Process and manufacturing data are numerously accumulated to the enterprise database in industries but little of those data are utilized. Data mining can support a decision to manager in process from the data. However, it is not easy to field managers because a proper adoption of various schemes is very difficult. In this paper, six scenarios are conducted using data mining schemes for the various situations of field claims such as yield problem, trend analysis and prediction of yield according to changes of operating conditions, etc. Scenarios, like templates, of various analysis situations are helpful to users.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.05a
/
pp.124-125
/
2018
The objective of this study is analyzing of requirements for improvement of the work-life balance of construction managers working in Korean construction companies. A survey has been conducted to analyze the requirements for improvement of construction managers. The survey was conducted on construction managers working in the field of architectural construction. 59 field managers working in 18 Korean construction companies responded to the survey. Upon analysis of the survey, the working hours were excessive and recreational time was very poor for the construction managers. There were differences in the answers regarding the areas that require improvement in the working conditions based on the age groups of the construction managers. A majority of young technicians selected that the recreational time and content of work require improvement, and technicians with a lot of experience selected that the stability of occupation and wage require improvement.
Journal of the Korea Society of Computer and Information
/
v.23
no.12
/
pp.145-151
/
2018
While commercialization of IoT technologies in the safety management sector is being promoted in terms of industrial safety of large indoor businesses, implementing a system for risk management of small outdoor work sites with frequent site movements is not actively implemented. In this paper, we propose an efficient dynamic workload balancing strategy which combined low-power, wide-bandwidth (LPWA) communication and low-power Bluetooth (BLE) communication technologies to support customized risk management alarm systems for each individual (driver/operator/manager). This study was designed to enable long-term low-power collection and transmission of traffic information in outdoor environment, as well as to implement an integrated real-time safety management system that notifies a whole field worker who does not carry a separate smart device in advance. Performance assessments of the system, including risk alerts to drivers and workers via Bluetooth communication, the speed at which critical text messages are received, and the operation of warning/lighting lamps are all well suited to field application.
Journal of Korean Academy of Nursing Administration
/
v.6
no.3
/
pp.333-345
/
2000
The health care environment becomes more competitive every day. It has fallen to nurse managers - from vice presidents of patient care to nurse managers and their assistants - to recruit and develop a workforce that successfully meets the needs of both patients and the organization. This means employees who demonstrate advanced critical thinking skills, creative problem solving, and sound decision making skills combined with clinical skills and patient advocacy. The environment which nurse managers create and the way they relate to their workforce, are pivotal to organizational viability. Especially leadership of first -line nurse managers contributes to the success of their organizations. First-line nurse managers are deserved to be one of the most administrative supervisors through the middle stratum in a hospital organization as being a manager in the field service if assessed from the overall aspects of hospital, as being an interim managers in the nursing department as well as being a supreme supervisor in a unit in terms of an organizational structure in the hospital. Similarly, as a compete leader, the first-line nurse managers have not only a professional which is qualified to perform a role of appropriate coordination with medical staff and key personnel but also hold an important key position a being responsible for performing his or her given role. The first-line nurse manager is expected to manage human and fiscal resources in ways not required before. While an identified need for well-prepared first-line nurse manager continues to plague the profession, first-line nurse managers often have difficulty providing the leadership required. The need leadership training to function effectively in their positions. But we hardly find a useful leadership training program for first-line nurse managers, therefore the purpose of this study was to developed the leadership training program for them. The steps of leadership program development were below: 1st step, 2 studies were done before develop a leadership program. One was done to ask to first-line nurse managers what they want to learn through leadership training, the other one was to ask the staff nurses what their opinions are for their first-line nurse managers leadership. 2nd step was searching other leadership programs contents. The results of this study were below: The total amount of hours is 24. Leadership training program contents are : Future of nursing profession (210min), understanding basic factor's of leadership and leadership theories(310 min), self understanding as first- line nurse managers(320 min), basic principle and practice of interpersonal relationship(210 min), assertiveness training, conflict management (180min), and group study(210min). This is challenging time to be a leader, especially in nursing. As nurse managers look toward the new millennium, it seems as through the same struggles are ahead that are behind. So nurse managers need to embrace change with a positive attitude. They need to demonstrate risk taking and support it in their staffs. All these things are possible that after they participate the leadership training program.
