Ground support performance in deep underground mine with large anisotropic deformation using calibrated numerical simulation (case of mine-H)

  • Hu, Bo;Sharifzadeh, Mostafa;Feng, Xia-Ting;Talebi, Roo;Lou, Jin-Fu
    • Geomechanics and Engineering
    • /
    • v.21 no.6
    • /
    • pp.551-564
    • /
    • 2020
  • High-stress and complex geological conditions impose great challenges to maintain excavation stability during deep underground mining. In this research, large anisotropic deformation and its management by support system at a deep underground mine in Western Australia were simulated through three-dimensional finite-difference model. The ubiquitous-joint model was used and calibrated in FLAC3D to reproduce the deformation and failure characteristics of the excavation based on the field monitoring results. After modeling verification, the roles of mining depth also the intercept angle between excavation axis and foliation orientation on the deformation and damage were studied. Based on the results, quantitative relationships between key factors and damage classifications were presented, which can be used as an engineering tool. Subsequently, the performance of support system installation sequences was simulated and compared at four different scenarios. The results show that, first surface support and then reinforcement installation can obtain a better controlling effect. Finally, the influence of bolt spacing and ring spacing were also discussed. The outcomes obtained in this research may play a meaningful reference for facing the challenges in thin-bedded or foliated ground conditions.

A Study on the Self-contained Earth Retaining Wall Method Using Bracing (브레이싱을 이용한 자립식 흙막이 공법에 관한 연구)

  • Kim, Jong-Gil
    • Journal of Digital Convergence
    • /
    • v.17 no.3
    • /
    • pp.205-213
    • /
    • 2019
  • In a construction site, excavation work has a close relation with temporary earth retaining structure. In order to build the underground structure most effectively in a narrow space, prevent soil relaxation of the external behind ground in excavation work, and maintain a ground water level, it is required to install a temporary earth retaining structure that secures safety. To prevent soil washoff in underground excavation work, the conventional method of temporary earth retaining structure is to make a temporary wall and build the internal support with the use of earth anchor, raker, and struct for excavation work. RSB method that improves the problem of the conventional method is to remove the internal support, make use of two-row soldier piles and bracing, and thereby to resist earth pressure independently for underground excavation. This study revealed that through the field application cases of RSB method and the measurement result, the applicability of the method for installing a temporary earth retaining structure, the assessment result, and displacement all met allowable values of measurement, and that the RSB method, compared to the conventional method, improved constructability and economy.

Numerical Investigation on the Behavior of Braced Excavation Supported by Steel Pipe Struts (강관버팀보 흙막이 시스템의 거동 특성에 관한 수치해석적 연구)

  • Yoo, Chung-Sik;Na, Seung-Min;Lee, Jong-Goo;Jang, Dong-Wook
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.6
    • /
    • pp.45-56
    • /
    • 2010
  • This paper presents the results of a numerical investigation on the behavior of deep excavation wall system supported by steel pipe struts. A series of three-dimensional finite element analyses were carried out on a braced excavation case which adopted steel pipe struts. The results indicated that the mechanical behavior of the steel pipe supported braced excavation is comparable to that of a conventional H-pile supported excavation, although the steel pipe supported system allows a larger longitudinal spacing than the conventional H-pile strut system. Also shown is that the sectional stresses of the steel pipe support system are within the allowable values. This implies that the steel pipe support system can be effectively used as an alternative to conventional H-pile support system.

A study on the effect of support structure of steel rib in partitioning excavation of tunnel (터널 상·하반 분할 굴착 시 강지보재 지지구조 효과에 대한 연구)

  • Kim, Ki-Hyun;Kim, Yeon-Deok;Hwang, Beoung-Hyeon;Choi, Yong-Kyu;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.5
    • /
    • pp.543-561
    • /
    • 2020
  • This paper is the result of the study on the effect of the support structure of the tunnel steel rib. In tunnel excavation, the top and bottom half excavation methods result in subsidence of steel rib reinforcement due to insufficient support of steel rib reinforcement when the ground is poor after excavation. The foundation of the steel rib installed in the upper half excavates the bottom part of the base, causing the subsidence to occur due to various effects such as internal load and lateral pressure. As a result, the tunnel is difficult to maintain and its safety is problematic. To solve these problems, steel rib support structures have been developed. For the purpose of verification, the behavior of the supporting structure is verified by model experiments reduced to shotcrete and steel rib material similarity, the numerical analysis of ΔP and ΔP generated by bottom excavation by Terzaghi theoretical equation. As a result, it was found that the support structure of 20.100~198.423 kN is required for the 10~40 m section of the depth for each soil of weathered soil~soft rock. In addition, as a result of the reduced model experiment, a fixed level of 50% steel rib deposit of steel rib support structure was installed. The study shows that the installation of steel rib support structures will compensate for uncertainties and various problems during construction. It is also thought that the installation of steel rib support structure will have many effects such as stability, economy, and air reduction.

Behavior and Application of Jacket pack anchor in Soft ground (연약지반상에 자켓팩앵커의 적용과 거동특성)

  • Kim, Tae-Seob;Cho, Yoon-Ju;Jung, Chang-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1065-1072
    • /
    • 2010
  • The excavation site in the new city of inchon songdo is distributed with soft reclaimed soil and marine deposit. So, the general ground anchor is not applied to this layer of soft ground as the earth retaining support system, because of settlement. And then, Jacket pack anchor which is newly developed in order to increasing the pullout resistance by certain grout bulb formation and expansion effect in soft ground is applied to this site instead of the general ground anchor. Though the maximum horizontal displacement shows about 30mm~100mm (The maximum horizontal displacement/excavation depth$\fallingdotseq$0.32~1.0%) according to excavation sequence, generally excavation work finished stably. Also, load cell after setting shows almost increasing trend with increasing horizontal displacement. It means that the settlement of Jacket pack anchor in soft ground is good. From the result of this case, we knew that Jacket pack anchor was able to use the earth retaining support system in soft ground. Using Jacket pack anchor in soft ground, The allowance of the horizontal displacement is applied more than general value considering soil factors.

