• Title/Summary/Keyword: excavation method

Search Result 1,056, Processing Time 0.027 seconds

A Stability Case on the Deep Rock Excavation Site in Urban Area by Automatic Monitoring System (도심지 대심도 암반굴착공사에서의 자동계측 활용에 의한 붕괴방지 사례)

  • Kim, Tae-Seob;Jo, Nam-Shin;Jung, Chang-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1433-1437
    • /
    • 2010
  • The deep excavation work in Korean downtown is almost excuted near by existing structures and utility lines because of the diminution of available yard for construction. So, it was required more and more that the accurate control of displacement on the earth retaining system for minimizing the popular complaint and the damage from constructional accident. Automatic monitoring system is adopted in fracture zone for real time monitoring. In addition, Face mapping is carried out on the face of fracture zone according to excavation sequence. As the result of automatic monitoring system and face mapping, we was able to take the necessary reinforcement and changing excavation method within suitable time. This paper is informed about a stability case on the deep rock excavation site with fracture zone in urban area by automatic monitoring system.

  • PDF

Decision Support Tool for Excavation Operation using Genetic Algorithms

  • Lee, Ung-Kyun;Kang, Kyung-In;Cho, Hun-Hee
    • Architectural research
    • /
    • v.8 no.2
    • /
    • pp.43-48
    • /
    • 2006
  • The appropriate fleet estimation of the excavation equipment is a major factor in the determination of the cost and time requirements of a project. But the decision of what kind of equipment selected is often based on heuristic methods or trial and error in Korea. Thus, this study proposes a prototype model that uses genetic algorithms to select fleet estimation of loaders (backhoe) and trucks used in excavation work. To verify the applicability of this model, the case study was performed. And the result of the genetic model was compared with that of the trial & error method. The use of the genetic model suggested this study required 44days, 2 units of backhoes, 7 units of trucks, and a total cost of 171,839,756 won. With the estimated fleet number of equipment, the minimum cost of excavation work can be calculated, taking account of the time-cost trade-off. By utilizing this prototype model, the efficiency of excavation work can be improved.

Earth Pressures on Box Culvert Induced by Excavation Geometry (되채움(굴착)의 형상에 따라 매설박스에 유발되는 토압)

  • 정성교;윤치관
    • Geotechnical Engineering
    • /
    • v.12 no.5
    • /
    • pp.27-40
    • /
    • 1996
  • Box culvert has long since been used for various purposes , water and sewerage works, communication and electricity facilities, subway, railway, etc. In urban area, the construetion of box culvert generally consists of excavation-installation of the culvert-backfill. However, the existing design methods for earth pressure on the box culvert do not take into account the excavation(or backfill) geometry. ' A new method considering excavation geometry for earth pressure on box culvert is suggested here. The lateral earth pressures by the newly suggested method agree relatively with results of finite element analyses, but those of existing method are greatly overestimated. The vertical pressure on the top of the box culvert by the new method is similar to those of existing method and finite element analysis. However, the reactional pressure on the bottom of the box culvert depends largely upon the stiffness of the foundation soil. The reactional pressure by the new method agrees well with that of finite element analysis, only when the stiffness is low. From the finite element analysis it is shown that the lateral earth pressure on box culvert depends upon the excavated slope (G) and the net bottom distance (Bc).

  • PDF

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (대심도 풍화대층에서 NATM 터널의 지반거동 및 보강방법)

  • Chun, Byung-Sik;Song, Seung-Hoon;An, Jung-Whan
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.87-95
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analyses of failure rate and vertical stress ratio show that the tunnel for which the height of the cover (H) was higher than four times the diameter, can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than that obtained by Ring-cut split method. In addition, the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

Excavation Support Design and Stability Analysis of Shallow Tunnel in Heavily Fractured Rock Mass (연약 파쇄 지반내 터널의 굴착.보강 설계 및 안정성 분석)

  • Shin, Hee-Soon;Synn, Joong-Ho;Park, Chan;Han, Kong-Chang;Choi, Young-Hak;Choi, Yong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.87-92
    • /
    • 2000
  • In excavation of tunnels especially located in shallow depth, it is not rare to meet geological change in excavation progress worse than expected in the initial design stage. This paper present a case study on the re-design of excavation and support system of a shallow tunnel under construction where it meets the unexpected bad geological condition during excavation. The detailed geological investigation shows that the rock mass is heavily weathered and fractured with RMR value less than 20. Considering this geological condition, the design concept is focused on the reinforcement of the ground preceding the excavation of tunnel. Two design patterns, LW-grouting & forepoling with pilot tunnelling method and the steel pipe reinforced grouting method, are suggested. Numerical analysis by FLAC shows that these two patterns give the tunnel and roof ground stable in excavation process while the original design causes severe failure zone around the tunnel and floor heaving. In point of the mechanical stability and the degree of construction, the steel pipe reinforced grouting technique proved to be good for the reinforcement of heavily fractured rock mass in tunnelling. This assessment and design process would be a guide in the construction of tunnels in heavily weathered and fractured rock mass situation.

