• Title/Summary/Keyword: existing building

Search Result 2,989, Processing Time 0.031 seconds

AUTOMATIC AS-IS BIM EXTRACTION FOR SUSTAINABLE SIMULATION OF BUILT ENVIRONMENTS

  • Chao Wang;Yong K. Cho
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.47-51
    • /
    • 2013
  • Existing buildings now represent the greatest opportunity to improve building energy efficiency. Building performance analysis is becoming increasingly important because decision makers can have a better visualization of their building's performance and quickly make the solution for improving building energy efficiency and reducing environmental impacts. Nowadays, building information models (BIMs) have been widely created during the design phase of new buildings, and it can be easily imported to third party software to conduct various analyses. However, a BIM is not always available for all existing buildings. Even if a BIM is available during the design and construction phases, it is very challenging to keep updating it while a building is aged. A manual process to create or update a BIM is very time consuming and labor intensive. A laser scanning technology has been a popular tool to create as-is BIM. However it still needs labor-intensive manual processes to create a BIM out of point clouds. This paper introduces automatic as-is simplified BIM creation from point clouds for energy simulations. A framework of decision support system that can assist decision makers on retrofits for existing buildings is introduced as well. A case study on a residential house was tested in this study to validate the proposed framework, and the technical feasibility of the developed system was positively demonstrated.

  • PDF

CFT seismic reinforcement method using diaphragm pre-assembled ㄷ-shaped column (다이어프램 선 조립 ㄷ형태 기둥을 이용한 CFT내진보강공법)

  • Woo, Jong-Yeol;Shin, Seung-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.151-152
    • /
    • 2022
  • When reinforcing an existing building with the Concrete Filled Tube(CFT) structure, it is impossible to form a diaphragm inside with the existing method. Therefore, in this study, a construction method was proposed so that the internal diaphragm could be welded on four sides by using a slot to transmit force.

  • PDF

CFT seismic reinforcement method using double diaphragm (2중 다이어프램을 이용한 CFT내진보강공법)

  • Woo, Jong-Yeol;Shin, Seung-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.153-154
    • /
    • 2022
  • When reinforcing an existing building with the Concrete Filled Tube(CFT) structure, it is impossible to form a diaphragm inside with the existing method. Therefore, in this study, a construction method was proposed so that the force could be transmitted using the friction force between the diaphragm and the concrete using a double diaphragm.

  • PDF

A Study on the Additional Properties Management Method for Building Code Automated Checking by BIM (건축인허가 법규에 따른 BIM 정보 관리 방안 연구 )

  • Kim, Byung-Joo;Kim, Gyu-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.211-212
    • /
    • 2023
  • Building Information Modeling (BIM) design has been mandatory in Korea since 2016, and it has been gradually expanding in the industry, with a slow attempt to apply it in remodeling constructions. This is because Korea is facing a situation where many buildings are over 30 years old and require remodeling or reconstruction. The remodeling industry is also a growing market, as it saves construction time and cost compared to reconstruction. BIM is an ideal technology element for a competitive remodeling construction, as remodeling constructions face a complicated construction process from the start, including demolition, maintenance, and reinforcement to save the change process. However, there are still limitations in applying BIM to remodeling constructions, due to considerations of the existing building and the complicated requests of the inhabitants. BIM still has technical and environmental limitations for general use. In this study, I analyzed BIM application cases from existing studies and suggest what improvement points should be strengthened.

  • PDF

Evaluation of Seismic Margin of Existing Steel Structure Based on Seismic Margin Assessment (내진여유도평가법에 근거한 기존 강구조물의 내진성능평가)

  • 황규호;송정국;강선구;서용표
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2002.03a
    • /
    • pp.239-249
    • /
    • 2002
  • The Turbine Building of nuclear power plant is classified as non safety-related structure. During the operation, there may be possibility the original licensing basis would be changed, which makes non safety-related structure safety-related. Such a change in regulation requires utility to perform seismic qualification for the existing structure and their facilities. Thus it is meaningful to evaluate seismic margin of the existing non-qualified building structure. In addition, in this paper it is shown that a modification to the structure can enhance their seismic capacity.

  • PDF

Efficiency of Energy Performance Improvement by Retrofit in existing Buildings (기존 건축물의 리트로핏에 따른 에너지 성능개선 효과 분석)

  • Kim, Dong-Hee;Moon, Hyunseok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.126-127
    • /
    • 2016
  • The Korean government has developed and strengthened energy related regulations to pursue eco-friendly buildings since 1979. However, required design standards for energy based quantitative studies focused on energy performance in existing buildings are meagered. Therefore in this study, required energy performance by design standards for energy are analyzed. And a energy performance by retrofits for insulation improvement is studied using energy simulations.