  • PDF

Case Study of Damage Behavior in Urban Excavation (도심지 흙막이 굴착시 손상거동에 대한 대책공법사례)

  • Kim, Man-Ha;Chae, Young-Su;Kim, Hak-Moon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.330-335
    • /
    • 2005
  • Reliable predictions of the movement of earth retaining structures and the ground adjacent to braced walls in urban excavation are often difficult due to many variable factors. The ground settlement and the damage of adjacent structures in urban excavation has been an important issue. Therefore, the stability of the adjacent structures must be secured with the excavation support and research on the protection of adjacent structure is necessary. This study showed a countermeasure method for case of damage behavior in urban excavation.

  • PDF

Decision Support Tool for Excavation Operation using Genetic Algorithms

  • Lee, Ung-Kyun;Kang, Kyung-In;Cho, Hun-Hee
    • Architectural research
    • /
    • v.8 no.2
    • /
    • pp.43-48
    • /
    • 2006
  • The appropriate fleet estimation of the excavation equipment is a major factor in the determination of the cost and time requirements of a project. But the decision of what kind of equipment selected is often based on heuristic methods or trial and error in Korea. Thus, this study proposes a prototype model that uses genetic algorithms to select fleet estimation of loaders (backhoe) and trucks used in excavation work. To verify the applicability of this model, the case study was performed. And the result of the genetic model was compared with that of the trial & error method. The use of the genetic model suggested this study required 44days, 2 units of backhoes, 7 units of trucks, and a total cost of 171,839,756 won. With the estimated fleet number of equipment, the minimum cost of excavation work can be calculated, taking account of the time-cost trade-off. By utilizing this prototype model, the efficiency of excavation work can be improved.

Study on Structural Stability Analysis of Excavation Stage Considering Excavation Process and Supporting Materials in Room-and-Pillar Underground Space (격자형 지하공간에서 굴착 공정과 지보재를 고려한 굴착 단계별 구조 안정성 해석 연구)

  • Soon-Wook, Choi;Soo-Ho, Chang;Tae-Ho, Kang;Chulho, Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.4
    • /
    • pp.21-29
    • /
    • 2022
  • The room-and-pillar method or grid-type underground space is a method of forming a space by excavating the excavation part at regular intervals so that it is orthogonal and using natural rock mass as a structure. Such excavation may appear different in size from the excavation stage where the maximum displacement occurs depending on the excavation direction and sequence. In this study, considering the installation of support materials such as shotcrete and rock bolts for the optimal design of the excavation process, the safety and constructability of the design and construction of the grid-type underground space under specific ground conditions were analytically reviewed. The ground conditions were set using an numerical method, and the stress at pillar and displacement at center of room were considered for each excavation stage and construction type under a constant surcharge. The height of the space was 8m, which was set higher than the size of a general office, and was reviewed in consideration of equipment and plant facilities. In addition, the degree of displacement control according to the installation of support materials was reviewed in consideration of shotcrete and rock bolts.

Stability of the Innovative Prestressed wale System Applied in Urban Excavation (도심지 굴착에 적용된 IPS 띠장의 안정성)

  • Kim, Nak-Kyung;Park, Jong-Sik;Jang, Ho-Joon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.2
    • /
    • pp.225-235
    • /
    • 2005
  • The stability of innovative prestressed wale system applied in urban excavation was investigated. The IPS is a wale system prestressed by tension of steel wires. The IPS consists of steel wires, H-beam support and wale. The IPS provides a high flexural stiffness to resist the bending moment caused by earth pressures. And the IPS transmits earth pressures due to excavation to corner struts. The IPS provides a larger spacing of support, economical benefit, construction easiness, good performance and safety control. This paper explains basic concept and mechanism of the IPS and presents the measured performances of the IPS applied in urban excavation. In order to investigate applicability and stability of the IPS in urban excavation, observations and measurements in site were performed. The IPS applied in urban excavation was performed successfully. The results of the field instrumentation were presented. The measured performances of the IPS were investigated. And behavior of the wall and corner struts was investigated.

A Study on the Evaluation of Necessity for the Support in Case of Excavartion of the Transport Drift at Danyang Site (단양지역의 운방갱도 굴착시 갱도 지보의 필요성 판정에 관한 연구)

  • 이종욱;조만섭;김일중;김영석
    • Tunnel and Underground Space
    • /
    • v.3 no.1
    • /
    • pp.54-62
    • /
    • 1993
  • In order to evaluate the necessity for the support during the excavation of the transport drift and use the data for design applications, laboratory testings of mechanical properties of rock samples and engineering rock mass classifications on this study site were performed. The values of RMR and Q-system are 68 and 11.8, respectively. Since these results were evaluated as good, this rock mass were determined to be unsupported. Full face excavation method was determined to be suitable for excavating this drift. In case of excavation, smooth blasting techniques must be carried out at the wall rock and the crown. However, considering the blast vibration etc. that have an effect on the surrounding rock mass, approximately less than 9kg of explosive charges per blast should be maintained.

  • PDF