• Title/Summary/Keyword: excavation force

Search Result 162, Processing Time 0.022 seconds

Relationship Analysis of Volumetric Water Content According to the Dielectric Constant for Stability Analysis of Ground Excavation (굴착의 안정성에 미치는 영향인자 분석을 위한 전자기적 유전상수와 체적함수비와의 상관관계 분석기법 연구)

  • Han, Yushik;Sohn, Hee Jeung;Yoo, Ki Cheong
    • Geophysics and Geophysical Exploration
    • /
    • v.19 no.3
    • /
    • pp.153-163
    • /
    • 2016
  • In order to prevent ground collapses by groundwater level drawdown, we need to understand the groundwater flow and also make an analytical approach to the cause of the collapses. In this study, we used the result of the soil lab tests to compare and review the suitability of the various interaction equations about the relation between volumetric water content and the dielectric constant. In addition, using GPR (Ground-Penetrating Radar), we reviewed the possibility of calculating an estimate of dielectric constant. Lastly, we applied seepage analysis and stress-strain analysis to the sandy ground given by ground excavation. In comparison with the previous result of the soil lab tests, we similarly predicted the suction of unsaturated soil from results of stress-strain analysis considered the seepage force for the unsaturated soil.

Behavior of Building Lower Part Passage Tunnel due to Adjacent Ground Excavation (근접굴착에 따른 건물 하부 통과 터널의 거동)

  • Lee, Jong-Min;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.369-377
    • /
    • 2010
  • Applied to the braced wall in order to stabilize the adjacent tunnel. A pre-load of bracing was imposed to prevent the horizontal displacement of the braced wall during the ground excavation. For this purpose, real scale model tests were conducted, without and with pre-load on braced wall. Real scale model tests were conducted, without and with building load (0 m, 1D, 2D) on ground surface. As a result, it was found that the stability of the existing tunnel adjacent to the braced wall could be greatly enhanced when the horizontal displacement of the braced wall was reduced by applying a pre-load, which was larger than the designated axial force of bracing. In this paper, the behaviors of braced wall and adjacent tunnel was studied. Model tests in 1:10 scale were performed in real construction sequences. Adjacent tunnel was 12 m in diameter and the size of test pit was 2.0 m (width) ${\times}$ 6.0 m (height) ${\times}$ 4.0 m (length) in dimension.

A Study on the Method of Calculating the Deformation Coefficient According to the Horizontal Subgrade Reaction Modulus and Cohesion (수평지반반력계수와 점착력에 따른 지반변형계수 산정방법 연구)

  • Sungjae Jeon;Daeseock Jung
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.31-43
    • /
    • 2023
  • Purpose: In this study, an analysis of the differences between the elastoplastic analysis and the numerical analysis and a study of the design ground constant recalculation method to derive similar trends in the analysis results were conducted. Method: The relational expression between the ground reaction force coefficient and the ground deformation coefficient at the time when the wall displacement becomes the same according to shallow excavation and deep excavation was derived. Result: Based on the measurement results, reverse analysis was performed to re-calculate the ground properties suitable for the site ground, and as a result of comparing and verifying the wall displacement using the derived formula and the literature formula, the proposed formula showed the most similar value. Conclusion: If the proposed formula is used, it will be helpful in practice because it is possible to infer the most similar ground properties to the actual at the time of design.

The tunnel model tests of material development in different surrounding rock grades and the force laws in whole excavation-support processes

  • Jian Zhou;Zhi Ding;Jinkun Huang;Xinan Yang;Mingjie Ma
    • Geomechanics and Engineering
    • /
    • v.36 no.1
    • /
    • pp.51-69
    • /
    • 2024
  • Currently, composite lining mountain tunnels in China are generally classified based on the [BQ] method for the surrounding rock grade. Increasingly, tunnel field construction is replicated indoors for scale down model tests. However, the development of analogous materials for model tests of composite lining tunnels with different surrounding rock grades is still unclear. In this study, typical Class III and V surrounding rock analogous materials and corresponding composite lining support materials were developed. The whole processes of excavation-support dynamics of the mountain tunnels were simulated. Data on the variation of deformations, contact pressures and strains on the surrounding rock were obtained. Finally, a comparative analysis between model tests and numerical simulations was performed to verify the rationality of analogous material development. The following useful conclusions were obtained by analyzing the data from the tests. The main analogous materials of Class III surrounding rock are barite powder, high-strength gypsum and quartz sand with fly ash, quartz sand, anhydrous ethanol and rosin for Class V surrounding rock. Analogous materials for rockbolts, steel arches are replaced by aluminum bar and iron bar respectively with both shotcrete and secondary lining corresponding to gypsum and water. In addition, load release rate of Class V surrounding rock should be less than Class III surrounding rock. The fenestration level had large influence on the load sharing ratio of the secondary lining, with a difference of more than 30%, while the influence of the support time was smaller. The Sharing ratios of secondary lining in Class III surrounding rock do not exceed 12%, while those of Class V surrounding rock exceed 40%. The overall difference between the results of model tests and numerical simulations is small, which verifies the feasibility of similar material development in this study.

