• Title/Summary/Keyword: file distribution

Search Result 183, Processing Time 0.021 seconds

Stress distribution following face mask application using different finite element models according to Hounsfield unit values in CT images (CT상의 HU 수치에 따른 상악골 전방견인 효과의 유한요소 분석)

  • Chung, Dong-Hwa
    • The korean journal of orthodontics
    • /
    • v.36 no.6
    • /
    • pp.412-421
    • /
    • 2006
  • Objective: The result of finite element analysis depends on material properties, structural expression, density of element, and boundar or loading conditions. To represent proper elastic behavior, a finite element model was made using Hounsfield unit (HU) values in CT images. Methods: A 13 year 6 month old male was used as the subject. A 3 dimensional visualizing program, Mimics, was used to build a 3D object from the DICOM file which was acquired from the CT images. Model 1 was established by giving 24 material properties according to HU. Model 2 was constructed by the conventional method which provides 2 material properties. Protraction force of 500g was applied at a 45 degree downward angle from Frankfort horizontal (FH) plane. Results: Model 1 showed a more flexible response on the first premolar region which had more forward and downward movement of the maxillary anterior segment. Maxilla was bent on the sagittal plane and frontal plane. Model 2 revealed less movement in all directions. It moved downward on the anterior part and upward on the posterior part, which is clockwise rotation of the maxilla. Conclusion: These results signify that different outcomes of finite element analysis can occur according to the given material properties and it is recommended to use HU values for more accurate results.

Evaluation of the Usefulness of MapPHAN for the Verification of Volumetric Modulated Arc Therapy Planning (용적세기조절회전치료 치료계획 확인에 사용되는 MapPHAN의 유용성 평가)

  • Woo, Heon;Park, Jang Pil;Min, Jae Soon;Lee, Jae Hee;Yoo, Suk Hyun
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.25 no.2
    • /
    • pp.115-121
    • /
    • 2013
  • Purpose: Latest linear accelerator and the introduction of new measurement equipment to the agency that the introduction of this equipment in the future, by analyzing the process of confirming the usefulness of the preparation process for applying it in the clinical causes some problems, should be helpful. Materials and Methods: All measurements TrueBEAM STX (Varian, USA) was used, and a file specific to each energy, irradiation conditions, the dose distribution was calculated using a computerized treatment planning equipment (Eclipse ver 10.0.39, Varian, USA). Measuring performance and cause errors in MapCHECK 2 were analyzed and measured against. In order to verify the performance of the MapCHECK 2, 6X, 6X-FFF, 10X, 10X-FFF, 15X field size $10{\times}10$ cm, gantry $0^{\circ}$, $180^{\circ}$ direction was measured by the energy. IGRT couch of the CT values affect the measurements in order to confirm, CT number values : -800 (Carbon) & -950 (COUCH in the air), -100 & 6X-950 in the state for FFF, 15X of the energy field sizes $10{\times}10$, gantry $180^{\circ}$, $135^{\circ}$, $275^{\circ}$ directionwas measured at, MapPHAN allocated to confirm the value of HU were compared, using the treatment planning computer for, Measurement error problem by the sharp edges MapPHAN Learn gantry direction MapPHAN of dependence was measured in three ways. GANTRY $90^{\circ}$, $270^{\circ}$ in the direction of the vertically erected settings 6X-FFF, 15X respectively, and Setting the state established as a horizontal field sizes $10{\times}10$, $90^{\circ}$, $45^{\circ}$, $315^{\circ}$, $270^{\circ}$ of in the direction of the energy-6X-FFF, 15X, respectively, were measured. Without intensity modulated beam of the third open arc were investigated. Results: Of basic performance MapCHECK confirm the attenuation measured by Couch, measured from the measured HU values that are assigned to the MAP-PHAN, check for calculation accuracy for the angled edge of the MapPHAN all come in a range of valid measurement errors do not affect the could see. three ways for the Gantry direction dependence, the first of the meter built into the value of the Gantry $270^{\circ}$ (relative $0^{\circ}$), $90^{\circ}$ (relative $180^{\circ}$), 6X-FFF, 15X from each -1.51, 0.83% and -0.63, -0.22% was not affected by the AP/PA direction represented. Setting the meter horizontally Gantry $90^{\circ}$, $270^{\circ}$ from the couch, Energy 6X-FFF 4.37, 2.84%, 15X, -9.63, -13.32% the difference. By-side direction measurements MapPHAN in value is not within the valid range can not, because that could be confirmed as gamma pass rate 3% of the value is greater than the value shown. You can check the Open Arc 6X-FFF, 15X energy, field size $10{\times}10$ cm $360^{\circ}$ rotation of the dose distribution in the state to look at nearly 90% pass rate to emerge. Conclusion: Based on the above results, the MapPHAN gantry direction dependence by side in the direction of the beam relative dose distribution suitable for measuring the gamma value, but accurate measurement of the absolute dose can not be considered is. this paper, a more accurate treatment plan in order to confirm, Reduce the tolerance for VMAT, such as lateral rotation investigation in order to measure accurate absolute isodose using a combination of IMF (Isocentric Mounting Fixture) MapCHEK 2, will be able to minimize the impact due to the angular dependence.

