• Title/Summary/Keyword: feasibility analysis

Search Result 3,674, Processing Time 0.029 seconds

Feasibility Study on Environment-friendly Project to Improve Habitability in National Rental Apartment - focused on Gwangju City - (국민임대주택 주거환경 개선을 위한 친환경사업의 타당성 분석 - 광주광역시를 대상으로 -)

  • Park, Hyeon-Ku;Lee, Hyun-Chul
    • Journal of the Korean housing association
    • /
    • v.20 no.5
    • /
    • pp.23-30
    • /
    • 2009
  • In case of national rental apartment, habitability is generally evaluated low comparing with typical apartments. So, researches and investment are required to increase the residential environment. In this point of view, present study aims to suggest the basic data for improvement of homeless masses' dwelling level through economic feasibility analysis. Firstly national rental apartment, which habitability is considered to be low in the point of environment-friendly, welfare, and convenience, is chosen as objective. Secondly environment-friendly project items including project flow were set up, and then basic model was formed to evaluate economic feasibility through priority survey to residents. In result, priority for two items among six different proposals were higher than the others. This result could be useful when trying to increase the dwelling level of national rental apartment being planned to construct in future.

Evaluation of Economy Feasibility for Bridge Superstructures Using LCC Optimal Design (LCC 최적설계를 황용한 교량 상부구조의 경제성 평가)

  • Ahn Ye-Jun;Lee Kwang-Kyun;Park Jang-Ho;Shin Young-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.549-556
    • /
    • 2006
  • Life cycle cost is one of important factors in the evaluation of economy feasibility. Load carrying capacity curves for girders and decks are derived on the basis of bridge diagnostic results and condition grade curves to determine the service life and life cycle profile. The total life cycle costs including initial cost, damage cost, maintenance cost, user cost, and etc for the service life are calculated for steel box girder, PSC-I girder and rationalized plate girder. The optimal designs are performed for various service lifes and different superstructure types. The effects of parameters on the life cycle cost are investigated and the economy feasibility is evaluated through the sensitivity analysis.

  • PDF

The Feasibility Analysis of 9.9 MW Biomass Cogeneration System (9.9MW급 바이오매스 열병합발전 타당성 연구)

  • Choi, Jaiyoung;Shul, Yonggun
    • New & Renewable Energy
    • /
    • v.10 no.2
    • /
    • pp.40-47
    • /
    • 2014
  • This study is intended to analyze the appropriate scope for 9.9MW biomass cogeneration, feasibility and sensitivity according to changing market situation. In the study, the heat load is classified into three types to predict heat sales and find out the appropriate scope of thermal business that is operated in CHP 34.42 Gcal/h, PLBwg 70 Gcal/h of cogeneration. the feasibility is estimated based on internal rate of return (IRR) and net present value(NPV). the sensitivity is analyzed in terms of biomass fuel cost, unit price of heating cost, investment cost, SMP unit price and REC unit price.

Methodology of Feasibility Assessment for Small Hydropower Plant (소수력발전소의 건설 타당성분석 기법)

  • Park, W.S.;Lee, C.H.;Jeong, S.M.
    • Solar Energy
    • /
    • v.18 no.3
    • /
    • pp.153-160
    • /
    • 1998
  • The methodology and feasibility analysis model for small hydropower plant has been studied and developed. It consists of two main part, the performance prediction model to estimate the performance characteristics and economics anaysis model to evaluate economical characteristics for surveyed sites. The performance characteristics and feasibility assessment for surveyed sites were analyzed, using developed models. Also, primary design specifications such as design flowrate, capacity, load factor were estimated and discussed for surveyed sites in Dan-yang and feasibility was suggested through analyzing the investment, unit cost and payback period.

  • PDF

Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose (농업용 보를 이용한 소수력발전소의 타당성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF

The Analysis of Regional Economic Feasibility of GHGs Reduction Technology in the Paddy Rice (논 물관리 방식에 따른 온실가스 감축기술의 지역별 경제성 분석)

  • Lee, Sang-Ho;Park, Woo-Kyun
    • Korean Journal of Organic Agriculture
    • /
    • v.23 no.3
    • /
    • pp.455-467
    • /
    • 2015
  • This study analyzed the regional economic feasibility of greenhouse gases (GHGs) reduction technology in paddy rice. Firstly, the impact of GHGs reduction technology on productivity, emission reduction, and costs is different from region to region. Secondly, the water irrigation system contributes to productivity, GHGs reduction, and water reduction, but the profit of paddy rice will decrease because of increase in fixed costs and variable costs. Thirdly, the economic feasibility shows that water-savings plot has a 1.41 in a benefit-cost ratio.

