손상영역을 고려한 철도터널의 최적의 발파압력 선정에 관한 연구 (A Study on Optimized Blasting Pressure Considering Damage Zone for Railway Tunnel)

  • 박종호;엄기영;조국환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1162-1170
    • /
    • 2011
  • Since there is 70% of the land in South Korea is forest, tunnel constructions by blasting are common for building railways and roads. The damage to the bedrock and the development of overbreak near the face of the tunnel during the blasting directly affect the safety of the tunnel and the maintenance after the construction. Therefore, there is a need to investigate the damage zone in the bedrock after the blasting. The damage zone changes the properties of the bedrock and decreases the safety. Especially, the coefficient of permeability of the damaged bedrock increases dramatically, which is considered very important in construction. There is a lack of research on the damage that bedrock is received with respect to the amount of explosives in blasting, which is required for the design of optimum support in blast excavation that maximizes the support of the bedrock. Therefore, in this research, numerical analysis was performed based on the field experiment data in order to understand the mechanical characteristics of the bedrock after to the blast load and to analyze the damage that the bedrock receives from the blast load. In addition, a method was proposed for selecting the optimum blast pressure for train tunnel design with respect to the damage zone.

  • PDF

3차원 수치해석을 이용한 연약대 방향에 따른 터널 거동 특성 평가 (Assessment of Tunnel Displacement with Weak Zone Orientation using 3-D Numerical Analysis)

  • 임성빈;정해근;서용석
    • 지질공학
    • /
    • 제19권1호
    • /
    • pp.43-50
    • /
    • 2009
  • 터널 굴착 중 지반에 존재하는 연약대의 방향 특성에 따른 거동 및 응력 분포 특성을 3차원 수치해석을 이용하여 정량적으로 평가하였다. 수치모델에서 연약대의 방향은 RMR의 취약 불연속면에 대한 보정인자를 기준으로 설정되었으며, 위치는 각 방향 조건에 대하여 연약대가 천단부 상부 1D, 천단부, 막장 중앙부를 지나는 경우로 설정되었다. 지반정수는 현장 계측변위를 기반으로 하는 역해석을 통해 산정하였다. 최종적으로 터널 천단부에서 발생하는 변위의 크기를 기반으로 연약대 방향 및 위치 조건에 따른 영향도를 평가하여 5등급으로 분류하였다.

터널의 품질관리를 위한 숏크리트 초기강도의 현장강도 시험기술 (Field Testing Methods on Early Shotcrete Strength for Tunnel Quality Control)

  • 홍의준;장석부;이성우;김기림;문상조
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.468-476
    • /
    • 2007
  • Generally, the strength of the field shotcrete is heavily dependent on the field mixing and spraying conditions so that it is different from the strength of the shotcrete mixed in laboratories. As a support member, the early strength of shotcrete unlike concrete as structural material is very important to the initial stabilization of the excavation face in tunnels. Therefore, the field methods to efficiently test the early strength of shotcrete have been highly required. This paper aimed to verify the pneumatic pin penetration test and the point load test for measuring the early strength of the field shotcrete. Through a series of uniaxial compression, pin penetration, and point load tests for the range of the early shotcrete strength, two equations to estimate reliably the uniaxial compressive strength by the pin penetration and the point load tests were derived. Field tests in working tunnel were carried out in order to estimate the economic efficiency. As a result, pin penetration method was proved to be the most effective method for testing the early strength of the field shotcrete.

  • PDF

지하철 터널 굴착공법 (MORDERN METHODS FOR TUNNEL)

  • 허진
    • 기술사
    • /
    • 제14권3호
    • /
    • pp.9-21
    • /
    • 1981
  • The rationalization for Tunnel Drifting is based on the high productivity which is achievable due to Continuous work with a Jumbo Drill, resulting in a much higher efficiency them the Conventional method of blasting, mucking and supporting services. Large projects of over 4,000m Tunnel Drifting are condidated to justify the use of a Jumbo Drill with a combination of superior explosives, machinery and techniques. During a Tunnel Drifting test, Gulita, Nabit and slurry made by Nitro Nobel were employed with following results. 1, Conditions: a. Granite Rock with Two free face b. Burden (W), 2m c. Diameter of hole, 42mm d. Depth of hole 3.5m e. Hole pitch 0.6m f. Charged Explosive per hole Gelatin Dynamite 4 pieces (112.5${\times}$4ea)+Guuita 5 pieces(110g${\times}$5ea) g. Simal-taneous Detonation h. After the blasting resultant rock size was Less 40% of the 0.3m Lumps. 2. Calculation results W=q/Wn=100cm‥‥‥Burden in simultaneous blasting 0.865kg(7.7ea)/hole ‥‥‥Amount of charge but hole pitch is 1.5W-2W The estimated cost of using a Jumbo Drill for the Construction of a 3,000,000 bbL sub-surface oil storage would be as follows: This calculation is based on the Jumbo Drill advancing 3.6m per blasting cycle. Unit cost/bbL Excavation $3.13 The attached sheet shows ideal Drilling pattern with Burn Cut & Smooth blasting method. In conclusion, it is my opinion that this method will assure safety and save cost and improve our technical know-how.

