• Title/Summary/Keyword: economical feasibility

Search Result 261, Processing Time 0.025 seconds

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro-Power Plants (터널식 소수력 발전소의 최적 설계유량에 관한 연구)

  • 이철형;박완순
    • Water for future
    • /
    • v.24 no.1
    • /
    • pp.63-71
    • /
    • 1991
  • This study represents the methodology for feasibility analysis of small hydro power plants. Cumulative density function of Weibull distribution and Thi-essen method were adopted to beside flow duration curve at candidate sites. The performance prediction model and construction cost estimation model for tunnel-type small hydro power plants were developed. Eight candidate sites existing on Han river selected and surveyed for actual sites reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrates with the lowest unit generation cost for tunnel-type small hydro power plants were the flowrate concerning with between 20 % and 30 % of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual average load factor, annual electricity production were estimated and discussed for surveyed sites.

  • PDF

An Economic Evaluation Method for Remodeling Project - focusing on the rental apartment - (리모델링 사업의 경제성 평가 방안 -임대 아파트를 중심으로- .)

  • Kim Hae-Jung;Kang Hyun-Kui;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.359-362
    • /
    • 2001
  • Most old apartment housing have been replaced with new ones by means of the reconstruction. But with the change of the construction environment, remodeling is introduced as a new alternative for the replacement. Remodeling is expected to reduce national loss owing to the early reconstruction of old apartments resulted from economical and functional deterioration. But there still remains a lot of problems to be first solved for Remodeling. One of those is to figure out how to perform an economic feasibility analysis effectively. The researches of remodeling done under the rally stage are not sufficient in economic feasibility for apartment housing. Therefore, this paper suggests an effective method for the economic evaluation of remodeling projects focusing on a rental high-rise apartment.

  • PDF

Energy Saving Effect and Economy Feasibility of Office Building with regard to Geometries and Orientations

  • Koh, Jae-Yoon;Zhai, John
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.17 no.1
    • /
    • pp.15-24
    • /
    • 2009
  • The energy usage and the economical feasibility of the typical two story office building in the three urban locations of South Korea are evaluated as the eight orientations. The smallest energy consume is shown at the true south. The ranges of the low energy consume are $-3l5^{\circ}{\sim}0^{\circ}\;and\;-135^{\circ}{\sim}-180^{\circ}$. There are obvious advantages of passive solar designs such as using a fully glazed facade at the true south in the building. The General Low voltage plan is the effective way for the office building when does not required the high voltage electricity. The energy cost of KEPCO is compared to that of XCEL ENERGY. The portion of the customer charge of XCEL ENERGY is about 10% but it is about 50% of the total tariff of KEPCO. The effective way to save the energy cost is by reducing the operating energy of XCEL ENERGY plane but the most effective way is reduce the contracting energy of KEPCO plane.

A Study to Promote the EC Collaboration of the South and North Korea based on the Preemptive Dispute Resolution Policies (남북한 전자상거래 추진에 따른 활성화 방안 -분쟁방지를 위한 사전조정 기능을 중심으로-)

  • Choi, Yong-Rok
    • Journal of Arbitration Studies
    • /
    • v.16 no.3
    • /
    • pp.191-216
    • /
    • 2006
  • It has been talked about the responsibility of the South-North Korean e-market place(e-MP) collaboration project every you since 2003. However, the feasibility as the business has not been dealt with in detail due to the uncertain environment as well as the complicated procedures of the project. The research focuses on the workable mechanism of the South-North Korean E-Market Place collaboration project. The feasibility of the project results from the newly installed fiber telecommunication network as well as the 1 billion dollars of the trading volume between South and North Korea. The research analyzes on the capabilities as well as willingness of the South and North Korea for the e-MP, and concludes with two paradigms of the future tasks. First, the unified but step-wise structure should be made to promote the project by the political committee (South and North Korea EC Committee) and the economical administration body (South and North Korea EC Corporation). Second, the market-oriented resolution system such as South and North Korea Arbitration Body should be involved to create legal environment. Above all, the discussion should be on the main body of e-MP settlement to abolish the psychological as well as practical barriers to enter the South-North Korean electronic commerce.

