The energy conservation theory is introduced for investigating processes of runoff and soil erosion on the hillslope system changed vegetation condition by wildfire The rainfall energy, input energy consisted of kinetic and potential energy, is influenced by vegetation coverage and height. Output energy at the outlet of hillslope is decided as the kinetic energy of runoff and erosion soil, and mechanical work according to moving water and soil is influenced dominantly by the work rather than the kinetic energy. Relationship between output and input energy is possible to calculate the energy loss in the runoff and erosion process. The absolute value of the energy loss is controlled by the input energy size of rainfall because energy losses of runoff increase as many rainfall pass through the hillslope system. The energy coefficient which is dimensionless is defined as the ratio of input energy of rainfall to output energy of runoff water and erosion soil such as runoff coefficient. The energy coefficient and runoff coefficient showed the highest correlation coefficient with the vegetation coverage. Maximum energy coefficient is about 0.5 in the hillslope system. The energy theory for output energy of runoff and soil erosion is presented by the energy coefficient theory associated with vegetation factor. Also runoff and erosion soil resulting output energy have the relation of power function and the rates of these increase with rainfall.
This paper introduces an approach to identify the total energy consumption with subsequent $CO_2$ emissions, for both industrial and non-industrial sectors. Statistical data for 2005 were compiled in a national account system to construct an energy input-output table for investigating the influence between energy demand and supply activities. The methodological approach was applied to South Korea. Twelve types of energy and fifteen industrial and non-industrial sectors are formed as the compartments of the input-output table. The results provided quantitative details of the energy consumption and identified the significant contributions from each sector. An impact analysis on the $CO_2$ emissions for the demand side was also conducted for comparison with the supply side.
The duck-rice forming system is increasingly spread up throughout Korea since 1992. It is discussed the rice field, rice quality, weed and pest management in the duck-rice weeding system compared to conventional farming system. Moreover the optimizing duck population, system management and fertilizer application rate were reported. Energy input and output by duck-rice farming system were carefully compared with those of low input sustainable paddy field and conventional farming paddy field. To find out the environmentally sound function of duck-rice system, the total nitrogen in paddy soil and paddy water, and nitrogen cycle in paddy rice cultivation system were analysed. finally the input and output were calculated, and ecological characteristic were determined in terms of nitrogen balance, labor input, animal input, renewable energy input, turnover of soil organic matter, energy loss, non-renewable indirect and direct energy input. It was concluded duck-rice weeding system could be recommended in terms of net only environmentally sound, but also farmer's income. But there are still some research needs for successful adaption of duck-rice farming to investigate to determine the optimal population of duck in rice paddy field unit, release time of duckling, duck management after release, and strategy for duck marketing and duck processing.
Triboelectric nanogenerator (TENG) is one of ways to convert mechanical energy sound, waves, wind, vibrations, and human motions to available electrical energy. The principal mechanism to generate electrical energy is based on contact electrification on material surface and electrostatic induction between electrodes. The performance of TENG are dependent on amount of the input mechanical energy and characteristics of triboelectric materials. Furthermore, the whole TENG system including mechanical structure and electrical system can effect on output performance of TENG. In this work, we investigated the effect of gear train on output performance and power conversion efficiency (PCE) of TENG under a given input energy. We applied the gear train on mechanical structure to improve the contact rate. We measured the output energy under a constant input energy by controlling the size of the working gear. We prepared gears with gear ratios (rin/rw) of 1, 1.7, and 5. Under the constant input energy, the voltage and current from our gear-based TENG system were enhanced up to the maximum of 3.6 times and 4.4 times, respectively. Also, the PCE was increased up to 7 times at input frequency of 1.5 Hz. In order to understand the effect of kinematic design on TENG system, we performed a capacitor experiment with rectification circuit that provide DC voltage and current. Under the input frequency of 4.5 Hz, we obtained a 3 times enhanced rectifying voltage at a gear ratio of 5. The measured capacitor voltage was enhanced up to about 8 fold in using our TENG system. It is attributed that our gear-based TENG system could improve simultaneously the magnitude as well as the generation time of output power, finally enhancing output energy. Therefore, our gear-based TENG system provided an effective way to enhance the PCE of TENGs operating at a given input energy.
The activation energy to create a phase transformation or for the reaction to move to the next stage in the milling process can be calculated from the slop of the DSC plot, obtained at the various heating rates for mechanically activated Al-Ni alloy systems by using Kissinger's equation. The mechanically activated material has been called "the driven material" as it creates new phases or intermetallic compounds of AlNi in Al-Ni alloy systems. The reaction time for phase transformation by milling can be calculated using the activation energy obtained from the above mentioned method and from the real required energy. The real required energy (activation energy) could be calculated by subtracting the loss energy from the total input energy (calculated input energy from electric motor). The loss energy and real required energy divided by the reaction time are considered the "metabolic energy" and "the effective input energy", respectively. The milling time for phase transformation at other Al-Co alloy systems from the calculated data of Al-Ni systems can be predicted accordingly.
