• 제목/요약/키워드: facilities project management

검색결과 489건 처리시간 0.03초

스마트 물관리 시스템과 WASCO 사업을 통한 공군기지 노후 상수도 개선사업의 실증 연구 (A Study to improve old water supply facilities in Airforce Base through the Smart Water management vs WASCO Project)

  • 박성수;김창은
    • 대한안전경영과학회지
    • /
    • 제22권4호
    • /
    • pp.53-64
    • /
    • 2020
  • The purpose of this study is to analyze outcome of the project to improve old water supply facilities in Airforce Base to improve water revenue rate. To achieve the objective of this study, First, literature review is conducted to clearly define the concept of water revenue rate improve project. Second, WASCO project on 2 Airforce base review and smart water management pilot project on 1 Airforce base is conducted. Third, economical analysis of project is conducted to examine the outcome. As a result, WASCO and smart water management pilot project on Airforce base was effective to improve water revenue rate. Finally, the improvements were suggested after investigating the key factors on water revenue rate improve project. In the future, this study will be used as a baseline for developing water revenue rate improve project.

Quality-based performance comparison of design-build and design-bid-build project delivery methods for warehouses and self-storage facilities

  • Vivek SHARMA;Vijaya Ravi Prasanth REDDI;Abdul Sohail MOHAMMED;Jong Han YOON
    • 국제학술발표논문집
    • /
    • The 10th International Conference on Construction Engineering and Project Management
    • /
    • pp.753-760
    • /
    • 2024
  • Warehouses and Self-Storage facilities are essential for e-commerce operations, providing inventory, distribution, and delivery space. As per the Bureau of Labor Statistics, the number of warehousing and storage businesses in the United States increased from 15,152 in 2010 to 20,002 in 2021, showing continuous growth over the decade. Given the recent surge, there is a need to better understand the impact of these delivery methods on the quality metrics of these facilities. This study aims to contrast the measure of quantitative quality performance of design-build (DB) versus traditional design-bid-build (DBB) project delivery methods (PDM) for warehouses and self-storage facilities. This research conducted a literature review to document quality metrics to compare DBB and DB on project performance. ANOVA was conducted to compare the significant difference between the means to compare the performance between delivery methods and project outcomes across these critical areas. With these insights, owners can make informed strategic decisions about selecting the optimal PDM for future storage facility projects based on their unique quality and scope management objectives.

A STUDY ON CULTURAL PRACTICES IN CONSTRUCTION CONTRACTING ORGANIZATIONS IN MALAYSIA

  • H. Abdul-Rahman;Wang Chen;Halimatun. Othman
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-178
    • /
    • 2007
  • This paper has investigated the cultural practices influencing business performance and integrity in selected Malaysian contractors and has discussed culture related issues to improve the management of cultural capitals in the Malaysian construction industry. Issues of current enterprise culture and applicable cultural practices, leadership styles, enterprise axiology and integrity, cultural practices and loyalty, and identification of organizational culture are discussed during the semi-structured interviews and questionnaire survey. Conclusions has been drawn that the people oriented and task oriented management style have a similar quantity of supporters in Malaysian contractors. The integrity and profit are respectively identified as the enterprise axiology in the ethical and economic perspective. The monkey culture is considered as the most applicable type for the cultural practice and the current enterprise cultures applied in the Malaysian contractors are mostly positive to both the organizations and society.

  • PDF

CASE STUDY OF THE NATIONAL STADIUM: RISKS AND OPPORTUNITIES IN CHINA'S PPP IMPLEMENTATIONS IN MAJOR SPORTS FACILITIES

  • Xinyi Song;Wei Liang;Carlos A. Arboleda;Shouqing Wang;Feniosky Pena-Mora
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.474-479
    • /
    • 2011
  • With Beijing's success in bidding for the 2008 Olympic Games, the increasing demand for infrastructure development and reduced public sector funding capacity has created a significant funding gap which calls for alternative project delivery methods such as Public-Private Partnership (PPP). Although the exploration of infrastructure projects using PPP model have been practiced since the late 80s, the $560 million National Stadium which served as the main venue for the Olympic Games is the first stadium project in China to be delivered under PPP operation. The project is generally considered successful despite the concession transfer in 2009 with concern of better serving the public interest. Compared to other infrastructure projects such as transportation, waste management and water management, the development of major sports facilities for mega-sports events with PPP has its own unique features and is subject to different major risks. This research identifies and analyzes critical risks in the implementation of PPP in major sports facility development through case study of the National Stadium project. A questionnaire survey and several interviews are conducted to solicit expert opinions from experienced practitioners. The purpose is to provide additional insights in risk management strategies and opportunities in China's PPP implementations in major sports facilities for policy makers and private sectors involved with investment decisions in future similar infrastructure development.