  • PDF

Technical and economical feasibility of using GGBS in long-span concrete structures

  • Tang, Kangkang;Millard, Steve;Beattie, Greg
    • Advances in concrete construction
    • /
    • v.3 no.1
    • /
    • pp.1-14
    • /
    • 2015
  • China accounts for nearly half of the global steel production. As a waste material or a by-product in the manufacture process, a large amount of blast furnace slag is generated every year. The majority of recycled blast furnace slag is used as an additive in low-grade blended cement in China (equivalent to the UK CEM II or CEM III depending on the slag content). The cost of using ground granulated blast furnace slag (GGBS) in such low-grade applications may not be entirely reimbursed based on market research. This paper reports an on-going project at Xi'an Jiaotong-Liverpool University (XJTLU) which investigates the feasibility of using GGBS in long-span concrete structures by avoiding/reducing the use of crack control reinforcement. Based on a case study investigation, with up to 50% of CEM I cement replaced with GGBS, a beneficiary effect of reduced thermal contraction is achieved in long-span concrete slabs with no significant detrimental effect on early-age strengths. It is believed that this finding may be transferable from China to other Asian countries with similar climates and economic/environmental concerns.

A Study on the Location Assessment of Rural Village Construction Project (신규마을 조성사업의 입지 평가에 관한 연구)

  • Lee, Byunghark;Jung, Namsu;Kim, Jongbong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.4
    • /
    • pp.97-103
    • /
    • 2019
  • If the new town development project begins with inappropriate location then it will be difficult to recruit tenants and the proportion of the infrastructure cost could increase. It is necessary to evaluate the feasibility of the new town development projects to solve this problem. This study aims to identify the current status of the new town development projects and draw up evaluation criteria by examining advanced researches. To identify the importance of each village, we set up the weights through analytic hierarchy process. The evaluation criteria were classified into location conditions and economical efficiency. In the case of location conditions, it was classified into available size, geographical conditions, and accessibility. As a result of analyzing the questionnaire, it was subdivided into officially assessed land prices in case of economic efficiency. This study had some limitations, that is we focused on the location conditions and economic feasibility among other factors. Therefore further study should contain analysis more on socio-cultural aspects such as residents' cooperation or will for this project. By adding results later, we can make more reasonable decisions when we choose appropriate area.

Economic analysis of the loading-unloading and automatic weighing systems in laver aquaculture industry (양식장 물김 이송 및 중량 자동측정 시스템 개발의 경제성 분석 연구)

  • Dae-Hyon KIM;Eun-Bi MIN;Tae-Jong KANG;Doo-Jin HWANG
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.59 no.2
    • /
    • pp.181-187
    • /
    • 2023
  • Laver aquaculture, which occupies a large proportion in the aquaculture industry in Korea, is still highly dependent on human labor. Therefore, it is necessary to study the development of an automatic system to improve the working environment and increase the efficiency of aquaculture production systems. The purpose of this study is to evaluate the economic feasibility of an improved system in a study for the loading-unloading and automatic weighing systems in laver aquaculture industry. Economic analysis of the developed unloading and automatic weighing system were implemented under various conditions to calculate more accurate benefits and costs. As a result of this study, the economic feasibility was found to be very high in the three models: net present value (NPV), benefit-cost ratio (B/C), internal rate of return (IRR). Moreover, the results of sensitivity analysis showed that the economical efficiency of the automatic loading, unloading, and weighing system in laver aquaculture was very high.

Use of Geo-spatial Information System for the Potential Location Analysis of Small Hydropower.

  • Bastola, Shiksha;Lee, Sangheop;Kareem, Kola Yusuff;Jung, Younghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.151-151
    • /
    • 2021
  • The alarming climate change impacts are demanding the use of renewable energy sources like never before. Hydropower is one of the most cost-effective and environmental friendly energy technology recognized in the world. Big hydropower projects come up with the requirements of huge investment costs along with environmental impacts, whereas small hydropower(SHP) are considered a best solution for the economical source of energy. SHP, basically Run-of-River (RoR) type plants can be sustainable renewable energy sources and given the nature of perennial rivers flowing from steep gradient and rugged topography, feasibility of such plants is equally high in Nepal. The objective of this study is to determine the primary potential sites for the development of RoR type SHP sites using Geo-spatial Information System(GSIS). The use of GSIS enables precise survey of large area within a short period of time. This study has focused on the determination of locations by establishing defined criterions and methodologies and hence have located multiple locations rather than selecting one best location. The approach is applicable for the rapid initial screening of potential locations and results can facilitate detail feasibility study for the technical and economic analysis of SHP in the basin.

