A Study on the visco-plastic behavior of the jointed rock mass reinforced by rockbolts during excavation (굴착과정에서 록볼트로 보강된 절리암반의 점소성 거동 분석)

  • 이연구;이정인;조태진
    • Tunnel and Underground Space
    • /
    • v.5 no.2
    • /
    • pp.123-133
    • /
    • 1995
  • A two dimensional visco-plastic finite element model capable of handling the multistep excavaton was developed for investigating the effect of excavation-support sequences on the behaviour of underground openings in the jointed rock mass. Ubiquitous joint pattern was considered in the model and joint properties in each set were assumed to be identical. Passive, fully-grouted rockbolts were considered in the model. Visco-plastic deformations of joints and rockbolts were assumed to be governed by Mohr-Coulomb and von Mises yield criteria, respectively. With the ability of removing elements, the model can von Mises yield criteria, respectively. With the ability of removing elements, the model can simulate the multi-step excavation-support sequences. The reliability of the model to the stability analysis for the underground excavation in practice was checked by simulating the behavior of underground crude oil storage caverns under construction.

  • PDF

Ground Movement Analysis by Field Measurements (현장계측에 의한 지반거동 분석)

  • Chon, Yong-Back;Cho, Sang-Wan
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.8 no.3
    • /
    • pp.161-168
    • /
    • 2005
  • This study is analysis for adjacent structures and ground movement by deep excavation work. Underground Inclinometer has shown that deformation of increment is minor within to allowable limit. According to the measurements result of slope and crack for adjacent structures, a detached house showed bigger than hospital structure to deformation of increment. Variation of underground water level didn't effect so much to ground and adjacent structures movement because underground water flows in rock and didn't give the water press to propped walls. Measurement data of strut variation is within tolerance limit. Because excavation site's wall was strengthened suitably. This study will contribute in establishment of measurement standard and information-oriented construction during deep excavation in multi-layered ground including rock masses.

  • PDF

Analysis of Response Change of Structure due to Tunnel Excavation Conditions in Sand Ground (모래지반에서 터널 굴착조건들을 반영한 상부 블록구조물의 거동변화 분석)

  • Son, Moorak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1541-1549
    • /
    • 2013
  • This study investigates the response of structures to tunnelling-induced ground movements in sand ground, varying tunnel excavation condition (tunnel depth and diameter), tunnel construction condition (ground loss), ground condition (loose sand and dense sand). Four-story block-bearing structures have been used because the structueres can easily be characterized of the extent of dmages with crack size and distribution. Numerical parametric studies have been used to investigae of the response of structures to varying tunnelling conditions. Numerical analysis has been conducted using Discrete Element Method (DEM) to have real cracks when the shear and tensile stress exceed the maximum shear and tensile strength. The results of structure responses from various parametric studies have been integrated to consider tunnel excavation condition, tunnel construction condition, and ground condition and provided as a relationship chart. Using the chart, the response of structures to tunnelling can easily be evaluated in practice in sand ground.

Study on the Structural Safety for the Non-Open excavation method by Using Steel Tubular Roof (대구경 강관을 이용한 비개착공법의 구조적 안전성에 대한 연구)

  • Kim, Kyong-Gon;Kim, Kyeong-Hwan;Kim, Hyo-Jin;Lee, Sang-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.49-57
    • /
    • 2009
  • The development and use of underground space in the city have been expanded considerably worldwide due to the growing population and traffic. Because the construction of underground causes some problems including traffic jam and safety accidents, the non-open excavation construction method are commonly used. NTR (New Tubular Roof) method which is one of the non-open excavation method is investigated in this study. The structural safety of underground structures by using NTR method is evaluated by ANSYS 9.0. The tubular roof according to diameters are analysed by ANSYS 9.0 at critical construction step. Finally, according the diameter and thickness of tubular roof the stress nad dispacement are analyzed and then the The efficient use of tubular roof is suggested from relationship between tubular's thickness and stress condition.

