Proceedings of the Korean Institute of Building Construction Conference
/
2005.05a
/
pp.13-16
/
2005
Generally, as corrosive protection processing of a steel structure, zinc galvanizing and heavy duty coating paint are applied. However, zinc galvanizing has the difficulty of restriction of a size, or on-site construction. Moreover, heavy duty coating paint has a problem with many administrative and maintenance expenses with short problem of adhesion, corrosion generating of a damage portion, and maintenance management cycle. In this study, a salt water spray test, CASS test, and the electrochemistry examination were carried out for the thermal metal spray method of construction for corrosive protection performance evaluation. Moreover, the corrosive protection life of a thermal metal spray method of construction was quantitatively calculated on the basis of this experiment. in consideration of LCC, the economical efficiency of a general corrosive protection method of construction and a thermal metal corrosive protection method of construction was compared. Consequently, although initial construction expense was estimated 16 to $30\%$ high, as for a thermal metal spray method of construction, it turns out that the administrative and maintenance expenses for 100 years became cheap 9.3 to 13 or more times.
Kim, Jee-Hye;Kim, Jae-Moon;Cha, Hee-Sung;Shin, Dong-Woo
Korean Journal of Construction Engineering and Management
/
v.7
no.6
/
pp.112-120
/
2006
Although waste management in construction industry has a significant impact on both economical and environmental issues, the current level of waste management performance in Korean construction is reported as relatively low. To improve any type of management performance, it is necessary to diagnose the current status of the performance level. In this context, this research is aimed to identify important factors in influencing the waste management performance and to develop an evaluation tool for the purpose of assessing the level of the performance for a particular construction site. In this paper, 59 influential factors have been identified and categorized into five classes, i.e., manpower, material, method, management, and policy, in terms of the characteristics of the factors. In addition, an evaluation tool has been developed in order to effectively quantify all the 59 factors based on a thorough industry survey. The output of the Tool, which is Waste Management Index, effectively assess the level of waste management performance for a particular project and provide with the most leveraged factors in need for improvement in waste management performance.
Korean Journal of Construction Engineering and Management
/
v.19
no.6
/
pp.34-45
/
2018
Nuclear power plant(NPP) is a large-sacle national infrastructure with total project cost of 77 billion dollars and period of 10 years or more. Moreover, since it is operated over 60 years, NPP is a facility closely related to national economy and public safety. Therefore, accurate information and consistent physical configuration should be maintained to enable accurate and economical decision making in NPP project process such as design, construction, operation, and decommission. Since NPP industry is more complicate and regulated than other industries, the importance of configuration management(CM) has been widely recognized in the early days. However, there were limitations in implementing systematic CM due to unclear purpose and subject. Therefore, this paper suggests a room-based database for CM in NPP reflects design requirements and facility configuration information.
Kim, Sang-Bum;Choi, Ja-Un;Jeong, Dae-Young;Kim, Eun-Ja
Journal of Agricultural Extension & Community Development
/
v.17
no.3
/
pp.587-606
/
2010
Theme trail construction should be changed from existing form which connects line to line, or point to line. It should be developed into area form. The project of Trail construction must be converted in area form. The aggregate of the points which is a base element of walk is a line, and the harmonious connection of various line is the area. The close relationship with points and lines is important to operate the project of trail construction in area form effectively. Subject of the project of Theme trail construction of area form must become the village residents which are being contiguous in trail. They must operate management and about trail. The project of Trail construction of area form the plan making is established and if the subjects which, will operate and manage that place are decided upon according to theme must construct the trail of the wide area concept which connects the trail of that trail and neighborhood. If becomes like that local resident and the citizen will be able to coexist with mediation of Trail. If the project of Trail construction of village resident leading is propelled applying rural amenity resources in a way, the trail model which one phases advances could be presented for ecological, economical and cultural.
Korean Journal of Construction Engineering and Management
/
v.7
no.3
s.31
/
pp.159-168
/
2006
In order to respond to interest and regulations in sustainable environment which is increasing, construction industry needs to establish a sustainable production system. When generation of wastes can be diminished and recycling of them raised in the construction site as a part of a sustainable production system, it might contribute to not only establishing a sustainable production system but also gaining economical profit. This study is a preliminary research for establishing a sustainable production system, which aims to identify construction waste generation patterns and factors causing construction waste generation. Case studies were implemented to investigate these patterns and factors.
