• Title/Summary/Keyword: estimate cost

Search Result 1,652, Processing Time 0.026 seconds

Development of a Model for a National Animal Health Monitoring System in Gyeongnam III. Cost Estimates of Selected Dairy Cattle Diseases (동물(젖소) 건강 Monitoring System 모델 개발 III. 목장에서 빈발하는 질병의 비용 평가)

  • 김종수;김용환;이효종;김곤섭;김충희;박정희;하대식;최민철
    • Journal of Veterinary Clinics
    • /
    • v.16 no.2
    • /
    • pp.428-438
    • /
    • 1999
  • A study was conducted to estimate cost of major dairy cattle diseases. Forty (n=40) of the 167 dairy herds in Gyeongnam (Chinju) area were stratified and selected randomly for participation in the national animal health monitoring system. Gyeongsnag University veterinarians, Gyeongnam Livestock Promotion Institute veterinarians and clinic veterinarian visited each herd once a month for a total periods of 12 months. At a each visit data on disease, production, management, finance, treatments, preventive activities, animal events, and any other relevant events were collected. Monthly and annual cost estimates of disease treatment were in computed in each herd and stratum(including cost of prevention). Results were expressed as cost per head and given separately for cows, young stock, and calves. In cows, the most expensive seven diseases entities (from the most to the least) were : (1) clinical mastitis; (2) breeding problems; (3)gastrointestinal problems; (4) multiple system problem; (5) birth problems; (6) metabolic/nutritional disease; (7) lameness. In young stock, the most costly disease were the multiple system problems, breeding problems, respiratory disease, gastrointestinal disease, and lameness. In calves, the most costly disease problems were gastrointestinal problems, respiratory disease, integumental, multiple system problems, and metabolic/nutritional problems.

  • PDF

A Criterion for Estimating Supervision Cost Considering the Change Factors by Construction Works (공사별 변동요인을 고려한 적정 감리대가의 산정기준 연구)

  • Lee, Bae Ho;Kang, Leen Seok;Lee, Yang Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.5
    • /
    • pp.1199-1208
    • /
    • 1994
  • In the country, supervision cost is being estimated by percentages of construction cost or cost plus a fixed fee without a reasonable standard. This type has no function for adjusting supervision cost according to variables, such as construction work complexity, extent of supervisory services, fluctuations in prices. In this study, an objective criterion to estimate supervision cost with improved supervisory services has been developed, in which adjusting functions as stated above should be properly considered. A comparative study of supervisory service systems in foreign countries and a survey through questionnaire were carried out for the study. An objective criterion from the results is proposed in the form of an expression or table.

  • PDF

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Estimate of Additional Construction Cost as Certifying G-SEED of Office Building in Korea

  • Kim, Jea-Moon;Shin, Sung-Joon;Hur, In
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.21-28
    • /
    • 2014
  • To improve environmental problem as globally climate changes, domestic and foreign government have been trying to reduce green gas emitted by all industries. With making the green building certification system that assess the substantiality and energy performance of building, a governments have been using by a way for reducing green gas emitted in building industry. G-SEED(Green Standard for Energy & Environmental Design) developed in Korea have been reinforcing, and a number of projects certifying the G-SEED have been increasing continuously. As a demand of G-SEED certification is rising, a question on the additional cost data as certifying G-SEED is rising. It is because additional cost as getting the certification is important fact for G-SEED level decision and whether getting the certification or not. Therefore, this study analyzed additional construction cost as certifying G-SEED through performance improvement and design change of general office building not to get G-SEED. In conclusion, an additional construction cost ratio of G-SEED projects to the reference building is drawn as certified level; +0.26%, silver level; +2.29%, gold level; +3.89%, and platinum level; +5.48%.

Estimation of Home-visiting Care Costs for Low-income Elderly with Chronic Disease in a Metropolitan City Using the Severity Classification and ABC(active-based costing) (대도시 저소득층 만성질환 노인을 위한 가정.방문간호 원가산정 - 환자 중증도 및 활동기준원가계산법(ABC) 적용 -)

  • Kang, Sung-Ye
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.14 no.2
    • /
    • pp.118-130
    • /
    • 2008
  • Purpose: The purpose of this study was to estimate of home-visiting nursing costs for low-income elderly with chronic disease in a metropolitan city using the severity classification and ABC(active-based costing). Methods: First, the HHC activity pool was established. The performance time of each nursing activity were estimated. Second, nursing resources(labor costs, operating costs, and traffic expenses) were analyzed and nursing cost per minute was calculated. And then the cost of each activity was estimated. Third, 202 visiting cases were classified into three group by their severity. And then nursing cost per visit according to their severity was estimated. Results: 59 nursing activities were included in HHC activity pool. The average working time of 59 nursing activity was 6.7minutes and nursing cost per minute was 489 won. According severity, nursing cost per visit were in class I, 54,296 (won), class II 83,124(won), and class III 93,455(won).

