• 제목/요약/키워드: facility safety management

검색결과 706건 처리시간 0.026초

철도종합안전심사 결과 분석을 통한 효율적 심사방안 연구 (A Study on the Method Improvement of the Integrated Railway Safety Audit System through the Analysis of Results)

  • 송보영;송병호;오인택
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2503-2516
    • /
    • 2011
  • According to Railway Safety Act, Korea Transportation Safety Authority (KOTSA) has been entrusted with 'Integrated Railroad Safety Audit (IRSA) and has implemented the safety audit to the railroad operation agencies such as Korea Railroad (KORAIL) and the railroad facility management organization such as the Korea Rail Network Authority (KR Network). The target of IRSA is to establish the effective rail safety management system and to raise the safety level of the railroad operation and facility agencies by checking synthetically their performance of safety duties with sincerity according to the Railway Safety Act. Even though newly introduced IRSA is conducted smoothly, it is necessary to study the methodology and criteria of the state's safety audit system. The purpose of this paper is to improve the efficiency of IRSA by the comparative research between IRSA and other similar safety audit system and to establish the consecutive improvement concept of IRSA. Second purpose is to confirm the effectiveness of IRSA by the analysis of the relationship between audit results and the safety level of the rail operation agencies.

  • PDF

유해화학물 취급 중소기업 시설 관리실태 현황 및 개선방안 (Case Study of Safety Management at Small Industry Handling Hazardous Chemicals)

  • 송은희;이동훈;조영호;곽동호;박교식
    • 한국가스학회지
    • /
    • 제21권4호
    • /
    • pp.21-29
    • /
    • 2017
  • 유해화학물을 취급하는 중소규모의 사업장에 대하여 시설을 세부점검하였으며 이를 정리하였다. 점검결과는 크게 공정, 저장소, 작업자 및 기타 사항으로 구분하여 현황 및 문제점을 정리하고 이에 대한 세부적인 개선방안을 제시하였다. 전반적으로 법규를 만족하기만 하면 된다는 인식하에 최소한의 요구조건만을 갖추어 놓고 있었으며 이에 대한 지속적인 관리가 미흡한 것으로 결론되었다.

철도차량 실대형 화재안전 성능평가 장치 설계 (Design of the Full-Scale Fire Safety Evaluation Facility for Railroad Vehicle Fire)

  • 유용호;김흥열
    • 한국화재소방학회:학술대회논문집
    • /
    • 한국화재소방학회 2008년도 춘계학술논문발표회 논문집
    • /
    • pp.222-225
    • /
    • 2008
  • To prove a lot of technical difficulties related to the safety management of a railroad fire effectively, we design for the full-scale fire test facility of the railroad vehicle. It will be consist of major 3 part - duct system with smoke cleaning system, measuring section and gas analysis system. The CFD simulation was also carried out to design of the hood and duct system optimization. The results will be help for basic research of the railroad fire safety.

  • PDF

제3종시설물 지정을 위한 실태조사 체크리스트 개선방안 (Propose an Improvement of Checklist for Actual Condition Survey for Designation of Class-lll Facilitie)

  • 윤지호;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.100-101
    • /
    • 2021
  • Facilities with high risk of a disaster or requiring continuous safety management are designated as class-III facility. In order to designate a class-III facility, it is evaluated based on the safety status of the facility, the risk to the building users, and the number of years elapsed of the facility, etc. and this shall be referred to the actual condition survey for the designation of a class-III facility. In the actual condition survey conducted to designate the safety status is calculated by the checklist based on the evaluation scores consisting of five stages each item, and is evaluated in three stages by 'good', 'careful observation', and 'designated review' through the average of the combined scores. Currently, the actual condition survey being conducted applies only structural stability, and the risk factors such as damage to the finish, the risk of cracking, and the type and weight of major structures are not included in the checklist for the actual condition survey, so even if experts think it is dangerous, scores cannot be reflected. Therefore, this study aims to analyze the problems of checklist of the actual condition survey for the designation of class-III facility and to propose an improvement plan for the checklist for the actual condition survey.

