• Title/Summary/Keyword: electric rolling stock

Search Result 101, Processing Time 0.027 seconds

A Study on the Rolling Stock Scheduling considering maintenance activities in Railway (유지보수를 고려한 철도차량 운용계획에 관한 연구)

  • Kim Dong-Hee;Hong Sun-Heum
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.280-285
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long-term, mid-term. short-term, and real-time plan. The planning of vehicle and manpower resources is a main research topic in tactical short-term planning step. Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far, power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high-speed railway is introduced, the operational planning of trainset vehicles become important, In this paper, we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

Rolling Stock Maintenance Scheduling for High-Sneed Railway (고속철도차량의 유지보수계획)

  • 김동희;홍순흠
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.05a
    • /
    • pp.53-61
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

Technological overview of the main converter/inverter between HEMU-400X and abroad High Speed Trains (HEMU-400X와 해외 주전력 변환장치 시스템기술 분석)

  • So, Jin-Sub;Lee, Young-Yeob;Lee, Jin-Houng;Son, Kyoung-So;Lee, Jong-Ho;Kook, Moon-Seok;Yun, Cha-Jung
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.567-573
    • /
    • 2009
  • The technologies of the main converter/inverter, which is indispensable for securing a safety and reliability of traction performance in rolling stock, have been compared and analyzed between HEMU-400X and High Speed Trains in Japan, France and Germany through this study. The result of this study indicates that home and abroad technologies aim at a small-sized and lightweight main converter/inverter as well as the prevention of noise in electric ventilator.

  • PDF

A Study on the Standard Preparation for Cab Design of EMU with the 180km/h of Maximum Speed (180km/h급 간선형 전기동차 운전실 설계기준 마련 연구)

  • Lhim, Jea-Eun;Jung, Do-Won;Kim, Chi-Tae
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1229-1234
    • /
    • 2009
  • The rolling stocks of KORAIL are KTX, Saemaulho Multiple Unit(PP), New Electrical Locomotive(DL), Electrical Locomotive(EL), Diesel Locomotive, Metropolitan Commuter Train(CDC), VVVF and Resistance Controlled Multiple Unit, etc. EMU with the maximum speed of 150km/h is under the test run at the moment. Electrical Multiple Units for mainlines with 180km/h speed are supposed to be introduced as a substitute for Saemaulho Multiple Unit which is scheduled to be out of service. But the specification standard for the control board design of train driver's cab does not exist and there is no a study for layout and type of controlling device with driver's ergonomical approach. That's why the types of controller and operating are different from rolling stocks, which has high possibility of driver's human error and needs education whenever a new car comes in. Based on the opinion poll of drivers, design specification of safety engineering and ergonomics for controlling devices and safety facilities can improve exact control for devices and deal quickly with an emergency so as to improve rolling stock safety and operational efficiency.

  • PDF

The Feasibility Study of the Scenario of 400kph Maximum Speed Test in HEMU (High-speed Electric Multiple Unit) System (400km/h급 전차선로 시스템의 시범적용 구간선정 연구)

  • Ryoo, Hyang-Bok;Jang, Sa-Sool;Park, Jae-Woong;Lee, Hae-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.761-767
    • /
    • 2011
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

The Simulation Implementation on contact loss of high speed electric railway using a Power Line Disturbance simulator (전원외란 시뮬레이터를 이용한 고속전철 이선현상 모의 실험)

  • Kim, Jae-Moon;Kim, Yang-Soo;Chang, Chin-Young;Ahn, Jeong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.2152_2153
    • /
    • 2009
  • In this study, the dynamic characteristic of a contact wire and pantograph suppling electrical power to high-speed trains are investigated from an electrical response point of view. To analysis power line disturbance by induced contact loss phenomenon for high speed operation, a hardware Simulator which considered contact loss between contact wire and the pantograph as well as contact wire deviation is developed. It is confirmed that a contact wire and pantograph model are necessary for studying the dynamic behavior of the pantograph system. One of the most important needs accompanied by increasing the speed of high-speed train is reduced that an arc phenomenon by loss of contact brings out EMI. In case of a high-speed train using electrical power, as comparison with diesel rolling stock, PLD(Power Line Disturbance) such as harmonic, transient voltage and current, EMI, dummy signal injection etc usually occurs. Throughout experiment, it is verified that an arc phenomenon is brought out for simulator operation and consequently conducted noise is flowed in electric circuit by power line disturbance.