  • PDF

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

Suggestion of empirical formula between FPI and specific energy through analysis of subsea tunnel excavation data (해저 터널 굴진자료 분석을 통한 FPI와 비에너지의 경험식 제시)

  • Kim, Kyoung-Yul;Bae, Du-San;Jo, Seon-Ah;Ryu, Hee-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.687-699
    • /
    • 2018
  • The construction of subsea tunnel differs from that of inland tunnel because of high water pressure due to sea water level and difficulties to reinforce the ground under construction. Therefore, it is very important to prevent trouble in advance when the subsea tunnel is constructed. In this paper, we established lots of databases about characteristics of geological and mechanical parameters on the construction of subsea tunnel using micro slurry TBM which depth is about 60 m. The correlation analysis is conducted to confirm the effect of thrust, torque and RPM among the excavation database on the net penetration rate. Also, An empirical formula is suggested to predict the net penetration rate through the correlation analysis between FPI (Field Penetration Index) and specific energy from the subsea tunnel excavation database.

Site Application of Artificial Neural Network for Tunnel Construction (인공신경망을 이용한 터널시공에서 현장 적용성)

  • Song, Joohyeon;Chae, Hwiyoung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.8
    • /
    • pp.25-33
    • /
    • 2012
  • Although it is important to reflect the accurate information of the ground condition in the tunnel design, the analysis and design are conducted by limited information because it is very difficult to consider various geographies and geotechnical conditions. When the tunnel is under construction, examination of accurate safety and prediction of behavior are overcome the limits of predicting behavior by Artificial Neural Network in this study. First, construct the suitable structure after the data of field was made sure by the multi-layer back propagation, then apply with algorithm. Employ the result of measured data from database, and consider the influence factor of tunnel, like supporting pattern, RMR, Q, the types of rock, excavation length, excavation shape, excavation over, to carry out the reliable analysis through field applicability of Artificial Neural Network. After studying, using the ANN model to predict the shearing displacement, convergence displacement, underground displacement, Rock bolt output follow the excavation over of tunnel construction field, then determine the field applicability with ANN through field measured value and comparison analysis when tunnel is being constructed.

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

Investigation of three-dimensional deformation mechanisms of box culvert due to adjacent deep basement excavation in clays

  • Bu, Fanmin;Yu, Wenrui;Chen, Li;Wu, Erlu
    • Geomechanics and Engineering
    • /
    • v.30 no.6
    • /
    • pp.565-577
    • /
    • 2022
  • In this study, a series of three-dimensional numerical parametric study was conducted to investigate deformation mechanisms of an existing box culvert due to an adjacent multi-propped basement excavation in clays. Field measurements from an excavation case history are first used to calibrate a baseline Hardening Soil Small Strain (HS-small) model, which is subsequently adopted for parametric study. Results indicate that the basement-box culvert interaction along the basement centerline can be considered as a plane strain condition when the length of excavation (L) reaches 14 He (i.e., final excavation depth). If a plane strain condition (i.e., L/He=12.0) is assumed for analyzing the basement-box culvert interaction of a short excavation (i.e., L/He=2.0), the maximum settlement and horizontal movement of the box culvert are overestimated significantly by up to 15.7 and 5.1 times, respectively. It is also found that the deformation of box culvert can be greatly affected by the basement excavation if the distance between the box culvert and retaining wall is less than 1.5 He. The induced deformation in the box culvert can be dramatically reduced by improving the ground inside the excavation or implementing other precautionary measures. For example, by adding jet grouting columns within the basement and installing an isolation wall behind the retaining structures, the maximum settlements of box culvert are shown to reduce by 37.2% and 13.4%, respectively.

Investigation of Prior Technology and Development Case for Consecutive Excavation Technique of Shield TBM (연속굴착 쉴드 TBM 기술 관련 해외기술 및 개발사례 조사)

  • Mun-Gyu Kim;Jung-Woo Cho;Hyeong-seog Cha
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.299-311
    • /
    • 2023
  • Continuous excavation technologies are developed to improve the excavation rate of shield TBM. Continuous excavation is a technology that provides thrust to segments, excluding being installed one, to reduce tunneling downtime. This paper investigated the prior technology related to continuous excavation segments. The main technology was classified into helical segment, honeycomb segment, and conventional segment methods. The helical segment method has not been applied in actual construction yet, and the honeycomb segment method has not succeeded in commercialization. The continuous excavation method using conventional segments has been successfully demonstrated. The thrust force and operation method of the thrust jacks for the semi-continuous technology were analyzed. Continuous excavation TBM research is also progressing in Korea, and through the analysis of successful cases, the need to develop independent continuous excavation methods has been identified.