  • PDF

Case Study of Ground Behavior Analysis of Soft and Hard Rock Layers with Fractured Zones in Deep Excavation (깊은 굴착에서 파쇄대를 갖는 연암 및 경암 지층의 지반 거동분석 사례연구)

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.521-532
    • /
    • 2008
  • Supporting system design and construction management for the soft and hard rock layers with fractured zones are very important theme for the safety of temporary retaining wall, surrounding ground and structures in the urban deep excavation for the construction of subway, railway, building etc. The prevailing design method of supporting system for the soft and hard rock layers in the deep excavation is mostly carrying out by simplification without proper consideration for the characteristic of rock discontinuities. Therefore the behaviors of rock discontinuities and fractured zones dominate the whole safety of excavation work in the real construction stage, serious disaster due to the failure of temporary retaining wall can be induced in the case of developing large deformations in the ground and large axial forces in the supporting system. This paper introduces examples of deep excavation where the soft and hard rock layers with fractured zones were designed to be supported by shotcrete and rock bolt, deformations of corresponding ground and supporting systems in the construction period and increments of axial force in the upper earth anchors and strut due to the these deformations were investigated through detailed analysis of measurement data, the results were so used for the management of consecutive construction that led to the safe and economical completion of excavation work. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Case Studies of Ground Subsidence Risk Ratings (GSRp) Applied to the Excavation Sites (지반함몰 위험등급 분류(GSRp)의 굴착현장 사례 연구)

  • Shin, Sang-Sik;Ihm, Myeong-Hyek;Kim, Hak Joon
    • The Journal of Engineering Geology
    • /
    • v.29 no.3
    • /
    • pp.289-302
    • /
    • 2019
  • As the occurrence of ground subsidence near the excavation site increases recently, studies are being conducted to predict the possibility of ground subsidence prior to excavation. In this study, the ground subsidence risk rating for pre-excavation (GSRp) developed by the previous study was applied to actual excavation sites to verify its applicability. The final results for the evaluation of the ground subsidence risk level for five excavation sites revealed that GSRp scores were calculated between 40 and 79 points and classified mainly into grades II (Good Ground)~III (Fair Ground). In order to verify the evaluation method, the obtained GSRp grades were compared with the measured horizontal displacements. The horizontal displacements measured in five excavation sites were between 25% and 47% of the allowable displacement, which were well agreed with the low subsidence risk level obtained from GSRp calculation. It is expected that the GSRp method can be used as an evaluation tool for predicting the risk of ground subsidence before excavation if GSRp is verified and supplemented through the additional research for the poor soil with the high risk of ground subsidence.

A Study of Stability Evaluation for Tunnel at the Fault Zone Crossing (단층대를 통과하는 터널의 안정성확보에 관한 연구)

  • 박인준;최정환;김수일
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.105-112
    • /
    • 2001
  • The purpose of this study is to assess the stability of tunnel for a high speed railway crossing the fault zone. The area where the tunnel crossed the fault zone can be unstable during construction and operation. Geotechnical investigations have been conducted to determine an optimum excavation method by obtaining the material properties around the fault zone and to check the stability of the tunnel. For the numerical analysis, the FLAC, numerical analysis code based on finite difference method, was utilized to analyze the behavior of the fault at three points having typical ground conditions. Based on the results of numerical analysis, the combinations of compaction grouting and LW grouting were determined as suitable methods for pre-excavation Improvement of the ground surrounding the tunnel opening. In conclusion, the stability of the tunnel construction for the high speed railway within the fault zone may be obtained by adopting the optimum excavation method and the reinforcement method. The numerical analysis based on FLAC program contains errors caused by assumptions used in numerical analysis, therefore constant monitoring with respect to the change of ground condition and groundwater is highly recommended to minimize the numerical error and the possibility of damage to tunnel.

  • PDF

A Study on the Pit Excavation Volume Using Cubic B-Spline

  • Mun, Du-Yeoul
    • International Journal of Ocean Engineering and Technology Speciallssue:Selected Papers
    • /
    • v.5 no.1
    • /
    • pp.40-45
    • /
    • 2002
  • The calculation of earthwork plays a major role in the planning and design phases of many civil engineering projects, such as seashore reclamation; thus, improving the accuracy of earthwork calculation has become very important. In this paper, we propose an algorithm for finding a cubic spline surface with the free boundary conditions, which interpolates the given three-dimensional data, by using B-spline and an accurate method to estimate pit-excavation volume. The proposed method should be of interest to surveyors, especially those concerned with accuracy of volume computations. The mathematical models of the conventional methods have a common drawback: the modeling curves form peak points at the joints. To avoid this drawback, the cubic spline polynomial is chosen as the mathematical model of the new method. In this paper, we propose an algorithm of finding a spline surface, which interpolates the given data, and an appropriate method to calculate the earthwork. We present some computational results that show the proposed method, of the Maple program, provides better accuracy than the method presented by Chen and Lin.

  • PDF

Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(II) (장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(II))

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.248-259
    • /
    • 2010
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces one example of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. The characteristics of ground deformation and strut axial force change, the measured data obtained during construction process, were analysed, the effects of relatively deeper excavation than the specification on one excavation side and rapid drawdown of ground water level on the other excavation side were deeply investigated from the viewpoint of mutual influences between ground deformations of both excavation sides and strut axial force changes. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF