• 제목/요약/키워드: embedded connection

검색결과 162건 처리시간 0.02초

대공간 교육시설 축조를 위한 프리스트레스트 보에 사용되는 접합 강재의 성능평가에 대한 연구 (A Study for Structural Capacity Evaluation of Embedded Steel Plate Connected with Prestressed Concrete Beam to Build Large Space Educational Facilities)

  • 이경훈
    • 교육녹색환경연구
    • /
    • 제10권2호
    • /
    • pp.1-7
    • /
    • 2011
  • An experimental study to evaluate structural capacity of an embedded plate connected with prestressed concrete beam was performed. Embedded steel plates and prestressed concrete beam were connected with stud-bolts at the ends of concrete beam specimens. About 1,000 kN concentrated load was applied at 450mm away from the end of beam specimen. A 3,000 kN capacity static Oil-jack was used to direct concentrated load. The maximum strain of stud-bolt recorded $90{\times}10^{-6}$(mm/mm) and wide width cracks were not founded. Any falling failures of concrete and large deformations were not founded either between steel plate and prestressed concrete specimen. As a result, construction performance can be improved using this embedded steel plate connection system apply to large space educational facilities.

Cyclic behavior of steel beam-concrete wall connections with embedded steel columns (I): Experimental study

  • Li, Guo-Qiang;Gu, Fulin;Jiang, Jian;Sun, Feifei
    • Steel and Composite Structures
    • /
    • 제23권4호
    • /
    • pp.399-408
    • /
    • 2017
  • This paper experimentally studies the cyclic behavior of hybrid connections between steel coupling beams and concrete shear walls with embedded steel columns. Four beam-to-wall connection specimens with short and long embedded steel columns are tested under monotonic and cyclic loads, respectively. The influence of embedment length of columns on the failure mode and performance of connections is investigated. The results show that the length of embedded steel columns has significant effect on the failure mode of connections. A connection with a long embedded column has a better stiffness, load-bearing capacity and ductility than that of a short embedded column. The former fails due to the shear yielding of column web in the joint panel, while failure of the latter is initiated by the yielding of horizontal reinforcement in the wall due to the rigid rotation of the column. It is recommended that embedded steel columns should be placed along the entire height of shear walls to facilitate construction and enhance the ductility.

Failure analysis of steel column-RC base connections under lateral cyclic loading

  • Demir, Serhat;Husem, Metin;Pul, Selim
    • Structural Engineering and Mechanics
    • /
    • 제50권4호
    • /
    • pp.459-469
    • /
    • 2014
  • One of the most important structural components of steel structures is the column-base connections which are obliged to transfer horizontal and vertical loads safely to the reinforced concrete (RC) or concrete base. The column-base connections of steel or composite steel structures can be organized both moment resistant and non-moment resistant leading to different connection styles. Some of these connection styles are ordinary bolded systems, socket systems and embedded systems. The structures are frequently exposed to cycling lateral loading effects causing fatal damages on connections like columns-to-beams or columns-to-base. In this paper, connection of steel column with RC base was investigated analytically and experimentally. In the experiments, bolded connections, socket and embedded connection systems are taken into consideration by applying cyclic lateral loads. Performance curves for each connection were obtained according to experimental and analytical studies conducted and inelastic behavior of connections was evaluated accordingly. The cyclic lateral performance of the connection style of embedding the steel column into the reinforced concrete base and strengthening of steel column in upper level of base connection was found to be higher and effective than other connection systems. Also, all relevant test results were discussed.