  • PDF

The Legal Theory on the Civil Execution against Aircraft (항공기 집행에 관한 법리)

  • Kwon, Chang-Young
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.30 no.2
    • /
    • pp.83-153
    • /
    • 2015
  • As our economy grows and the number of aircraft increase, the number of civil execution against aircraft cases are likely to increase as well in the future. The purpose of this article is to present the legal theory on the civil execution against aircrafts by drawing on the legal theory on the civil execution against vessels which constitute a relatively large number of cases thus observed. The provisions of the civil execution against immovables or vessel, shall basically apply mutatis mutandis to the civil execution against aircraft or light aircraft. The civil execution against ultra-light flying devices or a foreign aircraft shall be executed in conformity with the civil execution against movables. There are a compulsory auction, an auction to execute a security right to aircraft, and an auction under the right of retention, etc. in the civil execution against an aircraft. A compulsory execution against an aircraft means an execution carried out by a creditor against a debtor's aircraft to obtain satisfaction of claims for the purpose of payment of money. The court of execution of a compulsory execution against an aircraft shall be the district court having jurisdiction over the airport of stoppage or storage of such aircraft at the time of seizure. The forums of execution of a compulsory execution against an aircraft shall be exclusive forums. When a court has rendered an order on commencing an auction, it shall order an execution officer to receive a certificate of the aircraft's registration and other documents as required for its operation, and to submit them to the court. A court may revoke the procedures for a compulsory auction when an execution officer fails to obtain a transfer of the aircraft's registration certificate, etc. and the location of the aircraft is not evident, not later than an elapse of 2 months from the date on which an order on commencing an auction has been rendered. In the case where it is deemed that there exists a business-related need or other based on proper reasoning, the court may permit the aircraft's operation, upon the motion submitted by the debtor. In this case, there shall be a consent from the creditor, the highest bidder, the next highest bidder and successful bidder. A court may, upon a motion submitted by the creditor, make the dispositions required for observing and preserving the aircraft. When a debtor has submitted the documents under subparagraph 2 or 4 of the Article 49 of the Civil Execution Act, and furnished the guarantee equivalent to the claims of the execution creditors and the creditors demanding a distribution and to the costs for execution, before a declaration of bid, the court shall, upon request, revoke other procedures than those for distribution. The provisions of a obligatory auction against vessel or aircraft and an auction to execute a security right to real estate or vessel, shall apply mutatis mutandis to an auction to execute the security right to aircraft. In an auction to execute the security right to aircraft case, an executive title is not necessary. An executory exemplification is not necessary in an application for an auction to execute the security right to aircraft. A court should examine the existence of security right and claim secured. No order on commencing an auction procedure shall be issued with non-existence or invalidity of the security right and absence or extinguishment of the claim secured. Furthermore, these prohibitions are the reason of a decision on non-permit for sale, the court overlooked these prohibitions, and the decision on a permit for sale became final and conclusive, the successful bidder who paid the price and registered of ownership could not acquire ownership of the aircraft sold. A court may render a ruling to put plural aircrafts up for a blanket auction, only when they are in restraint and related matter (Supreme Court Order 2001Ma3688 dated on August 22, 2001). A righter of retention on aircraft may file a request for an auction against the aircraft. The provisions of an auction to execute a security right to aircraft shall apply mutatis mutandis to the formal auction. Airport facility fee and an aircraft are not in restraint and related matter, so an airport management corporation does not hold the right of retention on the aircraft (Supreme Court Decision 2011Da29291 decided on April 10, 2014). In an auction in accordance with the right of retention, all encumbrances (e.g., mortgages) on the sold aircraft shall be extinguished by a sale under the legal conditions for sale. Not only creditors who have claims for preferential payment but also general creditors could demand for distribution. The precedence of the claim of the right of retention on aircraft and that of general creditor's claims are equal.