• Title/Summary/Keyword: feasibility analysis

Search Result 3,674, Processing Time 0.035 seconds

Identifying Criteria for Feasibility Study of Housing Development Projects (공동주택 개발사업 타당성 분석대상 항목의 평가기준 설정)

  • Shin, Woo-Shik;Park, Keun-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.110-118
    • /
    • 2005
  • This paper examines the method of evaluation for feasibility study factors on housing development projects which can assist project managers to asses potential sources of risk. The aim is to reduce uncertainty on the project objectives. The major initial goals for a feasibility analysis are to define a limited set of key related factors which apply to housing development project according to development and market environment, condition of project planning and economics. Thus, in order to construct types of factors related with the feasibility, the research executes Delphi Method subjected personnel in the task to explore housing development projects. Such exploration provide the information for Importance Index, Extra Weight and the Mean of Extra Weight that is used for constituting confines of factors related with a feasibility analysis.

An Analysis on the Pre-Feasibility Evaluation Factors of Activation for Welfare Facilities for the Residents in Apartment Building (공동주택 주민복지시설의 활성화를 위한 사전 타당성 평가요인 분석)

  • Kim, Young-Hoon;Kang, Hyun-Wook;Won, Yoo-Man;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.160-167
    • /
    • 2011
  • An Analysis on the Pre-Feasibility Evaluation Factors of Activation for Welfare Facilities for the Residents in Apartment Building. The adapted research method of selected case five apartment building in D new town and carried out questionnaire survey to residents and user for draw items of feasibility evaluation. Drew items of feasibility evaluation classify as Plan section, Design section, and Operation section and evaluate the weight of each section utilizing analytical hierarchy process (AHP). Depending on the purpose and methods. The results of this study are as follows: Such as Plan section, Composition of Program Facility, User Charge Survey, Arrangement of Program Room were analyzed highest. Such as Design section, Arrangement of Program Room, Circulation planning, Educational Equipment were analyzed highest. And such as Operation section, Operation costs, Operation Plan, Review of Program Facility were analyzed highest.

The Economic Feasibility Analysis of a Small Size Aircraft Development for BASA Certification (항공기급 BASA 인증을 위한 소형항공기개발사업의 경제성분석)

  • Park, Jin-Woo;Hur, Hee-Young;Seo, Hae-Jong
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.324-327
    • /
    • 2008
  • This research seeks to investigate the economic feasibility of a small size aircraft development and BASA certification enterprise. To achieve the objective, this research investigates cost which requires for proceeding a small size aircraft development and BASA certification enterprise. This research also investigates the economic effects and economic benefits acquired from exporting civil aircraft. Costs and benefits are assumed using cash flow by types of airplanes. On the basis of the cash flow, this research calculates B/C ratio, NPV, IRR for investigating the economic feasibility. The result shows that there are economic feasibility for both very light jet and piston aircraft. Between these two aircraft types, more economic feasibility exist for very light jet than piston aircraft.

  • PDF

A Conceptual Design and Feasibility Analysis of a Window Cleaning Device (유리창 청소장치의 개념 디자인 및 경제적 타당성 예측)

  • Kim, Kyoon-Tai;Jun, Young-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.537-543
    • /
    • 2020
  • The window cleaning works are manpower-dependent and are performed in an unstable posture at high altitude, so that there is a risk of falling. Therefore, there is an urgent need to improve the safety of workers. In this study, a conceptual design was proposed for the cleaning of exterior windows of a building, and the economic feasibility of the proposed conceptual model was analyzed. The proposed model is designed to avoid protrusions such as window frames, and to be able to respond even if the shapes of the upper and lower parts are different. As a result of analyzing the economic feasibility of the designed conceptual model, the benefit cost ratio was 4.48, which was significantly higher than 1. Therefore, the economic feasibility of the proposed window cleaning device is expected to be sufficient. The results analyzed in this paper will be used in the development and marketing of the window cleaning device.