임 베디드 시스뎀을 위한 가상기계의 라이브러리 링킹에 관한 연구 (A Study on the Library Linking of a Virtual Machine for Embedded System)

  • 고광만
    • 한국컴퓨터산업학회논문지
    • /
    • 제5권9호
    • /
    • pp.965-972
    • /
    • 2004
  • 본 논문은 소규모 장치 및 모바일 장치 등에 탑재되고 있는 KVM, Waba VM의 탑재 기법 및 네이티브 코드 연결 기법을 기반으로 임베디드 시스템에 적합한 가상기계의 정적/동적 라이브러리 연결 기법에 관한 연구이다. 이를 위해, KVM, Waba VM의 네이티브 함수 연결 기법을 기반으로 정적/동적 라이브러리 함수 연결을 위한 새로운 네이티브 함수 테이블을 구현하였다. 또한 구현된 기법을 이용하여 다양한 실험 및 분석 결과를 제시하였다.

  • PDF

CFT를 이용한 모듈러 교각 기둥-기초 연결부의 내진성능 (Seismic Performance of Column-Footing Connection of Modular Pier using CFT)

  • 김지영;김기도;마향욱;정철헌
    • 대한토목학회논문집
    • /
    • 제34권1호
    • /
    • pp.73-85
    • /
    • 2014
  • CFT 기둥은 시공이 간단하고 경제적이며 구조성능이 우수한 현장타설 매입형 연결 형식이다. 본 연구에서는 모듈러 교각에 적용되는 CFT 기둥-기초 연결부 형식을 제안하고, 실험을 통하여 구조성능을 평가하였다. 기둥-기초 연결부의 구조성능을 평가하기 위해서 기초부 콘크리트에 매입되는 CFT 기둥의 매입깊이를 변수로 총 4개의 실험체를 제작하여 실험을 수행하였다. 준정적 실험결과, 매입깊이가 0.6D인 실험체에서는 낮은 하중단계에서 기초부의 콘파괴로 인하여 상대적으로 낮은 연성능력을 보였다. 그러나 매입깊이가 0.9D 이상인 실험체에서는 기초부의 콘파괴가 방지되고 CFT 기둥 하단부에서 전형적인 휨파괴 거동을 보이며 높은 연성능력을 발휘하였다. 하중-변위 이력곡선, 변위 연성도 및 에너지 소산능력 등을 분석한 결과, 제안된 CFT 기둥-기초 연결부의 매입깊이는 0.9D~1.2D 수준이 내진성능을 발휘하는 합리적인 수준인 것으로 평가되었다.

Bearing Strength of Hybrid Coupled Shear Wall Connections

  • Park Wan-Shin;Yun Hyun-Do
    • 콘크리트학회논문집
    • /
    • 제17권6호
    • /
    • pp.1065-1074
    • /
    • 2005
  • Due to lack of information, current design methods to calculate bearing strength of connections are tacit about cases in which hybrid coupled walls have connection details of stud bolts and horizontal ties. In this study, analytical study was carried out to develop model for calculating the connections strength of embedded steel section. The bearing stress at failure in the concrete below the embedded steel coupling beam section is related to the concrete compressive strength and the ratio of the width of the embedded steel coupling beam section to the thickness of the shear walls. Experiments were carried out to determine the factors influencing the bearing strength of the connection between steel coupling beam and reinforced concrete shear wall. The test variables included the reinforcement details that confer a ductile behavior in connection between steel coupling beam and shear wall, i. e., the auxiliary stud bolts attached to the steel beam flanges and the transverse ties at the top and the bottom steel beam flanges. In addition, additional test were conducted to verify the strength equations of the connection between steel coupling beam and reinforced concrete shear wall. The results of the proposed equations in this study are in good agreement with both our test results and other test data from the literature.

