• Title/Summary/Keyword: expressway type

Search Result 108, Processing Time 0.027 seconds

A Study on Performance Criteria of Asphalt Pavements for Development of Performance-based Warranty Specification (성능보증 시방서 개발을 위한 아스팔트 포장 성능기준 연구)

  • Yeo, Hyun Dong;Nam, Jeong Hee;Suh, Young Chan;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.793-801
    • /
    • 2011
  • Existing specifications of road pavement require contractors to meet only materials and construction conditions regardless of pavement life. There are limitation of developing road pavement technology and possibility causing dispute between ordering organization and contractor with this type of specification. Research efforts to introduce performance warranty contracting are in progress in the field of road pavement to improve the problems. The performance warranty contracting gives the contractors opportunity to select materials and construction methods as they like. But they should satisfy a certain level of performance during a given period. The performance indicator and threshold value of pavement which are main elements of the warranty specification should be defined first to introduce the performance warranty contracting successfully. In this study, the performance indicator, threshold value, and warranty duration of asphalt pavement were investigated by reviewing literatures on performance warranty contracting of some states of the US. Major distresses influencing the performance of the asphalt pavement were investigated at 24 national expressway lines and national highway lines in 16 regions, and the data were analyzed to be compared to the cases of the US. Development of rational performance warranty specification for domestic asphalt pavement is expected based on the research results.

The Development of Neural Network Model to Improve the Reliability of the Demand/Effort Model for Evaluating Highway Safety (도로위험도를 평가하는 요구/노력모형의 신뢰도 향상을 위한 신경망 모형 개발)

  • Jeong, Bong-Jo;Gang, Jae-Su;Jang, Myeong-Sun
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.2
    • /
    • pp.95-105
    • /
    • 2009
  • Traffic accidents on highways are likely to happen when there is an imbalance in the complex relationships among key elements such as road geometries, driver related factors, and mechanical performances. The Demand-Effort Model (DEM), which evaluates highway safety, can be explained by the imbalance, which occurs when the level of demand of the driver's attention to the road environment exceeds that of the response from the driver. This study suggests a new model that improves the reliability of the current DEM through the reinterpretation on the physiological signals with the help of the Neural Network Model (NNM). The data were collected from 149 subjects, who drove a test vehicle on the Yongdong, Honam, and Seohaean Expressways in Korea. Three important results could be drawn from the recursive tests as follows; (1) Only 5 out of 10 parameters on the physiological signals which are currently used were proven to be meaningful through the Normality Test, Cluster Analysis, and Mann-Whitney Analysis. (2) The revised DEM, which internally uses the NNM, showed more reliable results than existing DEM. Group 1, which is based on the new DEM showed 80.0% of accuracy in measuring the level of driver's efforts, however, that of Group 2 based on the current DEM was 74.3%. (3) Field tests on the Honam Expressway showed lower 'type II error' with the new DEM (40.5%) than the old DEM (58.8%). The DEM is designed as a quick and easy way to determine highway safety prior to the minute road safety audit (RSA) by a professional audit team. Then a new DEM, which is based on the NNM, needs to be considered since it showed higher reliability and lower error.

Estimation of VMS Traffic Information Value Using Contingent Valuation Method (조건부 가치측정법을 활용한 VMS 교통정보 가치 추정)

  • Choi, Jung Yoon;Yu, Jeong Whon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.3
    • /
    • pp.42-52
    • /
    • 2013
  • In this study, value of VMS (Variable Message Sign) traffic information is estimated by using CVM (Contingent Valuation Method), which is developed to quantify the value of non-marketable goods in environmental economics. CVM is used to estimate the value of goods provided by a project under consideration and then the project feasibility can be indirectly examined on the basis of the estimated value. This study focuses on estimating to estimate value of traffic information provided through VMS, a part of the transportation system enhancement project by Korea Expressway Corporation which is aimed at mitigating traffic problems on expressways. In particular, this study analyzes value of information separately by trip purpose, information type, and traffic flow condition. A state preference survey was designed to estimate the value of non-marketable traffic information. To maximize reliability of the survey results, a pilot survey was taken before the main survey. The open-ended question method was adopted in capturing users' willingness-to-pay. Both Tobit and binary Probit models were applied in estimating the value of VMS traffic information and their parameters were estimated using the maximum likelihood estimation. The estimation results suggests that the value of traffic information perceived by users is 518.28 KRW.

The Experimental Study on Transverse Field Joint Method of Precast Road Deck Slab of Double Deck Tunnel in Great Depth (대심도 복층터널 프리캐스트 중간슬래브의 횡방향 현장이음방식에 대한 실험연구)

  • Lee, Doo-Sung;Kim, Bo-Yeon;Bae, Chul-Gi;Hur, Jae-Hun
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.23-32
    • /
    • 2017
  • The joints between precast PSC slabs of the intermediate road slab in double deck tunnel are inevitably generated in the road traffic vehicle traveling direction. Therefore, it is important to make the behavior of parts on the joint in one piece. The imtermediate road slab system of double deck tunnel in great depth proposed in this study will be constructed with precast PSC slab in order to minimize the construction period. And the joint connection between the precast slab has been developed in two methods: the 'Transverse tendon reinforcement method' and 'High strength bolts connection method'. Also, the experiments were performed for the full scale model in order to evaluate the performance of the intermediate road deck slab with two type joints systems, the structural stability was verified through the F.E.M analsysis. The results of static loading test and F.E.M analysis investigated a very stable behavior of intermediate road deck slab in double deck tunnel applying the joint methods developed in this study, in the cracks and deflections to satisfy the design standards of Highway Roads Bridges (2011), it was determined that there is no problem even servicebility.