Study of the Soilnail-Slope Design Method Considering Bending Resistance of Soilnail (휨저항을 고려한 쏘일네일보강사면의 해석에 관한 연구)

  • Joo, Yong-Sun;Kim, Nak-Kyung;Kim, Sung-Kyu;Park, Jong-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6C
    • /
    • pp.331-338
    • /
    • 2008
  • Soil nailing is used as a method of slope stabilization and excavation support. The design method of soil nail are based on experience or assumption of interaction between soil and reinforcement. Most design methods simply considers the tension of reinforcement for analysis of slope stabilization. Soil nails interact with soils under combined loading of shear and tension. Jewell & Pedley suggested a design equation of shear force with bending stiffness and discussed that the magnitude of the maximum shear force is small in comparison with the maximum axal force. However, they have used a very conservative limiting bearing stress on nails. This paper discusses that the shear strength of soil nails should not be disregarded with proper bearing stresses on nails. The modified FHWA design method was proposed by considering shear forces on nails with bending stiffness.

Compression Test of a TBM Thrust Jack for Validating Buckling Stability (TBM 추진잭의 좌굴 안정성 검토를 위한 압축시험)

  • Mun-Gyu Kim;Min-Gi Cho;Jung-Woo Cho;Han-Young Jeong
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.339-347
    • /
    • 2023
  • As the jacks provide a thrust force on the inclined surface, bending deformations by a side force occur in the pedestal and rod parts. This can induce disorder or degradation of the thrust module, buckling stability on the inclined compression condition should be clarified to secure the reliability of shield TBM. For analyzing the stability, a buckling testing method for hydraulic cylinder was investigated and compression testing system was installed. Before the test, a numerical analysis was conducted to check the stress concentration parts. The maximum allowable force was loaded on the cylinder specimen at 0 degree surface condition as a preliminary test. After the test, plastic deformations or hydraulic leakage was not observed. The static stability of it was verified at 0 degree condition.

An Study on Cognition and Investigation of Silla Tumuli in the Japanese Imperialistic Rule (일제강점기의 신라고분조사연구에 대한 검토)

  • Cha, Soon Chul
    • Korean Journal of Heritage: History & Science
    • /
    • v.39
    • /
    • pp.95-130
    • /
    • 2006
  • Japanese government college researchers, including Sekino Tadashi(關野貞), have conducted research studies and collected data, on overall Korean cultural relics as well as Silla tumuli(新羅古墳) in the early modern times under the Japanese imperialistic rule. They were supported by the Meichi government in the early stage of research, by the Chosun government-general, and by their related organizations after Korea was coIonialized to carry out investigations on Korean antiquities, fine arts, architecture, anthropology, folklore, and so on. The objective for which they prosecuted inquiries into Korean cultural relics, including Silla tumuli, may be attributed to the purport to find out such data as needed for the theoretical foundation to justify their colonialization of Korea. Such a reason often showed locally biased or distorted views. Investigations and surveys had been incessantly carried out by those Japanese scholars who took a keen interest in Korean tumuli and excavated relics since 1886. 'Korea Architecture Survey Reports' conducted in 1904 by Sekino in Korea gives a brief introduction of the contents of Korean tumuli, including the Five Royal Mausoleums(五陵). And in 1906 Imanishi Ryu(今西龍) launched for the first time an excavation survey on Buksan Tumulus(北山古墳) in Sogeumgangsan(小金剛山) and on 'Namchong(南塚)' in Hwangnam-dong, which greatly contributed to the foundation of a basic understanding of Wooden chamber tombs with stone mound(積石木槨墳) and stone chambers with tunnel entrance(橫穴式石室墳). The ground plan and cross section of stone chambers made in 1909 at his excavation survey of seokchimchong(石枕塚) by Yazui Seiyichi(谷井第一) who majored in architecture made a drawing in excavation surveys for the first time in Korea, in which numerical expressions are sharply distinguished from the previous sketched ones. And even in the following excavation surveys this kind of drawing continued. Imanishi and Yazui elucidated that wooden chambers with stone mound chronologically differs from the stone chambers with tunnel entrance on the basis of the results of surveys of the locational characteristics of Silla tumuli, the forms and size of tomb entrance, excavated relics, and so forth. The government-general put in force 'the Historic Spots and Relics Preservation Rules' and 'the Historic Spots Survey Council Regulations' in 1916, establishing 'Historic Spots Survey Council and Museum Conference. When museums initiated their activities, they exhibited those relics excavated from tumuli and conducted surveys of relics with the permission of the Chosun government-general. A gold crown tomb(金冠塚) was excavated and surveyed in 1921 and a seobong tomb(瑞鳳塚) in 1927. Concomitantly with this large size wooden chamber tombs with stone mound attracted strong public attention. Furthermore, a variety of surveys of spots throughout the country were carried out but publication of tumuli had not yet been realized. Recently some researchers's endeavors led to publish unpublished reports. However, the reason why reports of such significant tumuli as seobong tomb had not yet been published may be ascribed to the critical point in those days. The Gyeongju Tumuli Distribution Chart made by Nomori Ken(野守健) on the basis of the land register in the late 1920s seems of much significance in that it specifies the size and locations of 155 tumuli and shows the overall shape of tumuli groups within the city, as used in today's distribution chart. In the 1930s Arimitsu Kyoichi(有光敎一) and Saito Tadashi(齋藤忠) identified through excavation surveys of many wooden chamber tombs with stone mound and stone chambers with tunnel entrance, that there were several forms of tombs in a tomb system. In particular, his excavation survey experience of those wooden chamber tombs with stone mound which were exposed in complicated and overlapped forms show features more developed than that of preceding excavation surveys and reports publication, and so on. The result of having reviewed the contents of many historic spots surveyed at that time. Therefore this reexamination is considered to be a significant project in arranging the history of archaeology in Korea.