  • PDF

지방자치단체의 범용프로그램 도입 및 활용방안에 관한 연구 (A Study on the Introduction and Application of the Standardized Management Software for Local Government)

  • 홍상기;신동빈;안종욱
    • 대한공간정보학회지
    • /
    • 제12권3호
    • /
    • pp.3-12
    • /
    • 2004
  • 시설물관리시스템은 지자체에 도입된 보편적인 GIS활용체계라 할 수 있다. 지난 몇 년간 많은 지자체에서 시설물관리시스템을 개발하였는데 특히 상 하수도의 도로관리시스템 부분에 치중하였다. 여기에 도입된 시설물관리 범용프로그램의 개념은 지자체간의 개발업무에 있어 중복을 최소화하는 것이다. 최근 지자체에서는 분야별로 정보화의 한계를 인식하고 도시정보체계 구축으로 관심을 돌리고 있다. 따라서 본 연구에서는 지자체에서 도시정보체계를 구축할 수 있도록 지원하기 위한 범용프로그램의 활용가능성을 제시하고자 한다. 이렇게 함으로써 도시정보체계 구축에 있어 중복투자의 방지, 프로젝트 시간단축, 실패가능성의 최소화와 정보프로젝트의 활성화가 기대된다.

  • PDF

농촌 고령자 공동시설지원 시범사업 주민만족도 조사 연구 (A Study on the Inhabitant's Satisfaction of Community Facilities Demonstration Project for Rural Elderly)

  • 김진환;박중신;송서호
    • 한국농촌건축학회논문집
    • /
    • 제17권4호
    • /
    • pp.9-16
    • /
    • 2015
  • This study examined the current conditions of the community facilities constructed by demonstration project for rural elderly that were promoted for the last two years by the ministry of agriculture, food and rural affairs. The type of community facilities are community living home, community food service facility and small bath house. And it was accomplished satisfaction survey for analyzing the effects of demonstration project focused on inhabitants and users of community facilities constructed by demonstration project. The results are as follows. First, The satisfaction index of community facilities was evaluated high level in generally. Second, Inhabitants and users of facilities were presented high level satisfaction in humanity sector, especially. Third, It should be to establish maintenance and management plan such as supporting of linkage program and operation cost for secure the sustainability. Consequently, the implementation of community facilities demonstration project to improve the living conditions of rural elderly is entirely appropriate. The results of this study were considered to promoting demonstration project for improving quality of the facilities and securing effectiveness of the project.

교육시설 유지관리 수준에 관한 전문가 의식조사 연구 (A Study on the Survey of the Experts' Consciousness as to the Level in Maintenance Management of Educational Facilities)

  • 정영한
    • KIEAE Journal
    • /
    • 제8권6호
    • /
    • pp.57-62
    • /
    • 2008
  • In case of the BTL Project for current educational faculties, the proper standards to analyze those said educational standards lack, so it is very difficult to conduct an exact analysis and those improper standards are problematic when proper management and maintenance costs are calculated. In case of such educational facilities, as students have to use them safely for a long time and the quantity of their activities and the status of their physical growth based on individual classes, as well as the features for use by facility and the regional characteristics are different, other standards for maintenance and management must be considered unlike an apartment house. Thus, in this study, to set up the standards considering the features of educational facilities, the maintenance and management level suitable for educational facilities is presented by comparing and analysing that required to maintain and manage an apartment house, targeting the experts specializing management of educational facilities.

INCIDENT FREQUENCY AND SEVERITY FOR CONSTRUCTION FACILITIES

  • Jong-Hyun Park;Jae-Su Jeong;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.234-240
    • /
    • 2011
  • Preventing incidents occurred in construction process is important for safe implementation of construction projects. Due to the complexity and magnitude of the project and moreover, poor safe planning and management, construction incidents in Korea have been increasing. Reducing construction incidents effectively, appropriate safety management program in consideration of the incident rate of each facility is to be adapted. This study analyzes incident frequency and severity rate of each facility based on the data of construction sites(about 1,560 thousand cases) recorded by Korea Occupational Safety & Health Agency for 3 years from 2007 to 2009, and the incident related data (about 40 thousand cases) of Korea Workers' Compensation & Welfare Service. The results of this study revealed that construction incident rates of 'cold refrigeration storage facilities' are the highest among building types, followed by traditional building religious building, arcade department store and shopping center. In case of other facilities, the incident rate and the rate of intensity of 'pipelining project' are the highest, followed by 'tunneling project'. These results would be used in providing safety programs beneficial for preventing construction incidents.

  • PDF

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

모델기반 시스템엔지니어링 접근을 통한 철도안전시험설비구축사업 요건관리 체계 (Requirement Management System of the Constructing Railway Safety Test Facilities adopting the Model-Based Systems Engineering)

  • 김윤미;최경진;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.382-387
    • /
    • 2009
  • Requirement management is an important phase that has a significant influence on the project success. As a risk to a project fail is getting bigger, people adopt Systems Engineering method to the development of the effective requirement management. Accordingly, Railroad Safety Technology R&D Corps. is progressing the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective requirement management methods with Systems Engineering techniques. To support that, we introduce the Systems Engineering Requirement Management Process and propose the more effectual management method of constructing the Railway Safety Test Facilities applying the model-based systems engineering tool to the research.

  • PDF