  • PDF

Integrated Approach for Rehabilitating the Hydrologic Cycle in the Anyangcheon Watershed(II): Prefeasibility Study (안양천 유역의 물순환 건전화를 위한 통합관리방안(II): 예비 타당성 계획)

  • Lee Kil Seong;Chung Eun-Sung;Kim Young-Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.497-501
    • /
    • 2005
  • 근래 들어 도시화로 인한 물순환 파괴를 근본적으로 연구하고 이를 정상화하기 위한 체계적이고 통합적인 유역관리 기술이 요구되고 있다. 유역통합관리의 이론을 실제로 적용한 계획을 세우기 위해서는 Heathcote(1998)가 제안한 다음과 같은 단계별 절차를 수행하는 것이 바람직하다. 단계별 절차는 (1) 대상유역에 대한 정보수집, (2) 문제점 도출, (3) 분명한 목적 수립, (4) 대안의 구성, (5) 대안의 검토, (6) 대안의 효과분석, (7) 최종계획 수립으로 이루어져 있으며 본 연구에서는 3단계의 과정에 해당된다. Heathcote(1998)는 대안의 선정과 평가를 위한 방법으로 단순평가방법(simple assessment method)과 세부평가방법(detailed assessment method)으로 구분하였는데 본 연구에서 수행한 내용은 단순평가방법에 해당된다. 본 연구는 안양천 유역에서 물순환 건전화의 핵심을 건천화 방지로 판단하고 이를 위한 대안을 크게 지표수, 지하수, 대체수자원 분야로 구분하여 제시하였다. 지표수 분야의 경우 구조적인 대안으로 소규모 저수지의 개발, 타유역에서의 도수, 보를 이용한 수량 확보, 우오수분리벽을 이용한 상류유출수의 확보, 저협수로 형성, 하천바닥에 차집관로 매설 방지 및 차집관로 유지관리 등이 있으며 비구조적인 대안으로는 기존 저수지의 유지용수 공급을 위한 운영, 유수지의 다목적 활용, 하천수 직접취수 제한 등이 있다. 지하수 분야의 대안으로는 지하철 용출수의 재이용, 지하수의 과다이용 제한, 침투증진시설의 설치 등이 있으며 대체수자원 분야의 대안으로는 하수처리수를 고도처리하여 유지용수로 재이용하는 것, 중소규모 하수처리장의 상류 설치, 대규모 사업장의 폐수를 고도처리하여 활용하는 것, 상수도의 이용 등이 있다. 이러한 여러 가지 대안들은 Walesh(1989)가 제안한 절차에 따라 기술가능성(technical feasibility), 경제성(economical efficiency), 환경성(environmental feasibility) 등을 정성적으로(qualitatively) 파악하여 실현가능한 대안을 선정하였다. 이렇게 선정된 대안들은 중유역별로 검토하여 효과가 있을 것으로 판단되는 대안들을 제시하는 예비타당성(Prefeasibility) 계획을 수립하였다. 이렇게 제시된 계획은 향후 과학적인 분석(세부평가방법)을 통해 대안을 평가하고 구체적인 타당성(feasibility) 계획을 수립하는데 토대가 될 것이다.

  • PDF

An Optimal Configuration and Feasibility Study for Community Energy System (CES) (합리적인 지역 에너지 시스템(Community Energy System)의 구성과 경제성 검토)

  • Kee W. B.;Park Y. U.;Kim K. H.;Jang S. I.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.123-125
    • /
    • 2004
  • This paper describes an optimal configuration of Community Energy System (CES) for the multi-energy consumers and analyzes economical feasibility for such system. The most of previous feasibility studies for Co-Generation plants of CES in Korea have shown negative results due to the abnormally low price of power rate in Korea. However, in order to overcome this situation a new approach was examined in this Paper. The efforts of this approach the selection of the low price but reliable facility and maximizing the capacity factor of the facility. MGT was selected in view of low price and good reliability. In order to maximize the capacity factor the system capacity should be quite lower than the actual required Electrical and Heat load of the subject entity. In this report 100 kW Co-Generation facility was selected in view of conservative analysis. The results of the analysis showed that pay back period may vary from 4 to 5 yens according to the application of LNG rates whether it is to-generation rate or the normal business rate. With the analysis in this paper we confirmed that CES is feasible even in Korea if we do not insist to select the capacity of CES to cover all the energy required but select a smaller size of CES compared to the actual requirement, which can allow full load operation of the system continuously.

  • PDF