• Title/Summary/Keyword: explosives demolition

Search Result 75, Processing Time 0.024 seconds

A Case Study on Explosive Demolition of Boiler Building of Steel Frame Structure (보일러동 철골구조물 발파해체 시공사례)

  • Park, Hoon;Nam, Sung-Woo;Noh, You-Song;Suk, Chul-Gi
    • Explosives and Blasting
    • /
    • v.40 no.3
    • /
    • pp.66-76
    • /
    • 2022
  • Recently, the demand for the dismantling of old industrial complexes has been increasing, and the construction of restoring the dismantled industries to their original natural environment is underway. In this case, the felling method was applied to the explosive demolition method to dismantle a large steel frame structure in an old industrial complex. We used a charging container to cut the steel frame structure that generates a metal jet. The thickness of the thick steel structure in the blasting section was controlled by gouging which a method of digging deep groove by gas and oxygen flame or arc thermal. As a result of the explosive demolition, the steel frame structure collapsed precisely according to the estimated direction. The explosive demolition was completed without causing any damage to the surrounding facilities.

Blast Design for Explosive Demolition of Concrete Foundation (기초콘크리트 구조물의 발파해체를 위한 발파설계)

  • Park, Hoon;Park, Hyoung-Ki;Suk, Chul-Gi;Yi, Young-Seop;Kaneko, Katsuhiko
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.9-16
    • /
    • 2012
  • With the deterioration and functional loss of structures, there is an increasing demand for demolition and various demolition technologies have been developed. In case of a large-scale concrete foundation, application of some mechanical demolition techniques is limited because of the structural characteristics, and explosive demolition or explosive demolition combined with mechanical demolition is applied recently due to the effect to the surrounding environment by the ground vibration. In this study, we compared peak particle velocity of ground vibration depending on average fragment size in case of explosive demolition design for large-scale concrete foundation using the relation among specific charge, charge constant and transmitting medium constant as well as the relation between average concrete fragment size and specific charge.

A Case Study on Blasting Demolition Method of Structure (구조물 발파해체 공법 시공사례 연구)

  • 한동훈;안명석;공병승;이윤재;류창하
    • Explosives and Blasting
    • /
    • v.21 no.3
    • /
    • pp.49-60
    • /
    • 2003
  • Nowadays it is tendency to make a remodelling or demolition of old structures with the rapid development of blasting technique. In this treatise it is arranged of improvement procedure of blasting demolition method in korea which was begun since August 1991. Recently, the blasting demolition method has much merits with 60-70% reduction effect of construction period than mechanical demolition method. and so that it has much economical points specially over than 5 storied high buildings. In order to maximalize economical effects of the blasting demolition method, environment safety and recycling, it must be needed. at first to develop the estimating programs against vibration, noise, flying stones, and dust. Also it is required to take a responsibility for using recycling materials after blasting demolition of old structures, and to be invested to advance the blasting demolition techniques.

Application of Advanced Blast Demolition Simulation Method to the Drill and Blast Design for Demolishing Cylindrical Structures (원통형 구조물의 발파해체설계에 대한 최신 발파해체 시뮬레이션 기법의 적용)

  • Park, Hoon;Suk, Chul-Gi;Kim, Seung-Kon
    • Explosives and Blasting
    • /
    • v.26 no.1
    • /
    • pp.7-14
    • /
    • 2008
  • In order to complete successfully the demolition of a silo structure by means of felling method, structural properties and the geometric design of blast mouth have to be considered. In this study, a commercial software, 3-dimensional applied element analysis (3D AEM), was used to investigate the effect of the geometrical parameters of blast mouth on the collapse behavior of the silo structure.

An Evaluation of Cutting Performance for Cutting Structural Steel using Charging Container (장약용기를 이용한 강재 절단 성능 평가)

  • Park, Hoon;Noh, You-Song;Suk, Chul-Gi
    • Explosives and Blasting
    • /
    • v.38 no.2
    • /
    • pp.13-21
    • /
    • 2020
  • The shaped charge was used in explosive demolition of a steel frame structure, but it was often not used because it was limited to use and impossible to supply at domestic and overseas. Existing linear shaped charge did not have sufficient cutting performance to cut steel frame structures with a huge scale and thick steel plate. To solve these problems, we produced a device that could generate metal jets using industrial explosives of high detonation velocity and pressure. In this study, we made a charging container of three types which applicable to explosive demolition of steel frame structures. The experiment of cutting performances was carried out to evaluate the effect of cutting of charging containers on the various thicknesses of the H-beam and steel plate. As a result of the experiment, sufficient cutting performance was confirmed.

A Case Study on Blast Demolition Work of a Pier Structure (교각구조물 발파해체 시공사례)

  • Park, Keun-Soon;Lee, Joon-Seok;Park, Sang-Soo
    • Explosives and Blasting
    • /
    • v.25 no.2
    • /
    • pp.47-60
    • /
    • 2007
  • The blast demolition technology has been used to demolish various industrial facilities and tall buildings since 1950s in the advanced countries such as USA and U.K. It is now considered as one of safe demolition methods in the above countries. In Korea, several companies have tried to introduce blast demolition technology in the early days of the 1990s. However, this technology is still at the beginning stage and not fully adopted due to situation of avoiding technology transfer by overseas technical tie-up companies, lack of objects to be demolished and low level recognition on blast demolition. This technology shall be considered as a cutting edge technology to be applicable to demolition of skyscrapers, various industrial structures and factory buildings in the near future. Blast demolition of a pier structure was carried out under the site condition where there were already the constructed 2 pier structures of up and down line which had safety problems in an expressway construction project. The pier structures need to be demolished and reconstructed for a short period of time in consideration of the construction work process to be followed.

A Prospect of Explosives Demolition Based on Comparative Analysis of Demolition Cost. (해체공사비 비교분석을 통한 발파해체 공법의 전망)

  • Cho Tae-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.130-138
    • /
    • 2004
  • The demolition works of high building in korea are expecting to increase rapidly in the near future, and its general demolition methods can be divided into mechanical demolition method and explosive demolition method. The selection of the right demolition method relies on many variable elements according to environmental and geographical elements. But, generally, the most important element of those is a economical profit. Accordingly, This study estimates each demolition cost dividing into mechanical demolition method and explosive demolition method of high building in city. And the estimating of the demolition cost makes it possible to do comparative analysis for the economical efficiency of each method more objectively than any other selective elements. Also, the analysis for the economical efficiency helps to forecast the activated time of the explosive demolition method in domestic.

A Study for Felling Impact Vibration Prediction from Blasting Demolition (발파해체시 낙하충격진동 예측에 관한 연구)

  • 임대규;임영기
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.43-55
    • /
    • 2004
  • Use term of tower style construction exceeds recently. Accordingly, according to construction safety diagnosis result, achieve removal or Improvement construction. But when work removal, must shorten shut down time. Therefore, removal method of construction to use blasting demolition of construction is very profitable. Influence construction and equipment by blasting vibration and occurrence vibration caused by felling impact. Is using disadvantageous machine removal method of construction by and economic performance by effect of such vibartion. Therefore, this research studied techniques to forecast vibartion level happened at blasting demolition and vibration reduction techniques by use a scaled model test.