  • PDF

의료기관 인증제도에서 요구되는 건축계획요소에 관한 연구 - 국내 의료기관인증제도, JCI 병원인증기준을 중심으로 - (A Study on the Elements of Architectural Planning Required in Healthcare Accreditation - Focused on Korea Healthcare Accreditation, JCI Hospitals Standard -)

  • 김의현;양내원
    • 한국실내디자인학회논문집
    • /
    • 제21권2호
    • /
    • pp.223-230
    • /
    • 2012
  • These days, hospitals in Korea have great interests in healthcare accreditation. The criteria of this accreditation has been established by management, but development of the management system without facility improvement has limits. Therefore this study reclassified domestic and foreign healthcare accreditation focusing on facilities and has purpose on proposing facility elements that can be adopted in hospitals. Also, the study is relevant to the study on architecture planning of hospital according to 'Patient safety' which will be suggested in the future and has significance for establishing basis of healthcare facility planning and for improving the existing facilities. The study selected facility lists from 'healthcare accreditation' and reclassified them based on departments in the hospital. Using these lists, the study divided the hospital that has obtained 'healthcare accreditation' into departments and investigated and analyzed them. On the basis of the analysis, the study suggested facility lists involved in hand washing, waste disposal, equipment washing, quarantine, goods-movement, establishing clean/polluted area, emergency exit-way, and restricted zone.

  • PDF

슬러지 소각시설 악취 및 환기에 관한 연구 (A Study on the Odor and Ventilation in Sludge Incineration Facilities)

  • 서병석;전용한
    • 대한안전경영과학회지
    • /
    • 제22권2호
    • /
    • pp.7-13
    • /
    • 2020
  • Sludge incineration facilities are socially recognized as a hate facility. Therefore, a careful deodorization plan must be established. Therefore, the incineration facility must conduct research on odor ventilation. In this study, a odor diffusion simulation in an incineration facility was conducted and analyzed. In particular, research was carried out on carry-in rooms, pre-treatment rooms, and storage facilities for crops, which are expected to rapidly spread odor. As a result, ammonia 1.62, hydrogen sulfide 0.63, and acetaldehyde 0.73 were found in the transfer room. In addition, pretreatment rooms and stencil storage facilities were found to be lower than regulatory standards.

부실 정밀점검 및 정밀안전진단의 국가적 손실비용 추정 (Estimation of National Loss Expenses to Insufficient Safety Inspection and Precision Safety Diagnosis)

  • 하명호;박종섭
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제14권6호
    • /
    • pp.246-253
    • /
    • 2010
  • 시설물의 안전관리에 관한 특별법이 1995년 제정된 이후 정밀점검 및 정밀안전진단을 실시하여 국가의 주요시설물의 안전 확보에 기여해 왔다. 그러나 관리주체의 안전등급 판정 개입, 안전진단전문기관의 저가수주, 진단기술력 부족 등으로 점검 진단의 실효성에 관한 의문이 꾸준히 제기되어 왔다. 이에 평가제도가 도입되어 부실 점검 진단 방지로서 역할과 기능을 하고 있지만, 앞으로 부실 점검 진단비율을 더 이상 낮아지기 힘들다는 의견이 대두되고 있다. 따라서 현행 평가제도와 부실 점검 진단비율에 대한 현황 분석을 실시하고, 부실 점검 진단으로 인한 국가적 손실비용을 추정함으로서 현행 평가제도 개선의 필요성과 당위성을 제시하고자 하였다.

