• Title/Summary/Keyword: firefighting design construction

Search Result 3, Processing Time 0.017 seconds

The Effect of the Performance of Firefighting Construction Supervision Personnel on the Completion Inspection of Firefighting Facility Construction in Apartments (소방공사감리원의 업무수행능력이 아파트 소방시설공사의 완공검사에 미치는 영향)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.43-54
    • /
    • 2019
  • In this study, results of completion inspection are investigated according to the performance of the firefighting construction supervision personnel and according to the necessity of clean air supply in a performance test of the firefighting construction supervision personnel. The results of the completion inspection are measured and the causes of defects in the fire protection facilities after issuance of a completion inspection certificate are analyzed. The findings of this investigation can be used to minimize the risk of apartment fires and improve the performance of firefighting construction supervision personnel. The results of this study are summarized as follows. First, the results of the completion inspection conducted by the firefighting construction supervision personnel varies according to particular occupation. The performance of fire facility supervisors from design companies and fire construction companies were significantly higher than the fire officers. Therefore, it is necessary to employ supervisors who have experience in supervising the construction of apartments, in order to improve the performance of fire construction supervision officers. Second, the analysis of the completion inspection results according to the necessity of a clean air supply for performance tests of firefighting construction supervision personnel showed that the necessity of a clean air supply was significantly higher for fire facility supervisors from design companies and fire construction companies than for the fire officers. In order to improve, the completion inspection should be carried out up until the completion date of the building. In addition, a system needs to be established to ensure that clients are not able to demand that a completion inspection certificate be issued on the construction completion date. Finally, it is found that defects of completion inspection after issuance of a completion inspection certificate affects the result of the completion inspection. The results of the completion inspections conducted by the fire facility supervisors from design companies and fire construction companies were affected significantly less by defects than that of the general contractors. Research shows that faults have occured in firefighting facilities after the issuance of a completion inspection certificate due to the client and the construction company demanding the issuance of the completion inspection certificate.

Classification of Fire Causes in Warehouses Using the TRIZ Technique and Analysis of Preventive Measures Accordingto 4M (TRIZ기법에 의한 물류창고의 화재원인 및 4M에 따른 예방대책 분석)

  • Han, Sang-Hun;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.3
    • /
    • pp.401-412
    • /
    • 2020
  • This study analyzed the causes of warehouse fires using a creative problem-solving technique called TRIZ. It identified preventive measures by applying 4M. The results are as follows. First, this study examined the inconsistency among the causes of warehouse fires using TRIZ. Second, it analyzed human factors and fire prevention measures in warehouses such as safety standards for managers, and methods for the promotion of safety consciousness among workers, and for the reinforcement of construction technology for sandwich panel workers. Third, it identified the mechanical and facility factors and fire prevention measures in warehouses such as safety facilities, the expanded installation of safety devices, the adoption and development of fire suppression equipment, and the deployment of methods to improve the fire resistance of sandwich panels. Fourth, it presented working and environmental factors and fire prevention measures in warehouses such as the tightening of safety precautions and the supervision of working methods, and setting fire partitions both in loading places and based on performance-based design. Finally, it proposed managerial factors and fire prevention measures in warehouses such as specific targeting for firefighting with low fire hazards, reviewing the material quality regulations of non-combustible or higher for sandwich panels in the specific target of firefighting that cannot apply fire safety standards, installing sprinklers in cold storage, and mandating the installation of automated facilities with retroactive application regardless of the floor area in the warehouse with a sandwich panel structure.

TRS Network Design and Inspection by Shared Network in Subway (지하철에서의 공용망을 이용한 TRS 망 설계 및 검증에 관한 연구)

  • Kim, hak-yeoul;Kim, Seong-Cheol
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.14 no.3
    • /
    • pp.231-238
    • /
    • 2021
  • In addition to individual calls and group calls, the Trunked Radio System (TRS), which belongs to a group, can make calls simultaneously, and many users can use it within a limited time by adjusting the call time. Also, the LCX infrastructure network of the subway Most of the FM, firefighting radio, TRS of the National Police Agency and the terrestrial DMB service built in 2005 are commonly connected to the network for service and operation. In connection with the analysis, call reception sensitivity, handoff, interference with other signals, time delay, etc. were analyzed, and tests such as reception field strength for each output of the repeater and the success rate of the call terminal were conducted and the test results were analyzed. In addition, it will help TRS cell design and network construction by predicting equipment output capacity and service coverage based on test results.