arrangement of the on-ground shipbuilding technique without dry dock facilities, and this system is composed of four pieces of equipment: bogies, driving bogie with motors, trestles, and power packs. Also, the bogie arrangement analysis (BAA) is employed to simply calculate the reaction forces at the trestle for structural safety. In this context, the purpose of this study is to propose an optimal design method to perform the bogie arrangement satisfying structural safety requirements with minimal cost. It is expected that the proposed methodology will contribute to the effective practice as well as to the improvement of competitive capability for shipbuilding companies at the on-ground shipbuilding stage. Furthermore, we describe some problems and their solutions of the deformation that may occur in the bottom of the hull during the load-out process. As a result, it is shown that we applied it to the 114K crude oil tanker (Minimum bogie 54EA) and the 174K CBM LNG carrier (Minimum bogie 88EA), it can minimize the number of bogie and critical risks (Safety rate 1.61) during the load-out of on-ground shipbuilding. Through this study, the reader will be able to learn successful load-out operation and economic shipbuilding in the future.