• Title/Summary/Keyword: excavation speed

Search Result 94, Processing Time 0.029 seconds

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

A Study on behavior of Slope Failure Using Field Excavation Experiment (현장 굴착 실험을 통한 사면붕괴 거동 연구)

  • Park, Sung-Yong;Jung, Hee-Don;Kim, Young-Ju;Kim, Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.5
    • /
    • pp.101-108
    • /
    • 2017
  • Recently, the occurrence of landslides has been increasing over the years due to the extreme weather event. Developments of landslides monitoring technology that reduce damage caused by landslide are urgently needed. Therefore, in this study, a strain ratio sensor was developed to predict the ground behavior during the slope failure, and the change in surface ground displacement was observed as slope failed on the field model experiment. As a result, in the slope failure, the ground displacement process increases the risk of collapse as the inverse displacement approaches zero. It is closely related to the prediction of precursor. In all cases, increase in displacement and reverse speed of inverse displacement with time was observed during the slope failure, and it is very important event for monitoring collapse phenomenon of risky slopes. In the future, it can be used as disaster prevention technology to contribute in reduction of landslide damage and activation of measurement industry.

Dynamic response characteristics of crossing tunnels under heavy-haul train loads

  • Dong, Jie;Zhong, Shuai;Wang, Hai-long;Wu, Zhi-hui
    • Geomechanics and Engineering
    • /
    • v.20 no.2
    • /
    • pp.103-112
    • /
    • 2020
  • The dynamic response of crossing tunnels under heavy-haul train loads is still not fully understood. In this study, based on the case of a high-speed tunnel underneath an existing heavy-haul railway tunnel, a model experiment was performed to research the dynamic response characteristics of crossing tunnels. It is found that the under-crossing changes the dynamic response of the existing tunnel and surrounding rock. The acceleration response of the existing tunnel enhances, and the dynamic stress of rock mass between crossing tunnels decreases after the excavation. Both tunneling and the excitation of heavy-haul train loads stretch the tunnel base, and the maximum tensile strain is 18.35 µε in this model test. Then, the measured results were validated by numerical simulation. Also, a parametric study was performed to discuss the influence of the relative position between crossing tunnels and the advanced support on the dynamic behavior of the existing tunnel, where an amplifying coefficient of tunnel vibration was introduced to describe the change in acceleration due to tunneling. These results reveal the dynamic amplifying phenomenon of the existing tunnel during the new tunnel construction, which can be referred in the dynamic design of crossing tunnels.

Development of Arm Insulator for Self-Build Based Emergency Tower (긴급복구용 자주조립식 철주 절연암 개발)

  • Min, Byeong-Wook;Wi, Hwa-Bog;Park, Jae-Ung;Lee, Cheol-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.107-108
    • /
    • 2007
  • Overhead transmission lines are completely exposed to the environment. This causes faults in transmission lines due to natural environmental conditions. In some cases, transmission towers are damaged by typhoons and snow, as well as sleet on the transmission lines. It takes a lot of time to repair the damaged towers. For emergency restoration purposes, steel poles are installed to temporarily supply power. Before 2003, emergency restoration steel poles were made of angled steel, which required a large number of beams, bolts, etc. In addition, the foundation of the steel pole and ground wire was constructed using excavation and burial methods, therefore it required a lot of manpower and time to construct temporary transmission lines. In September 2003, typhoon Maemi, whose maximum wind speed was 60m/s, hit Korea. 'Maemi' destroyed transmission lines in the Busan and Geojea area, causing long blackouts. To reduce the recovery time to the damaged transmission lines, self-build based emergency towers were developed. self-build based emergency towers reduced recovery time from 24 hours to 4 hours or less. However, the self-build based emergency tower had no arms, so the temporary transmission lines could only be constructed without curves in line routes. In this paper, solving these self-build based emergency tower limitations, using insulated arms(designed for use with the self-build based emergency tower), shall be explained.

