• Title/Summary/Keyword: erection stage

Search Result 42, Processing Time 0.049 seconds

No Root Cap Horizontal Butt-welding with MAG Process

  • Jang, T.W.;Cho, S.H.;Park, C.G.;Lee, J.W.;Woo, W.C.
    • International Journal of Korean Welding Society
    • /
    • v.3 no.1
    • /
    • pp.34-38
    • /
    • 2003
  • It has been used many kinds of horizontal butt-welding methods at block-to-block erection stage in shipbuilding companies. For examples, some companies use conventional FCAW process with one side or both sides groove joint welding, others use carriage with torch holder type mechanized welding method. Although lots of efforts were done until now, some problems in quality and productivity still remain in ship's hull welding. In this study, we have attempted to raise productivity and quality on horizontal position of welding with following 3 items. 1) Prepare groove condition with no root gap for making easy fit-up work. 2) Develop improved MAG (100% $CO_2$ gas shielding) welding process with solid wire for making sound root bead from one side. 3) Develop and apply quite new automatic welding carriage. The stability of new welding process was confirmed by conducting mechanical tests of weldments to verify the soundness of weldments.

  • PDF

A Study on the Design Development and Construction Process in British Airways London Eye (런던아이의 디자인 전개와 건립과정에 관한 연구)

  • Woo, Dae-Seung
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

A Study on the Total, Particle Size-Selective Mass Concentration of Airborne Manganese, and Blood Manganese Concentration of Welders in a Shipbuilding Yard (조선업 용접작업자의 공기 중 총 망간 및 입경별 망간 농도와 혈중 망간농도에 관한 연구)

  • Park, Jong Su;Kim, Pan Gyi;Jeong, Jee Yeon
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.25 no.4
    • /
    • pp.472-481
    • /
    • 2015
  • Objectives: Welding is a major task in shipbuilding yards that generates welding fumes. A significant amount of welding in shipbuilding yards is done on steel. Inevitably, manganese is present in the base metals being joined and the filler wire being used and, consequently, in the fumes to which workers are exposed. The objective of this work was to characterize manganese exposure associated with work area, total and particle size-selective mass concentration, and compare the mass concentrations obtained using a three-piece cassette sampler, size-selective impactor sampler and blood manganese concentrations. Materials: All samples were collected from the main work areas at one shipbuilding yard. We used a three piece cassette sampler and the eight stage cascade impactor sampler for the airborne manganese mass concentration of total and all size fractions, respectively. In addition, we used the results of health examination of workers sampled for airborne manganese. Results: The oder of high concentration of airborne manganese in shipbuilding processes was as follows; block assembly, block erection, outfitting installation, steel cutting, and outfitting preparation. The percentages of samples that exceeded the OES of the ministry of employment and labor by the cassette sampling method was 12.5%, however 59.1% of sampled workers by the impactor sampling method exceeded the TLV of the ACGIH. Conclusions: Even though the manganese concentrations in blood of workers exposed to higher airborne manganese concentration were higher than among those exposed to lower concentrations, there was no difference in blood manganese concentrations among work duration. The data analyzed here by characterizing size-selective mass concentrations indicates that the inhaled manganese of welders in shipbuilding yards could be mostly manganese-containing respirable particle sizes.

Evaluation of Torsional Behaviour for the Catwalk System on A Suspension Bridge by Cross Bridge Interval (크로스 브릿지 간격에 따른 캣워크 시스템의 비틀림 거동 평가)

  • Lee, Ho;Kim, Ho Kyung;Kim, Gi Nam
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.4
    • /
    • pp.371-376
    • /
    • 2015
  • This study was conducted for the torsional behavior of catwalk system which is a temporary structure on a suspension bridge. The torsional deformation of the catwalk structure has a significant effect on the workability and safety of workers during main cable erection. For this reason, the torsional deformation of catwalk is controlled to be acceptable levels below by adjusting the cross bridge interval in design stage. This study analyzed the effect of separation between cross bridge associated with twist safety of catwalk system. For the analytical approach, a detailed analysis model was created including cross bridge. Both wind load within the wind velocity range that allows the construction and eccentric load of Prefabricated Parallel Wire Strand were analyzed by analysis model. Result of study shows that separation between cross bridges has a significant effect on the torsional behavior of the catwalk.

