• Title/Summary/Keyword: erection

Search Result 338, Processing Time 0.026 seconds

Bridge widening with composite steel-concrete girders: application and analysis of live load distribution

  • Yang, Yue;Zhang, Xiaoguang;Fan, Jiansheng;Bai, Yu
    • Advances in concrete construction
    • /
    • v.3 no.4
    • /
    • pp.295-316
    • /
    • 2015
  • A bridge widening technology using steel-concrete composite system was developed and is presented in this paper. The widened superstructure system consists of a newly built composite steel-concrete girder with concrete deck and steel diaphragms attached to the existing concrete girders. This method has been applied in several bridge widening projects in China, and one of those projects is presented in detail. Due to the higher stiffness-to-weight ratio and the rapid erection of composite girders, this widening method reveals benefits in both mechanical performance and construction. As only a few methods for the design of bridges with different types of girders are recommended in current design codes, a more accurate analytical method of estimating live load distribution on girder bridges was developed. In the analytical model, the effects of span length, girder pacing, diaphragms, concrete decks were considered, as well as the torsional and flexural stiffness of both composite box girders and concrete T girders. The study shows that the AASHTO LRFD specification procedures and the analytical models proposed in this paper closely approximate the live load distribution factors determined by finite element analysis. A parametric study was also conducted using the finite element method to evaluate the potential load carrying capacities of the existing concrete girders after widening.

Perforated TWCF steel beam-columns: European design alternatives

  • Baldassino, Nadia;Bernardi, Martina;Bernuzzi, Claudio;Simoncelli, Marco
    • Steel and Composite Structures
    • /
    • v.35 no.5
    • /
    • pp.701-715
    • /
    • 2020
  • Steel storage racks are lightweight structures, made of thin-walled cold-formed members, whose behaviour is remarkably influenced by local, distortional and overall buckling phenomena, frequently mutually combined. In addition, the need of an easy and rapid erection and reconfiguration of the skeleton frame usually entails the presence of regular perforations along the length of the vertical elements (uprights). Holes and slots strongly influence their behaviour, whose prediction is however of paramount importance to guarantee an efficient design and a safe use of racks. This paper focuses on the behaviour of isolated uprights subjected to both axial load and bending moments, differing for the cross-section geometry and for the regular perforation systems. According to the European standards for routine design, four alternatives to evaluate the bending moment-axial load resisting domains are shortly discussed and critically compared in terms of member load carrying capacity.

Quality Verification of Legacy Data of Manufacturing Information System to Improve Results of Shipyard Manufacturing Logistics Simulation (조선소 생산물류 시뮬레이션 결과 정도 향상을 위한 생산정보시스템 기간 정보 검증)

  • Lee, Jonghak;Lee, Philippe;Yoon, Kyungwon;Nam, Jong-Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.6
    • /
    • pp.510-520
    • /
    • 2014
  • Unlike other mass production in small variety, shipbuilding process is a project-based method in single variety, which causes unpredictable volatility in the planning system. In shipyards, series of manufacturing processes from fabrication to erection is sequentially carried out. In order to predict unfavorable changes such as overload or low load of working volume, computerized simulation has been being gradually adopted. The data used in the simulation are processed from the database of the main scheduling and planning system. Thus the quality of those data is very crucial for the meaningful results. Unfortunately, research on the verification of data quality is very rare and hardly known to the authors. In this work, using the database of scheduling and product information system of a large domestic shipyard, the data required for the simulation are qualitatively analyzed and verified.

Establishing Methodology for Simulation-based Ship Design and Construction Using Virtual Manufacturing Technologies (가상생산기술을 이용한 시뮬레이션 기반의 선박설계 및 생산체계의 수립)

  • Kim, Hong-Tae;Lee, Jong-Gap;Hwang, Kyu-Ok;Jang, Dong-Sik
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.230-240
    • /
    • 2002
  • Information technologies centered on the internet in the area of shipbuilding and marine engineering further incur the needs to increase the flexibility of the organization, the dispersion of work process, and the use of out sourcing, as well as the globalization of related market. In near future, electronic commerce and concurrent engineering based on CALS/EC and the Internet will be an integral part of the environment and upon these changes, ship design and construction will become a computer supported cooperative work of many dispersed and specialized groups. As the means of active response to these environmental changes, many new concepts such as digital shipbuilding, virtual shipyard, and simulation based design are appearing. In this paper, the concept and current status of digital manufacturing in general manufacturing industry will be reviewed. Then, related technologies, area of application and methods of digital manufacturing in shipbuilding and marine industries are presented. In addition, virtual assembly simulation system for shipbuilding(VASSS), a tool for crane operability and block erection simulation in virtual dock based on 3D product model, will be introduced.

A Study on Zoning Model Using Web-Cyclone (웹사이클론을 이용한 조닝모듈 개발에 관한 연구)

  • Gwak, Han-Seong;Son, Chang-Back;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.115-117
    • /
    • 2012
  • Task based modeling is essential in a construction operation simulation modeling. It allows dealing with local variables or delay factors that affect productivity and improves the reusability of existing operation models. An operation model can secure reality only if it reflects the real construction processes by effectively dealing with zoning issue. However, system users have some difficulties in modeling a construction operation that is consisted of several processes having different production units. Zoning is a major modeling issue when the task based modeling method is implemented using the existing discrete event simulation systems. This paper highlights the difficulty and presents a new method that complements the zoning issues attributed to different production units. The method is described in detail by presenting the flow of entities. It is confirmed that the zoning method effectively deals with the unbalance of production units between processes and facilitates to model an operation model having processes with different production units. The "Zoning module" contributes to increasing accuracy of simulation result.