Journal of the Korea Institute of Construction Safety
/
v.3
no.1
/
pp.32-40
/
2020
In this study, an application was developed to reduce the work between labor and safety managers and to hire better workers when hiring workers. With the expected increase in foreign workers in the future, the number of illegal workers will also increase. As a result, accident and on-site management are becoming more difficult due to insufficient information collection of workers. Therefore, it was possible to secure on-site safety through an application that could collect accurate information and reduce the time of information exchange between safety managers and labor managers. In addition, the application was designed to help the safety manager identify the faithful workers more quickly when re-employment of the day laborers if many day laborers were assessed and filled out as they were. This anticipates the expected effect of shortening the construction period. The current application collected necessary information through an interview with the site manager. If the company collects more information needed in the field and has big data than it has collected necessary information so far, it will be highly competitive in the market as it can improve the completeness of applications by establishing opinions and reflecting information accordingly.
Park, Jin-Ho;Lee, Kang-Hyun;Shin, Young-Jin;Kim, Jae-Young;Lee, In-Mo
Journal of Korean Tunnelling and Underground Space Association
/
v.16
no.6
/
pp.599-614
/
2014
When tunnelling with TBM (Tunnel Boring Machine), accessibility to tunnel face is very limited because tunnel face is mostly occupied by a bunch of machines. Existing techniques that can predict ground condition ahead of TBM tunnel are extremely limited. In this study, the TBM Resistivity Prediction (TRP) system has been developed for predicting anomalous zone ahead of tunnel face utilizing electrical resistivity. The applicability and prediction accuracy of the developed system has been verified by performing field tests at subway tunnel construction site in which an EPB (Earth Pressure Balanced) shield TBM was used for tunnelling work. The TRP system is able to predicts the location, thickness and electrical properties of anomalous zone by performing inverse analysis using measured resistivity of the ground. To make field tests possible, an apparatus was devised to attach electrode to tunnel face through the chamber. The electrode can be advanced from the chamber to the tunnel face to fully touch the ground in front of the tunnel face. In the 1st field test, none of the anomalous zone was predicted, because the rock around the tunnel face has the same resistivity and permittivity with the rock ahead of tunnel face. In the 2nd field test, 5 m thick anomalous zone was predicted with lower permittivity than that of the rock around the tunnel face. The test results match well with the ground condition predicted, respectively, from geophysical exploration, or directly obtained either from drilling boreholes or from daily observed muck condition.
Journal of Korean Library and Information Science Society
/
v.52
no.3
/
pp.177-196
/
2021
The purpose of this study is to analyze priorities of competencies and to find the direction of development of teacher librarian training and retraining program. A total of 238 subjects were used for the final analysis. They were analayzed using IPA, Borich's needs analysis and the Locus for Focus model. As a result, First, teacher librarians perceived that the importance and performance of teacher and manager competency were higher than information specialist and cooperative leader. Second, they needed competencies of data-science, coding, Internet of Things in the field of information specialist as changing educational environment. Third, they needed competencies of information ethics, copyright instruction, and digital and media literacy education in the field of teacher. Fourth, they needed competencies of facility designing for future education, online and offline school library marketing skills, and establishment of makerspaces and learning commons in the field of ibrary manager. Fifth, they needed competencies of library based instruction, library cooperative instruction, and building a collection related to subject in the field of cooperative leader. Sixth, the highest required competency for teacher librarians was suggested for teacher librarians' role area.
Journal of Fisheries and Marine Sciences Education
/
v.23
no.2
/
pp.244-252
/
2011
This study was carried out through survey based on job candidates of marine-bio, marine logistics, and GIS in order to train the human resources with the IT combined ability in the field of fisheries and oceans in Busan. Also, it included the survey on the field of the human resource development which businesses require in Busan. The analysis showed that food industry was most preferred by job candidates and the most required efforts for self-development to employ was to improve their English skills. The most preferred area was Busan and their salary requirements were in the 25 million to 30 million Won range. In findings on survey of businesses, businesses showed a profound interest in HACCP qualification in sea food and logitics manager qualification, and thought that the abilities that job candidates must have were communication and creativity rather than major and skills.
International journal of advanced smart convergence
/
v.10
no.3
/
pp.245-256
/
2021
This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.
Journal of the Korea Institute of Building Construction
/
v.14
no.2
/
pp.150-155
/
2014
The success of construction projects is heavily dependent on the work ability of the field managers who manage the execution of projects. The work ability of field managers is influenced by various elements such as job stress and individual characteristics. The purpose of this study is to reveal the factors influencing the work ability of construction field managers in Korea. Work ability is evaluated bases on the Work Ability Index(WAI) developed by the Finnish Institute of Occupational Health, while job stress is measured using the Korean Occupational Stress Questionnaire Short Form developed by the Korean Occupational Safety & Health Agency. The results showed that field managers under higher job stress have lower work abilities. In addition, it is revealed that exercise or religious practice have a positive influence on work ability. This study will help to increase the work ability and enable the efficient management of organization at building construction sites.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.