The Bearing Strength of Connections Between Steel Coupling Beam and Reinforced Concrete Shear Walls

  • Yun, Hyun Do;Park, Wan Shin;Han, Min Ki;Kim, Sun Woo;Kim, Yong Chul;Hwang, Sun Kyung
    • Architectural research
    • /
    • 제7권1호
    • /
    • pp.27-38
    • /
    • 2005
  • No specific guidelines are available for computing the bearing strength of connection between steel coupling beam and reinforced concrete shear wall in a hybrid wall system. There were carried out analytical and experimental studies on connection between steel coupling beam and concrete shear wall in a hybrid wall system. The bearing stress at failure in the concrete below the embedded steel coupling beam section is related to the concrete compressive strength and the ratio of the width of the embedded steel coupling beam section to the thickness of the shear walls. Experiments were carried out to determine the factors influencing the bearing strength of the connection between steel coupling beam and reinforced concrete shear wall. The test variables included the reinforcement details that confer a ductile behavior in connection between steel coupling beam and shear wall, i.e., the auxiliary stud bolts attached to the steel beam flanges and the transverse ties at the top and the bottom steel beam flanges. In addition, additional test were conducted to verify the strength equations of the connection between steel coupling beam and reinforced concrete shear wall. The proposed equations in this study were in good agreement with both our test results and other test data from the literature.

유닛 모듈러 기둥 매입형 기초 접합부에 대한 실험 연구 (Test Result on Embedded Steel Column-to-Foundation Connection for Modular Unit Structural System)

  • 이상섭;배규웅;박금성;홍성엽
    • 한국강구조학회 논문집
    • /
    • 제26권6호
    • /
    • pp.537-547
    • /
    • 2014
  • 골조 유닛 모듈러 구조 형식은 기 제작된 유닛 구조물을 적층하여 건물을 보다 간편히 건설을 할 수 있어 중, 고층 건물에 적용이 확대되고 있다. 이러한 유닛 모듈러 구조 형식은 외력에 의하여 발생하는 축력과 휨모멘트를 지반에 잘 전달시켜야 함으로 각각의 유닛구조물은 기초와 적절히 연결되어야 한다. 본 연구에서는 새로운 형태의 매입형 유닛-기초 접합부를 제안하였으며, 제안된 접합부의 성능을 일련의 실험 연구를 통하여 평가하였다. 총 5개의 실물 크기의 실험체를 제작하여 실험을 수행하였으며, 매입 길이와 엔드 플레이트와 같은 제안된 유닛-기초 접합부의 휨거동에 영향을 미칠 수 있는 인자들의 영향을 살펴보았다. 실험결과, 모든 실험체에서 강성은 최소한 반강접의 강성을 상회하는 것으로 나타났으며, 기둥의 매입길이는 본 연구에서 수행한 실험체에서 약 200mm가 적절한 것으로 파악되었다.

합성 PC 보를 위한 전단 보강 계산 모형 기초 연구 (A Basic Study of the Calculation Model for Shear Connectors of Composite Precast Concrete Beams)

  • 임채연;이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.19-20
    • /
    • 2013
  • Green Frame is a column-beam system constructed by composite precast column and beam connected by embedded steel of their. From when the precast concrete beam of Green Frame is installed, until the concrete of slab and connection joint is cured, the self load of beam shall be supported by the embedded steel of it. Therefore, the concrete of beam could be separated from the embedded steel if the shear connector of beam of Green Frame is designed by the code on Structural standard. So, this study suggest an equation for the shear connection of composite precast concrete beams of Green Frame. The result of this study will be used as the main equation of the calculation model for shear connectors of composite precast concrete beams.

  • PDF

보강강판을 이용한 연속 PSC 교량 공법에 관한 연구 (A Study of continuous PSC bridge with a reinforcement steel plate)

  • 구민세;김훈희;정영도
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.422-429
    • /
    • 2005
  • It is limited to decrease height or section even by system conversion to indeterminate structure - continuous beam - in existing PSC girder bridges. In this study, the movement of connection is analyzed through actual field test, by increasing stiffness of negative moment area in continuous PSC bridge and developing continuous PSC bridge with embedded steel plate, that can overcome the demerit of existing connection. As a result, it is confirmed that the body unification of the connection is being realized and maintained. Moreover, the height of a span is suggested in continuous PSC girder bridge with embedded steel plate by computational analysis

  • PDF