  • PDF

Transient Characteristic Study on Contact Loss of High Speed Electric Railway Using a Power Line Disturbance Simulator (전원외란 시뮬레이터를 이용한 고속전철 이선현상과도 특성 연구)

  • Kim, Jae-Moon;Kim, Yang-Su
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.427-431
    • /
    • 2009
  • In this study, the dynamic characteristic of a contact wire and pantograph suppling electrical power to high-speed trains are investigated from an electrical response point of view. To analysis power line disturbance by induced contact loss phenomenon for high speed operation, a hardware Simulator which considered contact loss between contact wire and the pantograph as well as contact wire deviation is developed. It is confirmed that a contact wire and pantograph model are necessary for studying the dynamic behavior of the pantograph system. One of the most important needs accompanied by increasing the speed of high-speed train is reduced that an arc phenomenon by loss of contact brings out EMI. In case of a high-speed train using electrical power, as comparison with diesel rolling stock, PLD(Power Line Disturbance) such as harmonic, transient voltage and current, EMI(Electromagnetic Interference), dummy signal injection etc usually occurs. Throughout experiment, it is verified that an arc phenomenon is brought out for simulator operation and consequently conducted noise is flowed in electric circuit by power line disturbance.

A Study on the Magnetic Field Intensity and BER from Wayside Device to On-board Device about the Train Speed in ATP System (ATP 시스템에서 열차속도에 따른 지상자에서 차상자까지의 자계의 세기 및 비트오류율에 관한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Lee, Jong-Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1803-1808
    • /
    • 2010
  • Electric railway system consists of rolling stock, track, signal and catenary system. ATP system in railway signaling system is the important one grasping the position and velocity of a train. The wayside device of ATP system is installed between rails. Recently, the research about increasing train speed has been developed in total departments of the railroad systems. The study on the information transmission between on-board device and wayside device is required for increasing the train speed in the ATP system. When the train speed is increased as to same transmission distance, the problem on information transmission occurs because the transmission time is decreased. In case that the transmission distance is extended, the transmission time is decreased with respect to the train speed. Therefore, we have to define the standard magnetic field intensity as to the train speed in order to transmit correctly telegram. In this paper, the transmission distance for the telegram is suggested on the basis of the train speed. Also, the standard magnetic field intensity from the wayside device to on-board device is proposed by using transmission distance regarding the train speed in the ERTMS/ETCS system by using Matlab program. Also, BER according to the train speed is presented by calculating electric field intensity from the magnetic field intensity.

Analysis of Contact Loss Arc Spectrum between Contact Wire and Pantograph Material using a Spectrometer (광계측기를 이용한 전차선-팬터그래프 재질별 이선아크 스펙트럼 분석)

  • Chang, Chin-Young;Jung, No-Geon;Park, Jong-Gook;Koo, Kyung-Wan;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.12
    • /
    • pp.1803-1808
    • /
    • 2013
  • To maintain contact between catenary and pantograph copper is important in order to transmit power smoothly on Current collection system. But, Arc discharge with strong light is generated because of contact loss. Therefore, Arc discharge detection is important measurement factor judging performance of current collection system. In this paper, It is described to results of arc discharge applying UV detection technology using arc generator. And Arc discharge was detected using the most commonly used processing catenary and rigid catenary and pantograph copper of electric rolling stock for securing arc detection instrument reliability. Results of contact loss detection instrument in this paper will be used for maintenance of current collection quality and system.

The Feasibility study of the scenario for 400kph maximum speed test in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 400kph 최고속도 시험을 위한 시운전 시나리오 고찰)

  • Kang, B.M.;Jeong, S.H.;An, H.K.;Cho, B.C.;Moon, J.S.
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.429-433
    • /
    • 2009
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF