• Title/Summary/Keyword: feasibility analysis

Search Result 3,689, Processing Time 0.5 seconds

Feasibility study of the energy supply system for horticulture facility using dynamic energy simulation (동적 에너지 시뮬레이션을 이용한 시설원예용 에너지 공급시스템의 경제성 분석)

  • Yu, Min-Gyung;Cho, Jeong-Heum;Nam, Yujin
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.103-109
    • /
    • 2015
  • Recently, the usage of renewable energy system has been recommended because of the energy saving and depletion of fossil fuel. Especially, ground source heat pump system(GSHP) has a high efficiency by using annual stable ground temperature. Also, wood pellet is low cost and a high calorific value compared to fossil fuel. However, only small number of farms have applied renewable energy system to horticultural facility because of a high initial costs and uncertainty of its cost efficiency. In this study, in order to analyze the feasibility for the horticulture, TRNSYS simulation based on the standard horticultural facility was conducted in different weather and covering material conditions. Then, comparative feasibility analysis of each energy supplying system was conducted. As a result, we have found out that a high initial cost of renewable energy system was recovered by the economics of the energy cost. Due to the energy cost reduction, the payback periods were 10-11 years in the case of GSHP and 4-6 years in the case of wood pellet boiler.

A Feasibility and Survey Study on the Hanok housing complex project within Seoul Metropolitan Area (수요자 설문조사 및 사업성분석을 통한 수도권 신도시 내 한옥단지 조성사업 타당성 검토)

  • Kim, Yong-Soo
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.14 no.3
    • /
    • pp.101-108
    • /
    • 2012
  • The purpose of this study was to set and analyze the feasibility and survey of the Hanok(The traditional Korean style house) housing complex project within Seoul metropolitan area. The results of this study were as follows. First of all, a survey was carried out to find out the optimum Hanok style. The survey showed that many people chose a frond and back yard garden as a merit of Hanok and pointed out the weak crime prevention as a weakness of Hanok. The optimum size for a Hanok was from $264m^2$ to $330m^2$ and living space was from $100m^2$ to $132m^2$. And people considered about 120% of what the apartment sells for as the reasonable price of a Hanok. Based on the survey, this study planned a Hanok housing complex on a lot that has competitive price and analysed the feasibility of the housing plan. The result was that Hanok's construction cost per $3.3m^2$ to be a marketable product has to be below about 6 million Won. As a result, the construction cost-saving through the advanced technology and planning to meet the changing customers' needs are needed to vitalize Hanok's supply.

A Study on the Feasibility Analysis for the Reconstruction Apartment Projects (아파트 재건축사업의 타당성분석절차에 관한 연구)

  • Lee Jae-Young;Jung Jung-Man;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.267-272
    • /
    • 2001
  • The purpose of this study is to suggest the process and calculating method of feasibility study for the reconstruction apartment projects, and the results of this study is fundamental knowledge for the exact and exquisite plan. The process of this study are as following : 1. Research for the process and peculiar character of reconstruction project. 2. Investigate input and output item and suggest the calculating methods that are generally accepted. 3. Suggest the general process on feasibility study for reconstruction apartment project.

  • PDF

A study on economic analysis of new renewable energy power(photovoltaic, wind power, small hydro, biogas) (신재생에너지 발전(태양광, 풍력, 소수력, 바이오가스)의 경제성 분석 연구)

  • Kim, Chong-Min;Kim, Ki-Young
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.6
    • /
    • pp.70-77
    • /
    • 2008
  • The purpose of this study evaluates a feasibility and economical efficiency of new renewable energy. According as weather change is serious problem now days, every people make attention to the reduction of greenhouse gas. The revitalization of new renewable energy creates the variety of energy source, stability of energy supply and reduction of greenhouse gas. In this study evaluates a feasibility and economical efficiency from new renewable energy of various photo voltaics, wind power, small hydro and biogas. Feasibility does in standard of technical characteristic, politic support, marketability, establishment present condition and development aim. Economical efficiency does in standard of developmental unit cost, utilization factor, equipment life, politic support cost, interest ratio. The results of this study were as follows photo voltaics, wind, small hydropower, biogas in order feasibility is high. Developmental unit cost, utilization factor, equipment life, politic support cost and analyzed the relationship of interest ratio fluctuation and economical efficiency. From all new renewable energy the utilization factor most is important in economical efficiency but necessary utilization factor is difficult because environmental problem.

Development of Beam-Column Connection for The New Apartment Structural System (장수명 공동주택용 보-기둥 접합부 시공방법 개발)

  • Yoon, Tae-Ho;Hong, Won-Kee;Kim, Sun-Kuk;Park, Seon-Chee;Yun, Dai-Young
    • KIEAE Journal
    • /
    • v.10 no.6
    • /
    • pp.145-151
    • /
    • 2010
  • Bearing wall system was used extensively in most multi-residential apartment buildings in Korea. However, bearing wall apartments have the lack of architectural plan flexibility, remodelling-incompatible, causing serious economic losses in terms of construction waste. Recently, many researchers have studied the use of Rahmen structure as a potential alternative. The beam-column connection in the paper for long-life apartment housing forms connection of a Rahmen structure utilizing the advantages of steel and reinforced concrete. In addition, reduction of cast-in place concrete and construction schedule is expected by using precast concrete. Reduction effect of quantity decreased construction costs and $CO_2$ emission of key construction materials. However, verifying the feasibility of new construction method entails numerous challenges. Accordingly, the purpose of this study is to analyze the construction feasibility of sleeve, coupler, and pressure welding connections for long-life apartment building structure. A 3D modeling software was used to perform the analysis, and a real scale model was created to verify the results of construction feasibility. By verifying the construction feasibility of beam-column connections, this study will contribute to the efficient application of these methods on construction sites.