• Title/Summary/Keyword: electrical construction company/work

Search Result 8, Processing Time 0.023 seconds

A Study on the Characteristic of Electrical Construction Work for Prevention of Electric Shock Accident (감전재해 예방을 위한 전기공사업의 특성에 관한 연구)

  • Choi, Sang-Won
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.29-34
    • /
    • 2014
  • The live line working is inherently dangerous as the workers have to work under the risk of electrical shock and most of works are carried out at height. The live line working need the some specific techniques and higher level safety measures such as a risk assessment to carry out works safely, but the electrical construction companies performed live-line working are usually small-sized companies. They have less capacity to have own safety management system. This study intended to conduct an in-depth analysis on the cause of electric shock accidents to provide basic data for policy proposing taking into considering the past eleven years for a long-term plan. And the aim of this study is to propose the policy about the equipment performance standards and/or worker's safety standards to revise the standards for preventing electric shock accidents, moreover, co-relation of the electrical work order form and on safety workings, especially electrical construction company/work.

AC Breakdown Voltage Characteristics in $SF_6$ Gas with Spacer Under Mon-uniform Field ($SF_6$ 가스중 스페이서가 존재하는 불평등전계하에서의 교류파괴전압 특성)

  • Kim, Jung-Dal;Song, Hee-Suck;Song, Won-Pyo
    • Proceedings of the KIEE Conference
    • /
    • 1990.07a
    • /
    • pp.293-296
    • /
    • 1990
  • In this work, we reviewed AC break-down voltage characteristics in $SF_6$ Gas with spacer under nonuniform field, using the electrode construction of model spacer and simple protrusion. We cleared that breakdown voltage and surface flashover strongly depend on the position of spacer's insert.

  • PDF

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

Research in revitalization of educational work for overseas (해외교육사업 활성화 방안에 관한 연구)

  • Choi, Han-Yeol;Min, Byeong-Wook;Kim, Jong-Hwa
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.721-722
    • /
    • 2007
  • Currently, there has been a special practical program in Transmission for developing country(Southeast Asia, China and the Middle East) in KEPCO..And it will enhance the value of KEPCO by having highly competitive practical programs compare to other electric power company in developed countries. In this program, we focused on actual affairs to help engineers become experienced and all lecturers-experts in practical work-are giving the know-how of technique and skill..This program consists of 16 courses(Power system, Transmission construction and maintenance )which is designed for customers own needs. Therefore anyone can make the order of the course as they need. This program has contributed much to the growth of the company and helped to achieve a world-wide reputation. Also foreign aid project created a KEPCO image which will enjoy the nation's love and confidence. Through this course we can increase our international competeitivenessand and will have a chance to start a business that has a future in Northwest Africa.

  • PDF

A Study on the In-depth Analysis of Cause and Characteristic for Recent Electric Shock Accident (최근 감전재해의 발생특성과 재해원인 분석연구)

  • Choi, Sang-Won
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.7-11
    • /
    • 2014
  • The electric shock victims were predominantly male, and more than half of the victims were found in companies with less than five employees in terms of the scale of company, and also more than half of victims had less than one month of experience for work experience. Considering the category of industry, more than half of the victims were engaged in construction, and considering the subcategory of industries, more than 60% of electric shock victims were found in building and other construction works. This study intended to conduct an in-depth analysis on the cause of electric shock accidents to provide basic data for policy proposing taking into considering the characteristics such as the electric shock path, low voltage, grounding and protection of workers. Also this study conducted an in-depth analysis of electric shock accidents for the past eleven years taking into account the necessity of a long-term plan.

Identification of target subjects and their constraints for automated MEP routing in an AEC project

  • Park, SeongHun;Shin, MinSo;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.776-783
    • /
    • 2022
  • Since Mechanical, Electrical, and Plumbing(MEP) routing is a repetitive and experience-centered process that requires considerable time and human resources, if automated, design errors can be prevented and the previously required time and human resources can be reduced. Although research on automatic routing has been conducted in many industries, the MEP routing in AEC projects has yet to be identified due to the complexity of system configuration, distributed expertise, and various constraints. Therefore, the purpose of this study is to identify the target subjects for MEP routing automation and the constraints of each subject. The MEP design checklist provided by a CM company and existing literature review were conducted, and target subjects and constraints were identified through process observation and in-depth expert interviews for five days by visiting a MEP design company. The target subjects were largely divided into six categories: air conditioning plumbing, air conditioning duct, restroom sanitary plumbing, heating plumbing, and diagram. The findings from interviews show that work reduction and error reduction has the greatest effect on air conditioning plumbing while the level of difficulty is the highest in air conditioning duct and restroom sanitary plumbing. Major constraints for each subject include preventing cold drafts on air conditioning pipes, deviation in ventilation volume in air conditioning ducts, routing order on restroom sanitary plumbing, and separation distance from the wall on heating plumbing. In this way, subjects and constraints identified in this study can be used for MEP automatic routing.

  • PDF

A study on the role and Construction of Electric Power Statistics after Deregulation (구조개편후 전력분야 통계의 역할과 효율적 구축방향)

  • Kim, C.S.;Rhee, C.H.;Jo, I.S.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.667-669
    • /
    • 2003
  • Since the restructuring in electricity industry, single utility company, KEPCO, was being unbundled horizontanly and vertically, which resulted in 6 generation companies. Hence, electricity statistics system leaded by KEPCO is no longer efficiently sustainable. By introduction of electricity market, the importance of statistical information is getting higher and higher. From now on, the leading role played in statistical system in electricity field should be switched from KEPCO to government. This paper looks into change in statistical work driven by electricity and provides alternatives applicable to new electricity market. In addition, this paper provides new standard form for the collection of statistical data and construction of statistical system.

  • PDF

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF