• Title/Summary/Keyword: field manager

Search Result 296, Processing Time 0.028 seconds

Scenarios for Manufacturing Process Data Analysis using Data Mining (데이터 마이닝을 이용한 생산공정 데이터 분석 시나리오)

  • Lee, Hyoung-wook;Bae, Sung-min
    • Journal of Institute of Convergence Technology
    • /
    • v.3 no.1
    • /
    • pp.41-44
    • /
    • 2013
  • Process and manufacturing data are numerously accumulated to the enterprise database in industries but little of those data are utilized. Data mining can support a decision to manager in process from the data. However, it is not easy to field managers because a proper adoption of various schemes is very difficult. In this paper, six scenarios are conducted using data mining schemes for the various situations of field claims such as yield problem, trend analysis and prediction of yield according to changes of operating conditions, etc. Scenarios, like templates, of various analysis situations are helpful to users.

  • PDF

Analysis of Requirements for Improvement of the Work-Life Balance of Construction Managers (건축공사 현장관리자의 워라밸 개선에 대한 요구사항 분석)

  • Lim, Hyeong-Eun;Noh, Ju-Seong;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.124-125
    • /
    • 2018
  • The objective of this study is analyzing of requirements for improvement of the work-life balance of construction managers working in Korean construction companies. A survey has been conducted to analyze the requirements for improvement of construction managers. The survey was conducted on construction managers working in the field of architectural construction. 59 field managers working in 18 Korean construction companies responded to the survey. Upon analysis of the survey, the working hours were excessive and recreational time was very poor for the construction managers. There were differences in the answers regarding the areas that require improvement in the working conditions based on the age groups of the construction managers. A majority of young technicians selected that the recreational time and content of work require improvement, and technicians with a lot of experience selected that the stability of occupation and wage require improvement.

  • PDF

Design and Implementation of Road Construction Risk Management System based on LPWA and Bluetooth Beacon

  • Lee, Seung-Soo;Kim, Yun-cheol;Jee, Sung-Hyun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.12
    • /
    • pp.145-151
    • /
    • 2018
  • While commercialization of IoT technologies in the safety management sector is being promoted in terms of industrial safety of large indoor businesses, implementing a system for risk management of small outdoor work sites with frequent site movements is not actively implemented. In this paper, we propose an efficient dynamic workload balancing strategy which combined low-power, wide-bandwidth (LPWA) communication and low-power Bluetooth (BLE) communication technologies to support customized risk management alarm systems for each individual (driver/operator/manager). This study was designed to enable long-term low-power collection and transmission of traffic information in outdoor environment, as well as to implement an integrated real-time safety management system that notifies a whole field worker who does not carry a separate smart device in advance. Performance assessments of the system, including risk alerts to drivers and workers via Bluetooth communication, the speed at which critical text messages are received, and the operation of warning/lighting lamps are all well suited to field application.

A Study on the development of leadership training program for first-line nurse managers (일선 간호관리자를 위한 리더십 훈련 프로그램 개발)

  • Koh, Myung-Suk;Han, Sung-Suk
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.6 no.3
    • /
    • pp.333-345
    • /
    • 2000
  • The health care environment becomes more competitive every day. It has fallen to nurse managers - from vice presidents of patient care to nurse managers and their assistants - to recruit and develop a workforce that successfully meets the needs of both patients and the organization. This means employees who demonstrate advanced critical thinking skills, creative problem solving, and sound decision making skills combined with clinical skills and patient advocacy. The environment which nurse managers create and the way they relate to their workforce, are pivotal to organizational viability. Especially leadership of first -line nurse managers contributes to the success of their organizations. First-line nurse managers are deserved to be one of the most administrative supervisors through the middle stratum in a hospital organization as being a manager in the field service if assessed from the overall aspects of hospital, as being an interim managers in the nursing department as well as being a supreme supervisor in a unit in terms of an organizational structure in the hospital. Similarly, as a compete leader, the first-line nurse managers have not only a professional which is qualified to perform a role of appropriate coordination with medical staff and key personnel but also hold an important key position a being responsible for performing his or her given role. The first-line nurse manager is expected to manage human and fiscal resources in ways not required before. While an identified need for well-prepared first-line nurse manager continues to plague the profession, first-line nurse managers often have difficulty providing the leadership required. The need leadership training to function effectively in their positions. But we hardly find a useful leadership training program for first-line nurse managers, therefore the purpose of this study was to developed the leadership training program for them. The steps of leadership program development were below: 1st step, 2 studies were done before develop a leadership program. One was done to ask to first-line nurse managers what they want to learn through leadership training, the other one was to ask the staff nurses what their opinions are for their first-line nurse managers leadership. 2nd step was searching other leadership programs contents. The results of this study were below: The total amount of hours is 24. Leadership training program contents are : Future of nursing profession (210min), understanding basic factor's of leadership and leadership theories(310 min), self understanding as first- line nurse managers(320 min), basic principle and practice of interpersonal relationship(210 min), assertiveness training, conflict management (180min), and group study(210min). This is challenging time to be a leader, especially in nursing. As nurse managers look toward the new millennium, it seems as through the same struggles are ahead that are behind. So nurse managers need to embrace change with a positive attitude. They need to demonstrate risk taking and support it in their staffs. All these things are possible that after they participate the leadership training program.

  • PDF

A Study on the Information Management of Construction Workers Using Smartmaker of Site Safety Management Supervisor (현장 안전관리 감독자의 smartmaker 를 활용한 건설현장 근로자 정보 관리의 관한 연구)

  • Kim, Sung-hyun;Lee, Ji-yeob;Son, Kiyoung
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.3 no.1
    • /
    • pp.32-40
    • /
    • 2020
  • In this study, an application was developed to reduce the work between labor and safety managers and to hire better workers when hiring workers. With the expected increase in foreign workers in the future, the number of illegal workers will also increase. As a result, accident and on-site management are becoming more difficult due to insufficient information collection of workers. Therefore, it was possible to secure on-site safety through an application that could collect accurate information and reduce the time of information exchange between safety managers and labor managers. In addition, the application was designed to help the safety manager identify the faithful workers more quickly when re-employment of the day laborers if many day laborers were assessed and filled out as they were. This anticipates the expected effect of shortening the construction period. The current application collected necessary information through an interview with the site manager. If the company collects more information needed in the field and has big data than it has collected necessary information so far, it will be highly competitive in the market as it can improve the completeness of applications by establishing opinions and reflecting information accordingly.

Predicting ground condition ahead of tunnel face utilizing electrical resistivity applicable to shield TBM (Shield TBM에 적용 가능한 전기비저항 기반 터널 굴착면 전방 예측기술)

  • Park, Jin-Ho;Lee, Kang-Hyun;Shin, Young-Jin;Kim, Jae-Young;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.6
    • /
    • pp.599-614
    • /
    • 2014
  • When tunnelling with TBM (Tunnel Boring Machine), accessibility to tunnel face is very limited because tunnel face is mostly occupied by a bunch of machines. Existing techniques that can predict ground condition ahead of TBM tunnel are extremely limited. In this study, the TBM Resistivity Prediction (TRP) system has been developed for predicting anomalous zone ahead of tunnel face utilizing electrical resistivity. The applicability and prediction accuracy of the developed system has been verified by performing field tests at subway tunnel construction site in which an EPB (Earth Pressure Balanced) shield TBM was used for tunnelling work. The TRP system is able to predicts the location, thickness and electrical properties of anomalous zone by performing inverse analysis using measured resistivity of the ground. To make field tests possible, an apparatus was devised to attach electrode to tunnel face through the chamber. The electrode can be advanced from the chamber to the tunnel face to fully touch the ground in front of the tunnel face. In the 1st field test, none of the anomalous zone was predicted, because the rock around the tunnel face has the same resistivity and permittivity with the rock ahead of tunnel face. In the 2nd field test, 5 m thick anomalous zone was predicted with lower permittivity than that of the rock around the tunnel face. The test results match well with the ground condition predicted, respectively, from geophysical exploration, or directly obtained either from drilling boreholes or from daily observed muck condition.

A Study on Analysis of Importance-Performance on Teacher Librarians' Competencies (사서교사 직무 역량에 대한 중요도·만족도 분석)

  • Lee, Seung-Min;Lim, Jeong-Hoon;Kang, Bong-Suk;Lee, Byeong-Kee
    • Journal of Korean Library and Information Science Society
    • /
    • v.52 no.3
    • /
    • pp.177-196
    • /
    • 2021
  • The purpose of this study is to analyze priorities of competencies and to find the direction of development of teacher librarian training and retraining program. A total of 238 subjects were used for the final analysis. They were analayzed using IPA, Borich's needs analysis and the Locus for Focus model. As a result, First, teacher librarians perceived that the importance and performance of teacher and manager competency were higher than information specialist and cooperative leader. Second, they needed competencies of data-science, coding, Internet of Things in the field of information specialist as changing educational environment. Third, they needed competencies of information ethics, copyright instruction, and digital and media literacy education in the field of teacher. Fourth, they needed competencies of facility designing for future education, online and offline school library marketing skills, and establishment of makerspaces and learning commons in the field of ibrary manager. Fifth, they needed competencies of library based instruction, library cooperative instruction, and building a collection related to subject in the field of cooperative leader. Sixth, the highest required competency for teacher librarians was suggested for teacher librarians' role area.

A Study on the Human Resources Development with the IT Combined Ability in the Field of Fisheries and Oceans in Busan (부산지역 해양수산 IT융합 인적자원개발에 관한 연구)

  • Jang, Young-Soo;Park, Jong-Un;Song, Jung-Hun;Choi, Sung-Wook
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.23 no.2
    • /
    • pp.244-252
    • /
    • 2011
  • This study was carried out through survey based on job candidates of marine-bio, marine logistics, and GIS in order to train the human resources with the IT combined ability in the field of fisheries and oceans in Busan. Also, it included the survey on the field of the human resource development which businesses require in Busan. The analysis showed that food industry was most preferred by job candidates and the most required efforts for self-development to employ was to improve their English skills. The most preferred area was Busan and their salary requirements were in the 25 million to 30 million Won range. In findings on survey of businesses, businesses showed a profound interest in HACCP qualification in sea food and logitics manager qualification, and thought that the abilities that job candidates must have were communication and creativity rather than major and skills.

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

Factors Influencing the Work Ability of Building Construction Field Managers (건축공사 현장관리자 작업능력에 영향을 미치는 요인)

  • Shin, Jung-Hyun;Lee, Woo-Hwan;Choi, Young-Wha;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.2
    • /
    • pp.150-155
    • /
    • 2014
  • The success of construction projects is heavily dependent on the work ability of the field managers who manage the execution of projects. The work ability of field managers is influenced by various elements such as job stress and individual characteristics. The purpose of this study is to reveal the factors influencing the work ability of construction field managers in Korea. Work ability is evaluated bases on the Work Ability Index(WAI) developed by the Finnish Institute of Occupational Health, while job stress is measured using the Korean Occupational Stress Questionnaire Short Form developed by the Korean Occupational Safety & Health Agency. The results showed that field managers under higher job stress have lower work abilities. In addition, it is revealed that exercise or religious practice have a positive influence on work ability. This study will help to increase the work ability and enable the efficient management of organization at building construction sites.