  • PDF

일차파괴된 암반사면의 전단강도 및 보강설계법 고찰 (A study on the determination of shear strength and the support design of pre-failed rock slope)

  • 조태진;김영호
    • 터널과지하공간
    • /
    • 제5권2호
    • /
    • pp.104-113
    • /
    • 1995
  • Shear strength of the discontinuity on which the pre-failure of rock slope was occurred during surface excavation was measured through the direct shear test using core samples obtained in-situ. Internal friction angle was increased as the roughness of discontinuity surface(JRC) was increased. Results of the tilt test using core samples of higher JRC also showed very similar trend as those of the direct shear test. When the samples replicated from natural cores were used int he tilt test, results of friction angles showed almost perfect continuation of the residual friction angles from the direct shear test. However, when the gouge material existed in the discontinuity the internal friction angle strongly depended upon the rate of filling thickness to the height of asperity irrespective of the JRC. Based on the results of both direct shear test and tilt test internal friction angle and cohesion of discontinuity, which reflect the in-situ conditions fo pre-sliding failure and also can be used for the optimum design of support system, were assessed. Two kinds of support measures which were expected to increase the stability of rock slope were considered; lowering of slope face angle and installation of rock cable. But, it was found that the first method might lead to more unstable conditions of rock slope when the cohesion of discontinuity plane was negligibly low and in that case the support systems of any kind which could exert actual resisting force were needed to ensure the permanent stability of rock slope.

  • PDF

NATE터널의 갱문 가시설 배후 균열에 따른 조치 및 보강사례

  • 길호언;김진흥;유재성;차복남
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.342-355
    • /
    • 2006
  • The Tunnel portal is designed on temporary support system which is composed by 28m height H-Pile method and Ground Anchor method. The tunnel has excavated about 30m from the portal, but some deformation is found on the surface ground just above the tunnel face. It was investigated very carefully to find out the causes of deformation. By the observation and study, two main causes of deformation are found out. The one is earth pressure increase compared with classical earth pressure theory. That was due to the direction of ground rock mass's discontinuities. It causes the increase of earth pressure that are activated by the direction of discontinuity. The other one is that present design method neglect the transferred force by removal of temporary support members and ground anchor within the tunnel contour line as the tunnel excavation proceeds As the result of removals of the member and anchor, some force transferred from removed systems to remaining supporting systems. In designing the portal support systems, lt must be considered the discontiunity of ground mass and the transfered force due to excation.

  • PDF

파쇄대를 통과하는 해저터널의 수리거동에 관한 연구 (Hydraulic behavior of a subsea tunnel in a ground with fractured-zones)

  • 신종호;최규철
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1571-1580
    • /
    • 2008
  • Subsea tunnels that link land to island and among nations for transportation, efficient development of limited surface and pursuit of economic development should be designed to support pore water pressure on the lining. It is generally constructed in the bed rock of the sea bottom. When the tunnel excavation face meets fractured-zones below sea bottom, collapse may occur due to an increase of pore water pressure and large inflow. Such an example can be found in the Norwegian subsea tunnel experiences in 1980's. In this study hydraulic behavior of tunnel heading is investigated using numerical method based on the collapse of Norwegian subsea tunnel. The effect of pore water pressure and inflow rate were mainly concerned. Horse-shoe shaped model tunnel which has 50 m depth from the sea bottom is considered. To evaluate hydraulic performance, parametric study was carried out for varying relative permeability. It is revealed that pore water pressure has increased with an increase of sea depth. Especially, at the fractured-zone, pore water pressure on the lining has increased significantly. Inflow rate into tunnel has also increased correspondingly with an increase in sea depth. S-shaped characteristic relation between relative permeability and normalized pore water pressure was obtained.