The Development and Application of Intelligent Welding Carriage with High Deposition Rate by 3-D Weaving (3차원 위빙 대용착 지능 용접캐리지 개발 및 적용)

  • Kim, Young-Zoo;Cho, Bang-Hyun;Amit, Amit;Lee, Sang-Bum;Lee, Weon-Gu;Kim, Jin-Yong;Huh, Man-Joo
    • Proceedings of the KWS Conference
    • /
    • 2010.05a
    • /
    • pp.65-65
    • /
    • 2010
  • In shipbuilding industry, welding position are usually flat and vertical position at the erection stage. Application of SAW and EGW for these positions makes it possible to achieve enhanced productivity and high quality. But owing to their large size and weight it is difficult to apply these techniques in short and narrow regions. To overcome this problem, our company developed light weight and compact size 4-axis welding carriage which perform 3D weaving. The purpose of this study is to explain the development and application of intelligent welding carriage using 3D weaving pattern that can fill a large amount of welds and thereby making it possible to achieve high quality of welding. This study shows 3D weaving pattern, development of weaving database, and skill of adaptive control response for the variable gap. Also, it shows the results of procedure qualification test for the AH-grade steel when applied to the intelligent welding carriage.

  • PDF

The Development and Application of Intelligent Welding Carriage with High Deposition Rate by 3-D Weaving (3차원 위빙 대용착 지능 용접캐리지 개발 및 적용)

  • Kim, Young-Zoo;Cho, Bang-Hyun;Amit, Amit;Lee, Sang-Bum;Lee, Weon-Gu;Kim, Jin-Yong;Huh, Man-Joo
    • Journal of Welding and Joining
    • /
    • v.28 no.2
    • /
    • pp.32-38
    • /
    • 2010
  • In shipbuilding industry, welding position are usually flat and vertical position at the erection stage. Application of SAW and EGW for these positions makes it possible to achieve enhanced productivity and high quality. But owing to their large size and weight it is difficult to apply these techniques in short and narrow regions. To overcome this problem, our company developed light weight and compact size 4-axis welding carriage which perform 3D weaving. The purpose of this study is to explain the development and application of intelligent welding carriage using 3D weaving pattern that can fill a large amount of welds and thereby making it possible to achieve high quality of welding. This study shows 3D weaving pattern, development of weaving database, and skill of adaptive control response for the variable gap. Also, it shows the results of procedure qualification test for the AH-grade steel when applied to the intelligent welding carriage.

Camber Reconstruction for a Prefab PSC Girder Using Collocated Strain Measurements (병치된 변형률 계측치를 이용한 프리팹 PSC 거더 캠버 재구성)

  • Kim, Hyun Young;Ko, Do Hyeon;Park, Hyun Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.151-162
    • /
    • 2022
  • Prefab members have attracted attention because they can be mass-produced in factories through smart construction technology. For prefab prestressed concrete girders, it is important to manage the shapes of the girders properly from production to the pre-installation stage for consistency with the prefab floor plate during the erection process. This paper presents a camber reconstruction method using collocated strain measurements from the top and bottom of the prefab girder. In particular, the camber reconstruction method is applied to measured strain data in which the time-dependent behavior of concrete is considered after the introduction of prestress. Through Monte Carlo numerical simulations, the statistical accuracy of the reconstructed camber for a limited number of sensors, measurement errors, and nonlinear time-dependent behaviors are analyzed and validated.

Comparative Analysis Between MBT Shoes(Functional walking shoes) and General Sporting Shoes for the Muscle Activity and Energy Consumption (보행용 MBT신발과 일반 신발 보행 시 에너지 소비량과 근 활성도의 비교 분석)