  • PDF

Deformation analyses during subway shield excavation considering stiffness influences of underground structures

  • Zhang, Zhi-guo;Zhao, Qi-hua;Zhang, Meng-xi
    • Geomechanics and Engineering
    • /
    • v.11 no.1
    • /
    • pp.117-139
    • /
    • 2016
  • Previous studies for soil movements induced by tunneling have primarily focused on the free soil displacements. However, the stiffness of existing structures is expected to alter tunneling-induced ground movements, the sheltering influences for underground structures should be included. Furthermore, minimal attention has been given to the settings for the shield machine's operation parameters during the process of tunnels crossing above and below existing tunnels. Based on the Shanghai railway project, the soil movements induced by an earth pressure balance (EPB) shield considering the sheltering effects of existing tunnels are presented by the simplified theoretical method, the three-dimensional finite element (3D FE) simulation method, and the in-situ monitoring method. The deformation prediction of existing tunnels during complex traversing process is also presented. In addition, the deformation controlling safety measurements are carried out simultaneously to obtain the settings for the shield propulsion parameters, including earth pressure for cutting open, synchronized grouting, propulsion speed, and cutter head torque. It appears that the sheltering effects of underground structures have a great influence on ground movements caused by tunneling. The error obtained by the previous simplified methods based on the free soil displacements cannot be dismissed when encountering many existing structures.

A case study of large - long tunnel using the charging mechanization system of the bulk emulsion explosives (Bulk Emulsion 기계화 장전시스템을 이용한 대단면 장대터널 시공사례연구)

  • Yoon, Ji-Sun;Jang, Young-Min;Lee, Sang-Hun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.107-115
    • /
    • 2009
  • Lately, the length of tunnel, the number of large-long tunnel over three lanes are steeply increased because of the request for high speed and straight road. Therefore, the maximization of excavation efficiency is needed in tunnel construction. Bulk Emulsion explosives charging system is the spearhead equipment using the radio remote control $&$ mechanization system compare with a traditional method Cartridge type. This study introduced the bulk emulsion explosives which is new method in tunnel blasting and verified the efficiency of bulk emulsion explosives for long-large tunnel. And we tried to compare Cartridge type efficiency with bulk emulsion explosives efficiency by the field test.

Numerical Analysis of EPB TBM Driving using Coupled DEM-FDM Part I : Modeling (개별요소법과 유한차분법 연계 해석을 이용한 EPB TBM 굴진해석 Part I : 모델링)

  • Choi, Soon-wook;Lee, Hyobum;Choi, Hangseok;Chang, Soo-Ho;Kang, Tae-Ho;Lee, Chulho
    • Tunnel and Underground Space
    • /
    • v.30 no.5
    • /
    • pp.484-495
    • /
    • 2020
  • To numerically simulate the advance of EPB TBM, various type of numerical analysis methods have been adopted including discrete element method (DEM), finite element method (FEM), and finite difference method (FDM). In this paper, an EPB TBM driving model was proposed by using coupled DEM-FDM. In the numerical model, DEM was applied in the TBM excavation area, and contact properties of particles were calibrated by a series of triaxial tests. Since the ground around the excavation area was coupled with FDM, the horizontal stress considering the coefficient of earth pressure at rest could be applied. Also, the number of required particles was reduced and the efficiency of the analysis was increased. The proposed model can control the advance rate and rotational speed of the cutter head and screw conveyor, and derive the torque, thrust force, chamber pressure, and discharging during TBM tunnelling.