An experimental study was conducted on the effect of compressor capacity control range of heat pump on the seasonal energy efficiency ratio with variation of the maximum and minimum compressor input frequencies. To obtain seasonal energy efficiency ratio, steady state test at the maximum, minimum and intermediate compressor speed and cyclic test at the minimum compressor speed should be conducted. Maximum input frequency was varied to 95Hz, 105Hz, and 115Hz, and the minimum input frequency was varied to 35Hz, 45Hz, and 55Hz. The seasonal energy efficiency ratio increased as the input frequency of the compressor decreased. The maximum input frequency had only slight effects on the SEER.
This study examines damping modification factors (DMFs) of elastic input energy spectra corresponding to a set of 116 earthquake ground motions. Mean input energy per mass spectra and mean DMFs are presented for both considered ground motion components. Damping ratios of 3%, 5%, 10%, 20%, and 30% are used and the 5% damping ratio is considered the benchmark for DMF computations. The geometric mean DMFs of the two horizontal components of each ground motion are computed and coefficients of variation are presented graphically. The results show that the input energy spectra-based DMFs exhibit a dependence on the damping ratio at very short periods and they tend to be nearly constant for larger periods. In addition, mean DMF variation is obtained graphically for also the damping ratio, and mathematical functions are fitted as a result of statistical analyses. A strong correlation between the computed DMFs and the ones from predicted equations is observed.
Journal of Construction Engineering and Project Management
/
제3권1호
/
pp.14-21
/
2013
To analyze building energy consumption, the building description for building energy performance analysis (BEPA) is required. The required data input for subject building is a basic step in the BEPA process. Since building information modeling (BIM) is applied in the construction industry, the required data for BEPA can be gathered from a single international standard file format like IFCXML. However, in most BEPA processes, since the required data cannot be fully used from the IFCXML file, a building description for BEPA must be created again. This paper proposes IFCXML-based automatic data input approach for BEA. After the required data for BEPA has been defined, automatic data input for BEPA is developed by a prototype system. To evaluate the proposed system, a common BIM file from the BuildingSMART website is applied as a sample model. This system can increase the efficiency and reliability of the BEPA process, since the data input is automatically and efficiently improved by directly using the IFCXML file..
The 5th International Conference on Construction Engineering and Project Management
/
pp.173-180
/
2013
To analyze building energy consumption, the building description for building energy performance analysis (BEPA) is required. The required data input for subject building is a basic step in the BEPA process. Since building information modeling (BIM) is applied in the construction industry, the required data for BEPA can be gathered from a single international standard file format like IFCXML. However, in most BEPA processes, since the required data cannot be fully used from the IFCXML file, a building description for BEPA must be created again. This paper proposes IFCXML-based automatic data input approach for BEA. After the required data for BEPA has been defined, automatic data input for BEPA is developed by a prototype system. To evaluate the proposed system, a common BIM file from the BuildingSMART website is applied as a sample model. This system can increase the efficiency and reliability of the BEPA process, since the data input is automatically and efficiently improved by directly using the IFCXML file.
The use of clothes dryers is increasing in Korea and throughout Asia, because of preference for the drum type washer dryer. Clothes dryers consume more energy than almost any other home appliance. This paper suggests efficient ways for drying laundry with condensing clothes drier. We dried cotton fabrics with the condensing clothes dryers and observed the energy input, temperature and RH of the dryer during the drying process. In the early stages of drying process, the air temperature inside the clothes dryer decreased and the RH and the drying time increased as the weight of fabrics increased. We found that it was important to consider the total weight of the fabrics that included heat-sensitive fibers. It took more than half the drying time and the energy input for a 2.5 kg load that it did for a 5 kg load. Therefore, drying larger one load was more efficient than divided smaller loads, because increasing the weight of the fabrics reduced the energy input per kg of drying clothes. The lower the initial moisture regains of the fabrics were, the lower the energy input and the drying time were. The energy input for spinning after washing was much less than that for drying in the dryer. Consequently, it is more efficient to reduce the moisture content of the clothes by lengthening the spinning time of the washer to reduce the energy consumption and the drying time. During the drying process opening the door twice for 30 seconds each time lowered the air temperature and the RH of the dryer, but did not affect the moisture regain of the fabrics, the drying time, and the energy input.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.