  • PDF

황룡사 목탑 기단 연구 (A Study on the Stylobate of the Wooden Pagoda Site in Hwangnyongsa Temple)

  • 이상명
    • 건축역사연구
    • /
    • 제30권6호
    • /
    • pp.7-22
    • /
    • 2021
  • This study was prepared to understand the changes in the stylobate and the characteristics of contrasting with the wooden pagoda of Hwangnyongsa Temple, which occupies an important position in ancient architecture. Literature data related to the wooden pagoda of Hwangnyongsa Temple, excavation data, and newly identified stylobate stone were examined.The reconstruction period of the wooden pagoda of Hwangnyongsa Temple, the size and form of the stylobate, the plan of the stylobate, the height plan, and the elevation plan were reviewed one after another.Since its foundation in 646, the wooden pagoda of Hwangnyongsa Temple has been rebuilt during the reign of King Gyeongmun in 873 and a stylobate has been rebuilt. Through the analysis of similar cases with the wooden pagoda's face stone members, the elevation of the stylobate was proved. It is estimated that the size and format of the wooden pagoda stylobate were similar to those of the reconstruction stylobate. It seems that the Sumijwa style stylobate was first introduced to the foundation of the wooden pagoda of Hwangnyongsa Temple. This is of great significance in that it provided a fundamental motif for the stylobate of architecture and stone architecture of the Unified Silla period.

Dynamic evolution characteristics of water inrush during tunneling through fault fracture zone

  • Jian-hua Wang;Xing Wan;Cong Mou;Jian-wen Ding
    • Geomechanics and Engineering
    • /
    • 제37권2호
    • /
    • pp.179-187
    • /
    • 2024
  • In this paper, a unified time-dependent constitutive model of Darcy flow and non-Darcy flow is proposed. The influencing factors of flow velocity are discussed, which demonstrates that permeability coefficient is the most significant factor. Based on this, the dynamic evolution characteristics of water inrush during tunneling through fault fracture zone is analyzed under the constant permeability coefficient condition (CPCC). It indicates that the curves of flow velocity and hydrostatic pressure can be divided into typical three stages: approximate high-velocity zone inside the fault fracture zone, velocity-rising zone near the tunnel excavation face and attenuation-low velocity zone in the tunnel. Furthermore, given the variation of permeability coefficient of the fault fracture zone with depth and time, the dynamic evolution of water flow in the fault fracture zone under the variable permeability coefficient condition (VPCC) is also studied. The results show that the time-related factor (α) affects the dynamic evolution distribution of flow velocity with time, the depth-related factor (A) is the key factor to the dynamic evolution of hydrostatic pressure.

파쇄대 예측을 위한 터널의 3차원 수치해석 (3-Dimensional Tunnel Analyses for the Prediction of Fault Zones)

  • 이인모;김돈희;이석원;박영진;안형준
    • 한국지반공학회논문집
    • /
    • 제15권4호
    • /
    • pp.99-112
    • /
    • 1999
  • 막장 전방에 파쇄대 등의 불연속면이 존재할 경우, 이를 미리 예측하지 못한채로 굴진을 하게 되면 파쇄대로 인해 터널 굴진에 따라 발생된 종방향 아칭에 영향을 주어 막장면 전방에 응력이 집중하게 된다. 터널 및 지하공간의 설계시에는 불확실한 설계요소를 과다하게 내포하고 있으므로 경제적이고 안정성이 확보된 터널 시공을 위해서는 터널 막장면에서의 정확한 계측으로 막장 전방의 파쇄대를 예측하여 터널 지보체계에 신속히 대비함이 필요하다. 최근의 연구결과에 의하면 3차원 절대변위계측에 의해 터널의 시공 시 굴진에 따라 지반의 강도차이로 인해 발생된 종방향 변위의 변화를 측정하여 막장 전방의 불연속면을 미리 예측할 수 있다고 하였다. 본 연구는 혼합법을 사용한 3차원 수치해석으로부터 얻어지는 변위로부터 L/C (천단부의 종방향 변위[L]와 천단부의 침하량[C]의 비 )와 S/C (측벽의 수평방향 변위[S]와 천단부의 침하량[C]의 비), (Ll-Lr)/C (좌측벽의 종방향변위[Ll]와 우측벽의 종방향변위[Lr]의 차와 천단부의 침하량[C]의 비), 평사투영법을 중심으로 지반에 파쇄대가 존재할 경우에 대해 여러 가지 초기 지중응력조건에서 터널 굴착에 따른 3차원 절대 변위를 분석하여 그 존재를 예측할 수 있는 기법을 제시하였다.