Development of disc cutter wear sensor prototype and its verification for ensuring construction safety of utility cable tunnels (전력구 터널 건설안전 확보를 위한 디스크커터 마모측정시스템 시작품 개발 및 성능검증)

  • Jung Joo Kim;Hee Hwan Ryu;Seung Woo Song;Seung Chul Do;Ji Yun Lee;Ho Young Jeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.2
    • /
    • pp.91-111
    • /
    • 2024
  • Most of utility cable tunnels are constructed utilizing shield TBM as part of the underground transmission line project. The TBM chamber is the only space inside the tunnel that encounters rock and soil, and is the place with the highest frequency of accident exposure, such as collapse and collision accidents. Since there is currently no way to measure the disc cutter wear from outside the chamber, frequent inspection by workers is essential. Accordingly, in this study, in order to prevent safety accidents inside the TBM chamber and expect the effect of shortening the construction period by reducing the number of chamber openings, the concept of disk cutter wear measurement technology was established and a prototype was produced. By considering prior technology and determining that magnetic sensors are most suitable for the excavation environment, wear measurement sensor package were developed integrating magnetic sensors, wireless communication modules, power supply, external casing, and monitoring systems. To verify the performance of the prototype in an actual excavation environment, a full-scale tunnelling test was performed using a 3.6 m EPB shield TBM. Based on the full-scale tests, five prototypes were operated normally among eight prototypes. It was analyzed that sensor measurement, wireless communication, and durability performance were secured within a maximum thrust of 3,000 kN and a rotation speed of 1.5 RPM.

Lateral Load Test on the Bar-type Anti-buoyancy Anchors in the Weathered Rock (풍화암에 시공된 Bar Type 부력앵커의 수평재하시험)

  • Park, Chan-Duk;Lee, Kyu-Hwan;Ryu, Nam-Jae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.165-174
    • /
    • 2004
  • This study is about a horizontal load test of buoyance anchor installed in the section where underground water level happens in the depth of 5m under the ground when the ground is excavated, because the section as a excavation section of high speed railway ${\bigcirc}{\bigcirc}$ station is near a rivers and because the section always has a reservoir of full water level on the left. Therefore, in this study we will appraise the long-term stability of the structure permanently being taken buoyance by the underground water level, through the spot test of the buoyance anchor installed in the section where underground water level happens. For that, Bar Type anchor is used, which can get enough pulling-out force by a method to resist buoyance by using friction force against the ground by high strength steel rod or steel wire. Anti-buoyance anchor is installed on the bottom slab of underground structure being taken horizontal force by the braking and accelerating of high speed train. And, It is aimed to analyze and grasp the review result of stability for the horizontal force that happens at the parking and stopping of high speed train, by executing horizontal load test for the grasping of the movements characteristic of buoyance anchor.

A study on the clogging of shield TBM cutterhead opening area according to the characteristics of cohesive soil content (점성토 함량 특성에 따른 shield TBM cutterhead 개구부의 폐색현상에 관한 연구)

  • Bang, Gyu-Min;Kim, Yeon-Deok;Hwang, Beoung-Hyeon;Cho, Sung-Woo;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.4
    • /
    • pp.265-280
    • /
    • 2021
  • Population density due to urbanization is making people interested in underground space development and much interest in TBM construction with low vibration and noise. This led to a lot of research on TBM. However, research on the characteristics of the cutterhead opening of the TBM equipment being occluded under the ground conditions under which it is excavated is insufficient. Accordingly, a study was conducted to investigate clogging of the cutterhead opening during the shield TBM rolling. To identify the clogging of cutterhead openings in SHIELD TBM equipment, the reduced model experiment was divided into clay rate (10%, 30%, 50%, 60%), cutterhead opening rate (30%, 50%, 60%), and cutterhead rotation direction (one-way, two-way) and rotational speed (3 RPM) and conducted in 36 cases. Results of scale model test on shield TBM clogging, it was analyzed that the ground condition containing clay soil increased the clogging effect in both directions than the unidirectional rotation, and that the lower the rotational speed of the cutterhead, the less the clogging effect. Accordingly, the direction of cutterhead rotation, rotational speed and opening rate are calculated by taking into account ground conditions during ground excavation, the clogging effect can be reduced. It is believed to be effective in saving air as the clogging effect is reduced. Therefore, this study is expected to be an important material for domestic use of shield TBM.