  • PDF

A Study on Effect of Coating Stain on the Performance of Electric Cable (도장 오염이 Electric Cable의 성능에 미치는 영향 연구)

  • Cho, Yeon-Ho;Lee, Sang-Hyeok;Son, Young-Shuk
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.18-23
    • /
    • 2009
  • After the installation of electric cables at block, PE(pre-erection) and hull stages, the coating stains on the electric cable sheath were unavoidably occurred by additional painting process. According to class rules paint or coating applied on the electric cables shall not adversely affect the mechanical, chemical of fire resistant characteristics of the electric cable sheath. However, there has not been quantitatively studied about the effect of coating stains on properties of sheath materials. In this study, we tried to investigate the effect of coating stains on the performance and deterioration of sheath materials by using FTIR, SEM analysis, flame retardant, high potential voltage and tensile test. The results sowed that coating stains, which were occurred during painting work on site could not adversely affect on the performance and deterioration of sheath materials.

  • PDF

A Study on the Planning of Cultural Art Center in Small City (소도시 문예회관 계획에 대한 연구 - 홍성군 광천복지문예회관을 중심으로 -)

  • Han, Jong-Koo;Jang, Dong-Min
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.11 no.1
    • /
    • pp.1-8
    • /
    • 2009
  • The study performed literature survey and research on the actual condition of cultural facilities for planning a reasonal architectural plan of being prearranged Gwangcheon cultural art center erection at the old central district of Gwangcheon-Eup(town) in Hongseong-Gun(County), Chuncheongnam-Do(province). It was verified that the law and regulations related with cultural art facilities did not make clear statement of the concept of cultural art center and classified it as a public performing place of a kind of performance facilities. The types of cultual facilities could be classified as performance facilities, libraries, regional cultural welfare facilities, cultural promotion and instruction facilities and they were studied respectively. The main functions of cultural art center was studied with art enjoyment function and art creation function. Through the research on the actual condition of cultural facilities, it was found that there were 12 cultural welfare facilities in Hongseong-Gun(county) however there was no cultural facilities in Gwangcheon-Eup(town) except 1 libraries. So the building of Gwangchoen cultural art center is needed. The location Propriety analysis is conducted and proved appropriated. On the basis of the above studies, the direction of planning, conception of Plan and facilities program were conceived and finally the architectural plans were proposed.

  • PDF

조선 중일정계획시스템을 위한 공정계획 객체 설계에 관한연구

  • 최해주;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.290-293
    • /
    • 2001
  • The mid-schedule planning of the ship is making a schedule about the process from cutting to erection. The ship consists of lots of blocks. This block has different process because of the shape of the block varies in accordance with the ship-type and the part position of the ship. The type and order of each block process initially must be generated for the mid-schedule planning. In this paper, the process planning, described as above is preparing the basic information before scheduler make a plan with the prepared manhour. The scheduling is done with this process planning which includes the information of the process order. This paper shows the research about three methods to design the process planning. First, investigate the expression method about information of the process planning for the mid-schedule planning in real workplace. Second, design the object of the process planning on the basis of investigating the expression method. Finally, develop the prototype of object on the basis of this designed process planning and then find the practical use in the mid-schedule planning. The object, which is developed in this paper, contains the main algorithm. In case of developing The Mid-Schedule Planning System, this object is expected to be utilized very easily as consisting another object.

  • PDF

Time-Dependent Nonlinear Analysis of Cable-Supported Prestressed Concrete Frames (케이블로 지지된 PC뼈대의 시간의존적 비선형 해석)

  • Lee, Jae Seok;Kang, Young Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.4
    • /
    • pp.33-47
    • /
    • 1992
  • A study for the material and geometric nonlinear analysis of segmentally erected cable-supported prestressed concrete plane frames including the time-dependent effects due to load history, creep, shrinkage, aging of concrete, and relaxation of prestressing steel and cable is presented. Updated Lagrangian formulation is used to account for the nonlinear behavior of the structure. For the time-dependent analysis. the time domain is divided into a discrete number of intervals, and a step-forward integration is performed as the solution progresses in the time domain. At each time step. a nonlinear finite element analysis is performed in the space domain. Segmental erection methods are implemented by providing the capability to change the configuration of the structure at any time step of the solution. The computer program CFRAME is developed and a series of numerical examples are presented to study the validity of the program.

  • PDF

Bay and Machine Selection for the Parts Fabrication of Ship Hull Construction (조선 선각가공공정에서 부재가공을 위한 Bay 및 가공기계의 선택)

  • Park, Chang-Kyu;Seo, Yoon-Ho
    • IE interfaces
    • /
    • v.12 no.3
    • /
    • pp.395-400
    • /
    • 1999
  • Shipbuilding process is composed of hull construction, in which the structural body of a ship is formed, and outfitting, in which all the non-structural parts such as pipes, derricks, engines, machinery, electrical cable, etc. are manufactured, added and assembled. Hull construction can be classified into parts fabrication, block assembly and hull erection. Among them, the parts fabrication is the first manufacturing stage that produces components or zones needed for block assembly and hull construction. More specifically, the parts fabrication is performed through machining processes including marking, cutting, pressing, and/or forming. When material is entering into the parts fabrication stage, it is important for achieving the total efficiency of production to select one of production division, so-called 'bay,' as well as machine tools on which the part is fabricated. In this paper, given production quantities of parts in the fabrication stage, the problem is to optimally select machine tools and production division, such that the total flow-time is minimized as well as the workload among machines is balanced. Specifically, three mathematical models for flow-time minimization, load balance, and simultaneously considering both objectives, and a numerical example are analyzed and presented.

  • PDF