The Numerical Analysis on the Behaviour of Combined Sheet Pile in the Reclaimed Ground Mixed by Sandy Soil and Clayey Soil (사질토와 점성토가 혼재하는 해안 매립지반에서 조합형 Sheet Pile의 거동에 관한 해석적 연구)

  • Kim, Byung-Il;Kim, Young-Sun;Han, Sang-Jae;Park, Eon-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.3
    • /
    • pp.9-21
    • /
    • 2020
  • In this study, the design method of the combined sheet pile was considered in the coastal landfill where sandy and clayey soils are mixed, and the behavior in excavation was analyzed. It was confirmed from the elasto-plastic analysis that the predicted behavior of the temporary facilities of earth retaining differs according to the type of the combined sheet pile method (Built up, Interlocking, Welding) and the analysis method (soldier pile method, continuous wall method). In the case of sheet pile member force, the results of the continuous wall analysis method predicted the most conservative results. When the stress ratio (calculation/allowance) of each member was analyzed based on the maximum member force of the combined sheet pile method, the maximum value was obtained for bending moment in the side pile and combined stress in the case of the strut. As a result of finite element analysis, the member force of the side pile was the largest in the short-term effective stress analysis condition, while the compressive force of the strut was large in the consolidation analysis. When comparing the results of the elasto-plastic analysis and the finite element analysis, the shear force of the side pile and the axial force of the strut were greatly evaluated in the elasto-plastic analysis, and the bending moment of the side pile was the largest in the short-term effective stress condition of the finite element analysis. In addition, the displacement of the side pile was predicted to be greater in the finite element analysis than in the elasto-plastic analysis.

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.

Field Test for Estimation of Acting Force on the Drum Cutter Attachment (드럼커터 어태치먼트의 작용력에 대한 현장시험)

  • Soon-Wook, Choi;Chulho, Lee;Tae-Ho, Kang;Soo-Ho, Chang
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.373-385
    • /
    • 2022
  • The drum cutter, which is used in the form of an attachment of a excavator, is very useful in that it can be used in connection with a excavator that can perform various tasks in the field. This study estimated the load and torque acting on the drum cutter attachment by measuring the hydraulic pressure and strain that appear during excavation on the exposed rock slope using the drum cutter installed in the excavator. Working conditions such as the operation angle between the boom and arm of the excavator were divided into eight working modes. And as a result of analyzing the variations in hydraulic pressure and action force according to the working mode, it was confirmed that the hydraulic pressure and flow rate can be driven without any problems within the range considered in the manufacturing specifications of the drum cutter. The average load and torque acting on the drum cutter were within the range of the manufacturing specifications, but the maximum load was up to four times the specification. Because sumping was not properly performed due to the high ground strength and the ground included discontinuous surfaces in some locations, no trend of load and torque was found depending on the angle between the boom and arm of the excavator. However, it is believed that this result can be used to determine the range of loads and torques that appear on the drum cutter when excavating a high-intensity rock.