Economic Feasibility of Common Utility Tunnel based on Cost-Benefit Analysis (비용편익 분석에 기초한 공동구의 경제적 타당성 평가)

  • Kang, Yeong Ku;Choi, Ik Chang
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.29-36
    • /
    • 2015
  • Common utility tunnel is essential to the daily lives of people underground utilities (electricity, gas and supply facilities such as water, communication facilities, sewer facilities, etc.) to improve the appearance by co-acceptance and disaster prevention, important for the conservation of the city's population was concentrated road construction the city-based facilities. There is recognition of the importance of the various supply treatment facilities in common utility tunnel as infrastructure to accommodate joint according to the city expanded, the demand for infrastructure. In this paper, a cost-benefit analysis using a one-time occurrence, without simply relying on cost or current cost, project manager for the city-dimensional feasibility study conducted, the user level of the maintenance costs and user costs, including social costs items from various angles can be investigated and proposed a mechanism of economic feasibility common utility tunnel. Evaluation of the proposed technique is cost-benefit and cost caused by installing common utility tunnel the existing pipeline area - was investigated by the benefit analysis, extended and repeated common utility tunnel installation depends much affected by the excavation, so users of reducing the number of repeat excavation convenience can be seen that this occurs.

Reassessment of Economic Feasibility for a Wind Farm on Jeju Island Considering Variable Jeju SMP (변동 제주 SMP를 적용한 제주도 육상풍력단지의 경제성 재평가)

  • Kim, Hyo-Jeong;Ko, Kyung-Nam;Huh, Jong-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.5
    • /
    • pp.41-50
    • /
    • 2013
  • Economic feasibility study using weighted average variable Jeju System Marginal Price, SMP, was conducted for Gasiri wind farm of Jeju Island. To predict the variable Jeju SMP, generator share ratio for SMP was calculated from the real time wind power production and the power demand data for years. Also, sensitivity analysis on Net Present Value, NPV, and Benefit/Cost Ratio, B/C ratio, were performed to clarify which factors are more important in assessing economic feasibility. The result shows that the Gasiri wind farm has a minimum of 110 billion won and a maximum of 132 billion won difference between fixed and variable SMP. Also, Capacity Factor, C.F., had the highest sensitivity for NPV, followed by SMP. Accordingly, when economic analysis for a potential wind farm site is carried out, the variable SMP as well as C.F. should be considered for more accurate assessment of the wind farm.

Economic Analysis of Insulation Wall Panel System using LCC Method (LCC기법을 활용한 단열외벽패널시스템의 경제성분석)

  • Kim, Min-Woo;Jeon, Kyu-Nam;Lee, Gun-Cheol;Cho, Byoung-Young;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.153-155
    • /
    • 2011
  • In this study, an insulation panel system that has the most excellent economic feasibility in a long term LCC viewpoint in some analysis, which determine a proper insulation panel construction method for the out wall of structures, is analyzed. As a result, in the case of a deterministic LCC analysis, the initial investment cost represents about 80,000Won/㎡ for extrusion ceramic panels. Also, although the costs of maintenance, disassembling, and disposal show no large differences compared with other panel systems, metal panels indicate a bit higher than other panel systems about 1.5 times. In the probability density function that analyzes the variation of the probabilistic cost between panel systems and its economic feasibility, metal panels show the highest cost distribution and extrusion and stone panels represent low cost distributions. In the cumulative function distribution that composites probability density functions, the extrusion ceramic panel represents the most excellent economic feasibility and reliability and that is also the most superior subject among the subjects used in this study.

  • PDF

Financial Analysis and Validity Study for the Introduction of Liquid Hydrogen in Changwon City (창원시 액화수소 도입에 따른 재무성 분석 및 타당성 검토)

  • KANG, BOO MIN;JEONG, CHANG-HOON;HA, SEUNG WOO;JIN, HONG-DEOK;KIM, HAK-MIN;JEONG, DAE-WOON
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.33 no.4
    • /
    • pp.293-300
    • /
    • 2022
  • The Changwon city which announced 2040 hydrogen policy vision is planning to establish the new hydrogen-centered city. The building of plant which is available to produce the 5 ton/day of liquid hydrogen is promoted as one of the projects in order to achieve the vision. However, the analysis in terms of local economic and environmental aspects is insufficient because this liquid hydrogen plant is the first in Korea. Therefore, in this study, the financial feasibility of the liquid hydrogen plant project was analyzed by reviewing the benefits of liquid hydrogen supply and environmental improvement, and the feasibility of this project has been investigated which is being built based on the hydrogen industrial plan of Changwon city.