Korean Journal of Construction Engineering and Management
/
v.8
no.4
/
pp.146-154
/
2007
Recently, the construction wastes increase rapidly due to the revitalization of reconstruction and redevelopment, the development of new urbanization of large housing development, the expansion of social infrastructure, and so on. To solve rapid increase of construction waste, the government established "the rule on the promotion of recycling of construction waste" in December, 2003. According to the rule, construction wastes can be recycled by either processing on commission or discharger of construction waste. This study proved the validation of site recycling for construction waste as economic efficiency is analyzed through the case study of site recycling at large housing development district. Using the sensitivity analysis, factors affecting the cost of site recycling was analyzed and the break-even point for the cost of site recycling was estimated according to the factors.
International conference on construction engineering and project management
/
2022.06a
/
pp.1250-1251
/
2022
Measuring management is an important part of preventing the collapse of retaining walls in advance by evaluating their stability with a variety of measuring instruments. The current work of measuring management requires considerable human and material resources since measurement companies need to install measuring instruments at various places on the retaining wall and visit the construction site to collect measurement data and evaluate the stability of the retaining wall. It was investigated that the applicability of the current work of measuring management is poor at small and medium-sized urban construction sites(excavation depth<10m) where measuring management is not essential. Therefore, the purpose of this study is to develop a laser sensor-based hardware to support the wall displacement measurements and their control software applicable to small and medium-sized urban construction sites. The 2D lidar sensor, which is more economical than a 3D laser scanner, is applied as element technology. Additionally, the hardware is mounted on the corner strut of the retaining wall, and it collects point cloud data of the retaining wall by rotating the 2D lidar sensor 360° through a servo motor. Point cloud data collected from the hardware can be transmitted through Wi-Fi to a displacement analysis device (notebook). The hardware control software is designed to control the 2D lidar sensor and servo motor in the displacement analysis device by remote access. The process of analyzing the displacement of a retaining wall using the developed hardware and software is as follows: the construction site manager uses the displacement analysis device to 1)collect the initial point cloud data, and after a certain period 2)comparative point cloud data is collected, and 3)the distance between the initial point and comparison point cloud data is calculated in order. As a result of performing an indoor experiment, the analyses show that a displacement of approximately 15 mm can be identified. In the future, the integrated system of the hardware designed here, and the displacement analysis software to be developed can be applied to small and medium-sized urban construction sites through several field experiments. Therefore, effective management of the displacement of the retaining wall is possible in comparison with the current measuring management work in terms of ease of installation, dismantlement, displacement measurement, and economic feasibility.
Kim Hae-Jung;Kang Hyun-Kui;Han Choong-Hee;Kim Sun-Kuk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.359-362
/
2001
Most old apartment housing have been replaced with new ones by means of the reconstruction. But with the change of the construction environment, remodeling is introduced as a new alternative for the replacement. Remodeling is expected to reduce national loss owing to the early reconstruction of old apartments resulted from economical and functional deterioration. But there still remains a lot of problems to be first solved for Remodeling. One of those is to figure out how to perform an economic feasibility analysis effectively. The researches of remodeling done under the rally stage are not sufficient in economic feasibility for apartment housing. Therefore, this paper suggests an effective method for the economic evaluation of remodeling projects focusing on a rental high-rise apartment.
Proceedings of the Korean Geotechical Society Conference
/
2009.09a
/
pp.643-650
/
2009
The necessary consequence by the rapid economic growth in large-scale urban excavation is increasing. If the site is the congested in downtown, the scale of excavation will get the large-scale and the extreme depth. We have achieved a high level technology internationally by the design and construction of underground excavation since 1980's. But the accidents during excavation are frequently occurring. So, this demage instigates the human life loss as well as economical loss. The recent accident is come about the damage for public facilities such as the railroad, subway and etc. in addition to the loss of life and property. For these reasons, the recent accident is being caused the damage of copious social overhead capital. The reasons of collapse during excavation can be classified roughly into the administrative part(sanction, permission), the investigation and design, the construction and management and etc. In this study the close check for the cases of the recent collapse is performed and the improvement course for the prevention of collapse is found.
Airphotos taken for the management of unauthorized houses in large cities like Seoul are very important material for understanding periodic change of topogrpahy. A research on construction of digital database using airphoto are required for the efficient management of existing airphotos, for the easy and better understanding of topography together with 1; 1,000 digital topographic map, and for the easy updating of topographic data. Digital data using 1 ; 5, 000 scale airphoto scanned 1,000 dpi has been experimentally constructed from georeferenced images to orthorectified images. The technical and economical possibilities for the construction of digital database using apripjoto have been checked based on the experimentation and future direction of how to make digital database using existing airphoto has been suggested.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.