The Economics Evaluation of Grid-connected Photovoltaic Systems in Residential Houses

  • Lee, Hyun-Seung;Kim, Sung-Bum;Shin, U-Cheul
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.5-10
    • /
    • 2015
  • Purpose: To evaluate the economic performance of grid-connected photovoltaic system in residential house, household electricity bill policy of Korea Electric Power Corporation (KEPCO) must be applied precisely, and market tendency and uncertainty of system also need to be considered. In this study, to evaluate the economic feasibility of PV system, we measured PV power generation and electricity consumption of six of Green home in Daejeon through web based remote monitoring system. Method: We applied Monte-Carlo simulation based on life cycle cost analysis, to reflect an uncertainty of main factor in economic feasibility evaluation of photovoltaic system. Result: First, with deterministic analysis, the difference of NPV of cumulative financial savings among households varied from -3,310 ~ 24,170 thousand won, portraying notably big range. Also the possibility of getting the same result was 50% when applying uncertainty. Second, the higher electricity consumption is, the more economic feasibility of photovoltaic system increases because KEPCO uses progressive taxation in household electricity bill policy. Third, The contribution to variance of electricity price increases in NPV varied from 98.5% to 99.9%. While the inflation rate and annual degradation contributed very little to none.

A Theoretical Study on the Feasibility Analysis of Forestland Purchase - Especially on the Financial Analysis - (임지매입(林地買入) 타당성(妥當性) 분석(分析)을 위한 이론적(理論的) 고찰(考察) - 재무분석(財務分析)을 중심(中心)으로 -)

  • Park, Myong Kyu;Seol, In Joon
    • Journal of Korean Society of Forest Science
    • /
    • v.61 no.1
    • /
    • pp.53-59
    • /
    • 1983
  • Premise was needed to develop and utilize forestland for productive use. First, the market price of forestlands should be fixed on a reasonable level. Secondly, it should be ascertained whether efficient and economical use of capital is possible when individual investors intend to develop the forestland. Therefore, this study recommends the method for estimating the market price of forestland and theoretical methodology on feasibility of development promotion for individual investors.

  • PDF

Topological Analysis of the Feasibility and Initial-value Assignment of Image Segmentation (영상 분할의 가능성 및 초기값 배정에 대한 위상적 분석)

  • Doh, Sang Yoon;Kim, Jungguk
    • Journal of KIISE
    • /
    • v.43 no.7
    • /
    • pp.812-819
    • /
    • 2016
  • This paper introduces and analyzes the theoretical basis and method of the conventional initial-value assignment problem and feasibility of image segmentation. The paper presents topological evidence and a method of appropriate initial-value assignment based on topology theory. Subsequently, the paper shows minimum conditions for feasibility of image segmentation based on separation axiom theory of topology and a validation method of effectiveness for image modeling. As a summary, this paper shows image segmentation with its mathematical validity based on topological analysis rather than statistical analysis. Finally, the paper applies the theory and methods to conventional Gaussian random field model and examines effectiveness of GRF modeling.

Economic Analysis of Long-life Asphalt Pavements using KoPMS (한국형 포장관리시스템을 활용한 장수명 아스팔트 포장의 경제성 분석)