  • PDF

The Life Cycle Cost Estimation using the Maintenance Information of a Propulsion Control System in the High Speed Train(KTX-1) (고속철도차량(KTX-1) 추진제어장치의 유지보수정보를 이용한 수명주기비용 예측)

  • Kim, Jae-Moon;Yun, Cha-Jung;Kim, Yang-Su;Jang, Jin-Yeong;Lee, Jong-Seong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2176-2181
    • /
    • 2011
  • This paper estimates the life cycle cost(LCC) of a propulsion control system using the maintenance information in the high speed train(KTX-1). Life cycle costing is one of the most effective approaches for the cost analysis of long-life systems such as the KTX-1. Until now, most life cycle cost of the system has been studied as a whole system viewpoint. But in case of railway industry, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. This paper proposes the life cycle cost model which fitted to estimate life cycle cost (LCC) using maintenance information manual. As a result, LCC on propulsion control system increased moderately expect for periodical time when major parts are replaced at the same time. Results will be reflected in the development of domestic products.

Analysis of the Robot for Detection of Improvised Explosive Devices and a Technology for the CNT based Detection Sensor (급조 폭발물(IED) 제거 로봇의 개발비용 분석 및 카본나노튜브 기반 탐지센서기술에 관한 연구)

  • Kwon, Hye Jin
    • Journal of the Semiconductor & Display Technology
    • /
    • v.17 no.1
    • /
    • pp.54-61
    • /
    • 2018
  • In this study, two aspects were analyzed about the robot for removal of explosive devices. First, the cost analyses were performed to provide a reasonable solution for the acquirement of the system. It is processed by an engineering estimate method and the process was consisted of two ways : a system development expense and a mass production unit price. In additions, the resultant cost analyses were compared between the cases excluding and including a mines detection system. As results, in the case of the acquirement of the robot system for removal of explosive devices, it is recommended that the performance by improving the mines detection ability should be considered preferentially rather than the cost because the material cost for the mines detection system is negligible compared to the whole system cost. Second, as a way for improving the system performance by the mine detection function, the carbon nanotube (CNT) based sensor technology was studied in terms of sensitivity and simple productivity with presenting its preliminary experimental results. The detection electrodes were formed by a photolithography method using a photosensitive CNT paste. As results, this method was shown as a scalable and expandable technology for the excellent mines detection sensors.

Smoking Attributed Economic Burden of Stroke Using Disability Grades (장애등급 분포를 활용한 흡연에 의한 뇌졸중 질병부담비용 측정)

  • Suh, Youshin;Ahn, Jeonghoon
    • The Journal of Health Technology Assessment
    • /
    • v.6 no.2
    • /
    • pp.106-113
    • /
    • 2018
  • Objectives: The purpose of the study was to estimate the economic burden of stroke in Korea using post stroke disability grades and to measure smoking attributed economic burden. Methods: The disability grade of stroke patient was assessed for stroke patients who did not have a history of stroke before from a large cohort study in Korea. Treatment costs of patients were estimated by the National Health Insurance Service annual statistical report and care cost was estimated by the need of care defined by the assessed disability grades of patients. The population attributable fraction from WHO was used to calculate the proportion of cost due to smoking. Results: The study revealed that the cost of the stroke in 2015 was about 3.228 trillion won, while the care-giver cost was approximately 176 billion won. The cost of the smoking attributed stroke was about 724 billion won. Conclusion: This study is useful for estimating the cost of smoking considering the post-stroke disability and the results is important for achieving the national goal of extending healthy life from the Fourth National Health Promotion Plan.

INTEGRATED LIFE-CYCLE COST ANALYSIS CONSIDERING ENVIRONMENTAL COSTS: A HIGHWAY PROJECT CASE

  • Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.273-279
    • /
    • 2011
  • Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.

  • PDF

The evaluation of cost-of-illness due to use of cost-of-illness-based chemicals

  • Hong, Jiyeon;Lee, Yongjin;Lee, Geonwoo;Lee, Hanseul;Yang, Jiyeon
    • Environmental Analysis Health and Toxicology
    • /
    • v.30 no.sup
    • /
    • pp.6.1-6.4
    • /
    • 2015
  • Objectives This study is conducted to estimate the cost paid by the public suffering from disease possibly caused by chemical and to examine the effect on public health. Methods Cost-benefit analysis is an important factor in analysis and decision-making and is an important policy decision tool in many countries. Cost-of-illness (COI), a kind of scale-based analysis method, estimates the potential value lost as a result of illness as a monetary unit and calculates the cost in terms of direct, indirect and psychological costs. This study estimates direct medical costs, transportation fees for hospitalization and outpatient treatment, and nursing fees through a number of patients suffering from disease caused by chemicals in order to analyze COI, taking into account the cost of productivity loss as an indirect cost. Results The total yearly cost of the diseases studied in 2012 is calculated as 77 million Korean won (KRW) per person. The direct and indirect costs being 52 million KRW and 23 million KRW, respectively. Within the total cost of illness, mental and behavioral disability costs amounted to 16 million KRW, relevant blood immunological parameters costs were 7.4 million KRW, and disease of the nervous system costs were 6.7 million KRW. Conclusions This study reports on a survey conducted by experts regarding diseases possibly caused by chemicals and estimates the cost for the general public. The results can be used to formulate a basic report for a social-economic evaluation of the permitted use of chemicals and limits of usage.