  • PDF

Seismic vulnerability assessment of composite reinforced concrete-masonry building

  • Remki, Mustapha;kehila, Fouad;Bechtoula, Hakim;Bourzam, Abdelkrim
    • Earthquakes and Structures
    • /
    • v.11 no.2
    • /
    • pp.371-386
    • /
    • 2016
  • During the last decades, many destructive earthquakes occurred in Algeria, particularly in the northern part of the country (Chlef (1980), Constantine (1985), Tipaza (1989), Mascara (1994), Ain-Benian (1996), Ain Temouchent (1999), Beni Ourtilane (2000), and recently $Boumerd{\acute{e}}s$ (2003), causing enormous losses in human lives, buildings and equipments. In order to reduce this risk and avoid serious damages to the strategic existing buildings, the authorities of the country, aware of this risk and in order to have the necessary elements that let them to know and estimate the potential losses in advance, with an acceptable error, and to take the necessary countermeasures, decided to invest into seismic upgrade, strengthening and retrofitting of those buildings. To do so, seismic vulnerability study of this category of buildings has been considered. Structural analysis is performed based on the site investigation (inspection of the building, collecting data, materials characteristics, general conditions of the building, etc.), and existing drawings (architectural plans, structural design, etc.). The aim of these seismic vulnerability studies is to develop guidelines and a methodology for rehabilitation of existing buildings. This paper presents the methodology, based on non linear and seismic analysis of existing buildings, followed in this study and summarizes the vulnerability assessment and strengthening of one of the strategic buildings according to the new Algerian code RPA 99/version 2003. As a direct application of this methodology, both, static equivalent method and non linear dynamic analysis, of composite concrete masonry existing building in the city of "CONSTANTINE", located in the east side of ALGERIA, are presented in this paper.

Stepwise Technique for Improving Building Energy Efficiency Rating Utilizing Quantified Simulation Model (정량화 시뮬레이션 모델을 활용한 단계적인 건축물에너지효율등급 향상 방안)

  • Kim, Gi-Seok;Kim, You-Min;Kim, Jong-Seung;Oh, Se-Gyu
    • KIEAE Journal
    • /
    • v.14 no.6
    • /
    • pp.65-73
    • /
    • 2014
  • Due to the Climate change and resource shortage by global warming, various problems are rising and getting worse around the world. Many countries are doing the considerable efforts to reduce greenhouse gas emissions. The government of South Korea also plans to decrease greenhouse gas emission, the various pilot projects are underway, which includes obligation of energy efficiency 1st rating and greenhouse gas target management system of public buildings. In particular, luxurious government office buildings and energy-wasting public building have issued and emerged as a social problem. Energy efficiency improvement of the existing public office buildings are becoming an important issue recently. This study is proposed the step-by-step energy improvement model according to the building energy efficiency rate in order to reduce the energy consumption. To attain this end, I set up a base model by analyzing the current architectural conditions of the existing public office buildings and grasped the specific properties of building energy consumption through energy simulations. Furthermore, I suggested phased reduction prototypes for the reduction target of energy consumption by applying the methods of the zero energy building plan. This study is expecting that prototypes would give directions when it comes to planning the implementation policy of phased building plan factors, according the building energy consumption reduction goal in the existing public office buildings which are the subject of building energy target management system.

A Study on Configuration of Small Wind Turbines for Maximum Capacity of Wind Power Systems Interconnected With a Building (빌딩 내 최대 풍력발전설비 연계를 위한 소형풍력발전원 구성에 관한 연구)

  • Lee, Yeo-Jin;Kim, Sung-Yul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.4
    • /
    • pp.605-612
    • /
    • 2017
  • One of the biggest environmental issues that our world has been facing is climate change. In order to cope with such environmental issues, the world is putting a great deal of effort into energy conservation. The building sector, in particular, consumes 36% of the energy consumed worldwide and emits considerable amount of greenhouse gases. Therefore, introduction of renewable energies in the building sector is highly recommended. Renewable energy sources that can be utilized in the building sector include sunlight, solar heat, geothermal heat, fuel cells and wind power. The wind power generation system which converts wind energy into electrical energy has advantages in that wind is an unlimited and pollution-free resource. It is suitable to be connected to existing buildings because many years of operational experience and the enhanced stability of the system have made it possible to downsize the electrical generator. In case of existing buildings, it is necessary to consider the live loads of the buildings to connect the wind power generation system. This paper, through the connection of the wind power generation with existing buildings, promotes reduction of greenhouse gas emissions and energy independence by reducing energy consumption in the building sector. In order to connect the wind power generation system with an exciting building, the live load of the building and the area of the rooftop should be considered. The installable model is selected by comparing the live load of the building and the load of the wind power generation system. The maximum number of the wind turbines that can be installed is obtained by considering the separation distance between the wind turbines within the area of the rooftop. Installations are divided into single installations and multiple installations of two different types of wind turbines. After determining the maximum installable number, the optimal model that can achieve the maximum annual power generation will be selected by comparing the respective total annual amount of the power generation of different models.

Displacement of Sand Layer during Deep Excavation (깊은 굴착에 따른 사질토 지반의 변형)

  • 유태성;신종호
    • Geotechnical Engineering
    • /
    • v.1 no.2
    • /
    • pp.81-92
    • /
    • 1985
  • Braced excavation for a new building was carried out at a very close proximity of an existing tall building of T.hick columns are supported by indict.ideal spread footings on sand layer The excavation was planned to reach far below the footing level of the existing building. To assess the foundation performance and stability of the existing building, the behavior of 9round subjected to loss of confinement from excavation was analytically studied using finite element method. Field instrumentation was also conducted to monitor the actual ground responses during excavation. Based on these studies, various remedial measures weere taken to minimize the adverse effects to the building, and excavation was successfully completed. This paper presents the results from the analytical studies and field monitoring, and measured and measured responses at different stages of excavation.

  • PDF