  • Yoon, Bum-Chul;Kang, Se-Yong;Kim, Yae-Jung;Yu, Min-Ho;Lee, Mi-Jung;Kim, Nan-Soo
    • Journal of Korean Physical Therapy Science
    • /
    • v.13 no.3
    • /
    • pp.65-75
    • /
    • 2006
  • This study was to find out whether MBT shoes were more effective than general sporting shoes on the kinematic physiology. We comparatively analyzed energy consumption, heart rates, rating of perceived exertion, lactic acid density in blood and muscle activity with EMG. The subjects were 10 regular students of K Univ.(5 male and 5 female). They wore the general sporting shoes for stage 1(group 1), the MBT walking shoes for stage 2(group2) under the same conditions. There was one week interval between stages. 1. There was no significant difference in the energy consumption and the heart rates between two groups. Group 1 showed a higher energy consumption and heart rates than Group 2 under the speed of 4.0 mph. On the other hand, Group 2 showed higher ones over the speed of 4.0 mph. 2. There was no significant difference in the rating of perceived exertion and lactic acid density in blood between two groups. But Group 2 showed a lower fatigue strength than Group 1. 3. Group 2 showed a higher muscle activity with EMG than group 1, especially at the speed of 2.0, 2.5, 3.0, 3.5 mph in quadratus lumborum muscle and at 4.0mph in tibialis anterior muscle. In conclusion, we are less tired in MBT shoes than in general sporting shoes. Also, we can dorsiflex better in the ankle joint, straighten the lumbar region well and walk erect in MBT shoes. Specially, when it walks slowly, it is favorable in an erection walk and when it walks quickly, we have advantage of obesity management.

  • PDF

A Study on Application of GPS for Deflection Management of Curved PCT Girder Bridge under Construction (시공 중 곡선형 PCT 거더교의 처짐 관리를 위한 GPS 적용 연구)

  • Kyu Dal, Lee;Jin Duk, Lee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.33 no.5
    • /
    • pp.453-461
    • /
    • 2015
  • In order to manage the deflection of a curved PCT girder bridge during construction, a GPS receiver was installed at the spot predicted to be the weak point during the incremental launching so as to measure the deflection at each construction stage. The deflections obtained in the experiment were compared with those derived from the monitoring of stress, temperature and inclination. The comparative analysis of the GPS measurement and analytical values obtained from finite element modeling with respect to the launching distance showed that the measured values differ by 0.6 to 1.6 times to the analytical results. This difference could be significantly reduced by thermal calibration. From the analysis of the behavioral pattern of the bridge, deflection occurred during construction in the concrete tip due to the deflection at the head of the nose at the 95m and 75m-spots, and compression and tension developed respectively at the compression weak zone and tension weak zone. The application of GPS appeared to enable more efficient management of the deflection during the erection of the curved PCT girder bridge and is expected to be helpful for the prediction and management of the behavior in future ILM construction sites.

The Significance of Independence Park in Korean Landscape Architectural History (독립공원의 조경사적 의의)

  • Lee, Yoo-Jick
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.1
    • /
    • pp.103-115
    • /
    • 2008
  • This paper investigates the historical significance of Independence Park in Korean landscape architecture by examining the idea and goal, master plan and scheme, and meaning and limitation of the park The construction was announced in July and began with the Independence Arch in the middle of September, 1896. Dr. Philip Jaisohn (Suh Jai-Pil), Counselor of The Privy Office and president of the Independence newspaper, played an important role in park construction. He formally advised the arrangements and general planning of the park, but he actually played a leading role in the park as much as he designed and superintended the erection of the arch. He had the conception of a productive park for cultivating and experimenting with a variety of trees surrounding the monument. In terms of the history of Korean landscape architecture, Independence Park is important in that it is the first modem city park that was tried independently as part of the modernizing-Seoul project and the only park of which object and scheme were revealed. It also strengthens the roots of Korean modem landscape architecture by pushing Korean history of public parks into the prior time to Japanese colonial period and enriches the contents of Korean modem landscape architecture. Independence Park is the original realization of a public park because it was constructed with participation and donations from the planning stage to the construction and use. In addition, it is the goal and means to inspire the spirit of national independence and patriotism in Korean people and lead them to voluntary awakening, enlightenment, and participation. Independence Park, however, was not constructed according to Dr. Jaisohn's original intent due to the lack of funds and the rudimentary level of landscape construction technology. In addition, the location was too far from downtown and accessibility was very difficult. For these reasons, many do not consider the park as having been constructed. However, this kind of view must be changed. Other parks of the time were not detailed and decorated like typical western parks, but were left as public spaces. In other words, these parks should not be judged by comparing them to western parks. This is the same concept as that of the first parks of modem Korea being called 'park land.' These parks were more natural environments than planned gardens.