• Title/Summary/Keyword: embedded pillar

Search Result 3, Processing Time 0.016 seconds

A study on the plan for the corridor of Silla Buddhist temples in the 6~8th Century through examining remains (유구검토를 통한 6~8세기 신라 불교사원 회랑 건축계획 연구)

  • Kim, Sookyung;Lee, Eun Bee
    • Journal of architectural history
    • /
    • v.28 no.5
    • /
    • pp.19-26
    • /
    • 2019
  • The subjects of this study were limited to Silla buddhist temple remains in the 6~8th century, where the excavation survey report was published and the details of the remains of the corridor are revealed. Since the corridor completes the structure of temple and is involved in formation of the space, the building plan for corridors is thought to have an intention linked to the entire temple. Thus, more closer study is required for this construction plan to identify the role of corridors. The corridor is a building that has a low architectural hierarchy and completes the layout and composition of the temple. In the unit planning of the corridor, unit were designed to be of a certain size in the temple layout. Then, the overall scale was made by adding the fixed size of unit. The combination of corridors are the combined points of paths and were used as visual points. The structure of the corridor was constructed to be adjusted according to the size of the main compartment of the building to which it was connected and inserted under the roof of the building. The adjustment of the unit changed in the range of 0.5 to 2 of Silla's system of measurement. The usage of embedded pillar in the corridor presents a new perspective on Silla architecture.

DEVELOPMENT OF CONCRETE FILLED TUBE AS A PILLAR PILE FOR TOP DOWN METHOD

  • Jee-Yun Song;Hong-Chul Rhim;Seung-Weon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.808-813
    • /
    • 2009
  • Top-down method is widely used for urban area construction for its advantages in reducing environmental problems such as dust and noise, and saving construction cost depending on given conditions of a construction site. Because the excavation and construction of super- and sub-structures of the building have to be proceeded simultaneously, a column has to be embedded prior to excavation. This column is called a pillar column or pre-founded column. Usually a wide flange section is used for these columns. To place the columns, usually the diameter of casing holes needs to be larger than the section of the wide flange itself in order to accommodate a couple of tremie pipes for pouring concrete. In this paper, a newly developed method of using circular pipe as an alternative to the existing wide flange section is discussed. The crucial part of the new method is to develop a connection between the circular column and concrete flat slabs. For shear force transfer from concrete slab to the concrete filled tube (CFT) column, shear jackets with studs and shear bands are proposed. The studs are welded on the jackets at shop and placed around the circular column on site. The shear bands are welded on the outer side of the CFT at shop and inserted into ground with the CFT. Test results and application of the method to a construction site are also provided in this paper.

  • PDF

Horizontal Behavior Characteristics of Umbrella-Type Micropile Applied in Sandy Soil Subjected to Seismic Motion (사질토 지반에 설치된 우산형 마이크로파일의 지진 시 수평거동 특성)

  • Kim, Soo-Bong;Son, Su Won;Kim, Jin Man
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.7
    • /
    • pp.5-16
    • /
    • 2020
  • Currently, the seismic design standards have been strengthened due to the occurrence of the Gyeongju and Pohang earthquake, and seismic performance evaluation of existing facilities is being conducted. It aims to secure a seismic performance effect during earthquakes by improving the micro-pile method, which can be constructed in limited confined places while minimizing damage to existing facilities. The improvement method is to construct all the piles in the square-tray-type plate on the top of the pile by constructing the slope pile in the form of an umbrella around the vertical pile, the main pillar. In this paper, the numerical analysis was performed to analyze the horizontal displacement behavior of an umbrella-type micropile for various real-measurement seismic waves in sandy soil. As a result of numerical analysis, the softer the ground, the better the effect of horizontal resistance of umbrella-type micropile. The horizontal displacement reduction effect was pronounced when the embedded depth was 15 m or more at the same ground strength, and it was found to be effective in earthquakes if it was settled on the ground with an N value of 30 or more. The embedded depth and horizontal displacement suppression effect of the micropile was proportional. Generally, the weaker the ground, the greater the displacement suppression effect. Umbrella-type micropile had a composite resistance effect in which the vertical pile resists the moment and inclined pile resists the axial force.