• Title/Summary/Keyword: environmental project

Search Result 2,410, Processing Time 0.034 seconds

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

Effects of Eco-Friendly School Project Activity on Middle School Students' Environmental Awareness (친환경학교 가꾸기 프로젝트 활동이 중학생의 환경 인식에 미치는 영향)

  • Son, Mi-Hee;Park, Hye-Gyeong;Cheong, Cheol
    • Hwankyungkyoyuk
    • /
    • v.24 no.3
    • /
    • pp.34-43
    • /
    • 2011
  • Project-based learning is an innovative approach to learning that teaches a multitude of strategies critical for success in the twenty-first century. Students drive their own learning through inquiry activity, as well as work collaboratively to research and create projects that reflect their knowledge. The purpose of this study was to investigate the effects of eco-friendly school project activity which is applied from one of project-based learning approach on learning outcomes of students in ninth-grade environment course in middle school. The participants were given a questionnaire before and after the environmental project activities. In solving the school environment issues themselves, students have practiced invaluable problem solving skills. This study indicates that school students' awareness about the environment has positively changed by experiencing the eco-friendly school project. In addition, this project affects students' variety of environmental awareness. This project could be applied to school environmental education programs and to environment lessons, developmental activities or club activities for a positive impact on students' environmental awareness.

  • PDF

A Study on The Prior Environmental Review System in a Costal Improvement Project (연안정비사업의 사전환경성검토 방안에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.179-187
    • /
    • 2010
  • A costal improvement project is designed for preventing disasters on the coast, improving costal environment, and promoting costal functions, so it is different from the one for developing coasts. However, the costal improvement project also affects the surrounding environment and it may damage the costal environment in some cases. In line with this, this study was carried out to provide the guideline to the review on environmental conditions, which should be performed in the stage of establishing the plan for a costal improvement project, so that the influence affecting marine environment can be reduced and more efficient coastal project can be planned. The costal improvement project is different in the degree of affecting the costal environment according to kinds, scales, and regions. Accordingly, in this study the state of the coastal improvement project and involved problems were analyzed. The prior environmental review system was divided into a seawall-installation project, a marine construction such as the installation of submerged breakwater and jetties, and a project for creating water-friendly coast including a park without marine landfill. The main items for reviewing these specific projects were presented.

Evaluation of Health Benefit from the Environmental Health Action Program Based on the Environmental Burden of Disease (환경성 질병부담을 활용한 생활공감 환경보건기술개발사업 건강 편익 평가 및 제언)

  • Choi, Yongsoo;Byun, Garam;Lee, Jong-Tae
    • Journal of Environmental Health Sciences
    • /
    • v.48 no.2
    • /
    • pp.123-129
    • /
    • 2022
  • Background: The Environmental Health Action Program was a national project carried out from 2012~2021. It was aimed at developing public technologies to protect people's health from various environmental hazards. Objectives: One of the final goals of the project was "creating health benefits worth more than 179.2 billion won by reducing the environmental burden of disease." This study aims to evaluate whether the program sufficiently achieved the planned benefits. Methods: In order to secure consistency in evaluation, we applied the same equation used in the goal-setting process. It is comprised of six parameters to estimate the benefit: 1. The amount of medical expenses for environmental diseases; 2. The attributable proportion of environmental risk factors' 3. The rate of reduction in medical expenses for environmental diseases; 4. R&D project contribution; 5. The proportion of successful policy reflection; and 6. The contributions of the project. The corresponding variables were estimated at the end of the project, and the health benefits of the project were recalculated using the newly estimated variables. Results: It was estimated that a total of 195 billion won in health benefits occurred or will occur from 2015 to 2026. The main contributors for achieving the target were an increase in medical expenses for environmental diseases, a high score in the R&D project contribution, and the proportion of successful policy reflection. Conclusions: Technically, the equation used in the project is about medical expenses for environmental diseases rather than about the environmental burden of disease. There are several benefits of using the environmental burden of disease in the evaluation of public health policies. In further studies, developing a policy evaluation framework using indicators such as population attributable fraction would be needed.