Development of Repair and Replacement Cost Management System for Public Buildings to Establish Accurate Facility Management Budgets

  • Choi, Min-Chan;Lee, Chun-Kyong;Jung, Tae-Gab;Park, Tae-Keun
    • Architectural research
    • /
    • 제14권2호
    • /
    • pp.75-83
    • /
    • 2012
  • Buildings that are more than 10 years old generally have considerable repair and replacement costs due to the rapid deterioration of their systems. For public buildings in particular, which have national and social significance, considerable effort is required not only to ensure a long life cycle and safety but also to minimize the overall public expense. Along with increasing repair and replacement requirements, however, there have been problems related to the establishment of an accurate facility management budget. To address these concerns, a repair and replacement cost management system was constructed. This system manages both invested maintenance and forecast costs to establish a reasonable repair and replacement planning process and budget. The effectiveness of the system was verified through a pilot test targeting one of public Corporation (K).

Modeling and analysis of selected organization for economic cooperation and development PKL-3 station blackout experiments using TRACE

  • Mukin, Roman;Clifford, Ivor;Zerkak, Omar;Ferroukhi, Hakim
    • Nuclear Engineering and Technology
    • /
    • 제50권3호
    • /
    • pp.356-367
    • /
    • 2018
  • A series of tests dedicated to station blackout (SBO) accident scenarios have been recently performed at the $Prim{\ddot{a}}rkreislauf-Versuchsanlage$ (primary coolant loop test facility; PKL) facility in the framework of the OECD/NEA PKL-3 project. These investigations address current safety issues related to beyond design basis accident transients with significant core heat up. This work presents a detailed analysis using the best estimate thermal-hydraulic code TRACE (v5.0 Patch4) of different SBO scenarios conducted at the PKL facility; failures of high- and low-pressure safety injection systems together with steam generator (SG) feedwater supply are considered, thus calling for adequate accident management actions and timely implementation of alternative emergency cooling procedures to prevent core meltdown. The presented analysis evaluates the capability of the applied TRACE model of the PKL facility to correctly capture the sequences of events in the different SBO scenarios, namely the SBO tests H2.1, H2.2 run 1 and H2.2 run 2, including symmetric or asymmetric secondary side depressurization, primary side depressurization, accumulator (ACC) injection in the cold legs and secondary side feeding with mobile pump and/or primary side emergency core coolant injection from the fuel pool cooling pump. This study is focused specifically on the prediction of the core exit temperature, which drives the execution of the most relevant accident management actions. This work presents, in particular, the key improvements made to the TRACE model that helped to improve the code predictions, including the modeling of dynamical heat losses, the nodalization of SGs' heat exchanger tubes and the ACCs. Another relevant aspect of this work is to evaluate how well the model simulations of the three different scenarios qualitatively and quantitatively capture the trends and results exhibited by the actual experiments. For instance, how the number of SGs considered for secondary side depressurization affects the heat transfer from primary side; how the discharge capacity of the pressurizer relief valve affects the dynamics of the transient; how ACC initial pressure and nitrogen release affect the grace time between ACC injection and subsequent core heat up; and how well the alternative feeding modes of the secondary and/or primary side with mobile injection pumps affect core quenching and ensure stable long-term core cooling under controlled boiling conditions.

수소운송설비 안전성 강화 방안 고찰 (A Study on the Safety Enhancement of Hydrogen Tube Trailer)

  • 박우일;김영훈;이인우;강승규
    • 한국가스학회지
    • /
    • 제26권6호
    • /
    • pp.59-64
    • /
    • 2022
  • 현재 수소운송설비는 2022년 10월 말 기준 787대가 운행 중이며, Type 1 이음매 없는 용기에 최대 200 bar의 압력으로 1회 최대 340 kg을 운송한다. 현재 안전관리체계 및 설비관리는 양호한 상태이나, 안전성 강화를 위해 제도 및 설비 구조개선이 필요한 실정이다. 이에 따라, 본 논문은 수소에너지 활성화 정책에 의해 수소운송설비 보급·운영의 확대 과정 중 지난 2021년 12월 28일 대전-당진간 고속도로에서 발생한 사고사례를 모사 및 해석을 진행하였으며, 사고 분석 및 해석 결과에 따라 수소운송설비의 안전성 향상 방안에 대해 제언하였다.