Geotechnical Engineering Progress with the Incheon Bridge Project

  • Cho, Sung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.133-144
    • /
    • 2009
  • Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.

  • PDF

A Study on Estimating of Probability Distribution and Mean Life of Bridge Member for Effective Maintenance of the Bdrige (효율적인 고속도로 교량의 유지관리를 위한 교량 부재별 수명분포 및 평균수명 산정 방안 연구)

  • Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.57-65
    • /
    • 2016
  • This study found a proper parametric life distribution based on maintenance history data of each bridge member under the jurisdiction of the Korea Expressway Corporation for the past 10 years by introducing the concept of reliability and suggested a measure to calculate the mean life and reliability of each bridge member using the parameter obtained with the maximum-likelihood classification. As a result of analyzing the exponential distribution, weibull distribution and log normal distribution being utilized frequently in order to find the parametric life distribution type which well described the life data of each bridge member, it was found that the log normal distribution and weibull distribution described the characteristics of the relevant life data the best. As a result of calculating the mean life of each bridge member based on the estimated parameter, the average life of the steel bridge coating was 18.51 years which was the longest, followed by the bridge deck as 17.56 years. The mean life of the drainage facility and the bridge bearing were 12.27 years and 12.57 years respectively, showing the shortest life.

A Study on Pullout Stability according to Abutment Shape of True Mechanicaaly Stabilized Earth Wall Abutment (순수형 보강토교대의 교대 형상에 따른 인발 안정성 검토)

  • Shin, Keun-Sik;Han, Heui-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.594-601
    • /
    • 2019
  • A true MSEW abutment is an abutment type that directly supports the load of a superstructure. Metal strips, which are in-extensile reinforcements, should be used to minimize abutment deformation. A study to derive the application conditions of a True MSEW abutment was carried out by Zevogolis(2007). As a result, the pullout factor of safety of the uppermost reinforcement was estimated to be the smallest. Therefore, the pullout factor of safety of the uppermost reinforcement is the most important design factor. Parameter analysis was conducted with the abutment length, abutment heel, and abutment height as variables. The pullout factor of safety increased with increasing abutment length and abutment heel length. This is because the contact area increases and the superstructure is dispersed as the abutment length and abutment heel length increase. The pullout factor of safety converges at an abutment length of 1.2m and an abutment heel length of 0.9m. This is because the effective length of the reinforcement is reduced due to the increase in contact area. On the other hand, the extension of the superstructure will increase if the abutment length and abutment heel length are increased excessively. In addition, earth-volume is increased if the abutment height increases excessively. This acts as an upper load on the MSE wall. Therefore, it needs to be examined carefully.

Analysis of Weathering Sensitivity by Swelling of Domestic Highway Sites (국내 고속도로현장의 스웰링에 의한 풍화민감도 분석)

  • Jang, Seokmyung;Han, Heuisoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.3
    • /
    • pp.15-22
    • /
    • 2022
  • This study aims to observe the swelling representative rocks in Korea and to suggest improvements in the use of test methods and prior analysis in relation to the weathering of rocks. The swelling test and analysis were performed on the drilling cores obtained for the ground investigation at the domestic highway construction site. For the method of determining the absorption expansion index of rocks, the method proposed in "Standard Methods for Sample Collection and Specimen Preparation" of ISRM and Korean Rock Engineers Standard Rock Test Method was used. The specimen for the measurement of the expansion displacement was cylindrical with a height of 10 cm and a diameter of 5 cm. The existing swelling analysis method evaluates the sensitivity to weathering by using the maximum expansion displacement, but since the classification by bedrock grade is unclear, it is reasonable to use the rate of change of the expansion displacement according to the immersion time. It is necessary to conduct an experiment to distinguish between weathering and fault deterioration. In addition, long-term weathering prediction technology for each cancer type is needed through the expansion displacement analysis of the chemical weathering stage.

Analysis on the Rigid Connections of the Drilled Shaft with the Cap for Multiple Pile Foundations (현장타설말뚝을 적용한 다주식 기초에서 말뚝과 캡의 강결합에 대한 분석)

  • Cho, Sung-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.7
    • /
    • pp.61-73
    • /
    • 2008
  • Piles of a bridge pier are connected with the column through the pile cap (footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. Connection methods between pile heads and the pile cap are divided into two groups : rigid connections and hinge connections. Domestic design code has been specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However, some specifications prescribe that conservative results through investigations of both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which has high-quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) is unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the large diameter drilled shaft and the pile cap for Incheon Bridge which will be the longest bridge of Korea were investigated through the full modeling for rigid connection conditions.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.