Study on the Certificate System of the EIA Project Manager through Collaborative University Curriculum in Korea (한국에서 대학교과과정과 연계된 환경영향평가사 자격부여에 관한 연구)

  • Kim, Im-Soon;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.1
    • /
    • pp.81-95
    • /
    • 2008
  • The study is intended to develop the measures to introduce the Environmental Impact Assessment (EIA) project manager (Environmental Assessor), who will be responsible for leading the EIA task. This role requires a quality standard of expertise in the area of natural science, social science, knowledge and technology on environment design mechanism, and the integrated approaches that combine the relevant policies and systems. To facilitate the system, the certificate will be given to the person who is well acquainted with the knowledge on EIA with relevant experiences, thereby authorizing them to coordinate the assessment task for reliable outcome. Hence, the need for introducing the system is very crucial. The EIA project manager, as a guide for an EIA project team, shall be the person who has a comprehensive understanding of the project, the knowledge about the principal for implementation of EIA and the expertise in structuring the management system, with a skill to maintain the good relationship with the people engaged in the project. To that end, it is highly recommended to set up such a certificate system to be incorporated in the college curriculum.

The Analysis of Environmental Education Related to Science in Primary School between in Korea and Canada (한국과 캐나다의 초등학교 환경교육 관련 과학교육 내용의 비교 분석)

  • 김경옥;정완호
    • Hwankyungkyoyuk
    • /
    • v.11 no.2
    • /
    • pp.212-223
    • /
    • 1998
  • The main results of this study were as follows :(1) the more objectives for environmental education in science textbooks of Korea were focused on “awareness of the environment”. While the objectives of the Project WILD of Canada were balanced between each objectives. (2) the more environmental skills in science textbooks of Korea were focused on ‘observation’ and ‘description’, while the environmental skills of the Project WILD of Canada for environmental education focused on ‘analysis’ and ‘observation’. The environmental skills for the environmental education in the science textbooks of Korea were concentrated on ‘observation ’ and ‘description’, while the Project WILD of Canada were balanced between each skills for investigating the environment and the environmental problems. (3) the instructional procedures in science textbooks of Korea for the environmental education were very similar between each activities of the science textbooks, while the instructional procedures of the Project WILD of Canada were very different, and these procedures were very useful for educating the environmental behaviors.

  • PDF

The Concept and the Meaning of Project-Based Learning for Sustainable Development (지속가능발전 이해를 위한 프로젝트 학습의 개념과 의미 - 예비교사의 에코캠퍼스 만들기 프로젝트 경험을 중심으로-)

  • Nam, Young-Sook;Ji, Seung-Hyun
    • Hwankyungkyoyuk
    • /
    • v.24 no.2
    • /
    • pp.21-34
    • /
    • 2011
  • Recently, project activity on environmental education has been overwhelmingly presented that is considered as a key learning & teaching strategy in Korea. This Study finds that Environmental project activity requires consideration of project-based Learning for sustainable development. The purpose of this study is to conduct project-based learning for eco-campus which is focused on sustainable development and to find out the learner's understanding sustainable development. The results of this study can be summarized as follows. First, project-based learning for sustainable development is concerned about enhancing learner's understanding sustainable development. It can be emphasized a viewpoint of sustainable way, a way of educational approach, and a possibility of expanding learner's experience in dealing with sustainable development. Second, this study showed also a results of application about project-based learning for eco-campus. Twenty three pre-service teachers conducted six different eco-campus projects. It is considered to make the student be able to catch up core knowledge and apply it during the project activity. In conclusion, this research asserts that project-based learning on sustainable development is needed to make students see the knowledge and value of sustainable development. It is considered to advance education for sustainable development as a new teaching & learning strategy.

  • PDF

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

Analysis of Environmental Impact Statement (환경영향평가서 분석)

  • Lee, Jae-Woon;Chang, Chun-Ki;Kwon, Myeong-Hee;Bang, Kyu-Chul;Jeong, Dong-Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.2
    • /
    • pp.77-84
    • /
    • 1994
  • The study is to analyze the contents of Environmental Impact Statement(EIS) and supplementary EIS prepared from 1981 to 1992. The contents are project area, project cost, EIS volume, project term, assessment term, EIS preparation cost, land use plan, and kinds of predictive model concerning air quality, water quality, noise and vibration etc. by project type. Data are collected with EIS analysis checklist and analyzed by $SPSS/PC^+$.

  • PDF