  • Do, Myungsik;Kwon, Sooahn;Baek, Jongeun;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.18 no.4
    • /
    • pp.19-28
    • /
    • 2016
  • PURPOSES : Long-life asphalt pavements are used widely in developed countries. In order to be able to devise an effective maintenance strategy for such pavements, in this study, we evaluated the performance of the long-life asphalt pavements constructed along the national highways in South Korea. Further, an economic evaluation of the long-life asphalt pavements was performed based on a life-cycle cost analysis. We aimed to devise a model for evaluating the performance of long-life asphalt pavements using the national highway pavement management system (PMS) database as well as for analyzing the economic feasibility of such pavements, in order to promote their use in South Korea. METHODS : The maintenance history and pavement performance data were obtained from the national highway PMS database. The pavement performances for a total of 292 sections of 10 lanes (5 northbound lanes and 5 eastbound lanes) of national highways were used in this study. Models to predict the performances of hot mix asphalt (HMA) and long-life asphalt pavements under two distinct traffic conditions were developed using a simple regression method. Further, the economic feasibility of long-life asphalt pavements was evaluated using the Korea Pavement Management System (KoPMS). RESULTS : We developed service-life prediction models based on the traffic volume and the equivalent of single-axle load and found that long-life asphalt pavements have service lives 50% longer than those of HMA pavements. Further, the results of the economic analysis showed that long-life asphalt pavements are superior in terms of various economic indexes, including user cost, delay cost, total cost, and user benefits, even though their maintenance cost is higher than that of HMA pavements. A comparison of the economic feasibilities of the various groups showed that group A is superior to HMA pavements in all aspects except in terms of the maintenance criterion (crack 20% or higher) as per the NPV index. However, the long-life asphalt pavements in group B were superior in terms of the maintenance criterion (crack 25% or higher) regardless of the economic feasibility. CONCLUSIONS : The service life of long-life asphalt pavements was found to be approximately 50% longer than that of HMA pavements, regardless of the traffic volume characteristics. The economic feasibility of long-life asphalt pavements was evaluated based on the KoPMS. The results of the economic analysis were the following: long-life asphalt pavements are exceptional in terms of almost all factors, such as user cost, delay cost, total cost, and user benefit; however, the exception is the maintenance cost. Further, the economic feasibility of the long-life asphalt pavements in group B was found to be better than that of the HMA pavements (crack 25% or higher).

An Economic Analysis of Domestic Fuel Cell Vehicles Considering Subsidy and Hydrogen Price (보조금과 수소가격을 고려한 국내 연료전지차의 경제성 분석)

  • Gim, Bongjin
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.26 no.1
    • /
    • pp.35-44
    • /
    • 2015
  • This paper deals with the economic analysis of domestic fuel cell vehicles considering subsidy and hydrogen price in 2015 and 2025. We selected TFCV (Tucson fuel cell vehicle) and TDV (Tucson diesel vehicle) to identify the economic feasibility of fuel cell vehicles compared with conventional internal combustion engine vehicles. We made some sensitivity analysis by changing input factors such as the size of the subsidy, the hydrogen price and the discount rate. Also, we made a break-even point analysis on hydrogen prices that equalize the economic feasibility of TFCV and TDV in 2025. As a result, TFCV is not economical in 2015 due to the relatively high prices of hydrogen and vehicles. If the sale prices of TFCV are 30,000,000 won and 35,000,000 won in 2025, then the break-even points of hydrogen prices are equal to 7,483 won/kg and 5,043 won/kg.

Economic Analysis of Zero Energy Building in South Korea - focusing on Cost-Benefit analysis considering Social Cost - (공사비 변화에 따른 제로에너지건축물 경제성 분석 - 사회적비용을 고려한 비용편익 분석을 중심으로 -)

  • Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.147-157
    • /
    • 2020
  • With the increasing obligation to reduce greenhouse gas emissions to the building sector, the government has been gradually expanding its obligation to zero-energy buildings since 2020. Since the ZEB certification took effect in 2017, 48 preliminary and main certifications have been completed as of March 2019, and most of them are public buildings or even certified, but have earned Grade 5 of ZEB. This means that compared with the number of annual building permits registered in Korea, the figure is insignificant, and that it receives little if not mandatory. Therefore, this study investigated empirical cases of ZEB additional construction cost and conducted cost benefit analysis according to changes in ZEB additional construction cost based on a preliminary feasibility analysis project recently conducted by the KDI. In addition, considering the public buildings, the social costs were considered, and the cost-benefit analysis method was the same as the KDI's preliminary feasibility analysis method. The analysis shows that if the ratio of ZEB additional construction cost is more than 5 percent, it is analyzed that there is no economic feasibility, and considering that the ratio of additional construction cost in the cases of ZEB in Korea is 17 percent to 38 percent, it will not be easy to obtain ZEB certification in terms of cost. Finally, to narrow these differences in cost and economic aspects, the overseas low energy and ZEB incentive examples proposed measures such as the concept of subsidy payment in Illinois and the compensation of social costs to private ZEB.