• Title/Summary/Keyword: economic life cycle

Search Result 473, Processing Time 0.026 seconds

A risk-based framework for design of concrete structures against earthquake

  • Hassani, Mohammadhassan;Behnam, Behrouz;Maknoon, Reza
    • Computers and Concrete
    • /
    • v.25 no.2
    • /
    • pp.167-179
    • /
    • 2020
  • Optimal design of structures against earthquake loads is often limited to reduce initial construction costs, while the cost induced to structures during their useful life may be several times greater than the initial costs. Therefore, it is necessary to consider the indirect costs due to earthquakes in the design process. In this research, an integrated methodology for calculating life cycle cost (LCC) of moment-resisting concrete frames is presented. Increasing seismic safety of structures and reducing human casualties can play an important role in determining the optimal design. Costs incurred for structures are added to the costs of construction, including the costs of reconstruction, financial losses due to the time spent on reconstruction, interruption in building functionality, the value of people's life or disability, and content loss are a major part of the future costs. In this research, fifty years of useful life of structures from the beginning of the construction is considered as the life cycle. These costs should be considered as factors of calculating indirect costs of a structure. The results of this work represent the life cycle cost of a 4 story, 7 story, and 10 story moment-resisting concrete frame by details. This methodology is developed based on the economic conditions of Iran in 2016 and for the case of Tehran city.

A Study on Economic Analysis and Performance Appraisal of Compact Type Variable Air Volume (컴팩트형 VAV 공조기의 성능평가와 경제성 분석에 관한 연구)

  • Kim, Dong-Cheol;Chung, Kwang-Seop;Kim, Young Il
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.1
    • /
    • pp.44-49
    • /
    • 2015
  • Ceiling cooling and heating system that consider load arrangement and space in the ceiling needs to be developed. Therefore, experimental and economic changes were done to verify the performance of compact type VAV. The test results were as follow. 1) Noise test result, measuring approximately 50.4 dB~56.6 dB (before ceiling in landfill), had a better ceiling deadline than the current measure, about a 10 dB noise reduction, so that the office baseline (40~50 dB) noise was judged to be less than test. 2) For the static pressure test result, taking out an outside hydrostatic 25 mmAq, 24.8 mmAq was measured, respectively, at the point. 3) For the life-cycle cost analysis result, the initial investment cost, maintenance replacement costs, and maintenance costs increased 0.2%, but the energy savings ratio was 19.5% while the whole life cycle savings of 40 years LCC was reduced 11.9%.

Life cycle cost analysis and smart operation mode of ground source heat pump system

  • Yoon, Seok;Lee, Seung-Rae
    • Smart Structures and Systems
    • /
    • v.16 no.4
    • /
    • pp.743-758
    • /
    • 2015
  • This paper presents an advanced life cycle cost (LCC) analysis of a ground source heat pump (GSHP) system and suggests a smart operation mode with a thermal performance test (TPT) and an energy pile system constructed on the site of the Incheon International Airport (IIA). First, an economic analysis of the GSHP system was conducted for the second passenger terminal of the IIA considering actual influencing factors such as government support and the residual value of the equipment. The analysis results showed that the economic efficiency of the GSHP system could be increased owing to several influential factors. Second, a multiple regression analysis was conducted using different independent variables in order to analyze the influence indices with regard to the LCC results. Every independent index, in this case the initial construction cost, lifespan of the equipment, discount rate and the amount of price inflation can affect the LCC results. Third, a GSHP system using an energy pile was installed on the site of the construction laboratory institute of the IIA. TPTs of W-shape and spiral-coil-type GHEs were conducted in continuous and intermittent operation modes, respectively, prior to system operation of the energy pile. A cooling GSHP system in the energy pile was operated in both the continuous and intermittent modes, and the LCC was calculated. Furthermore, the smart operation mode and LCC were analyzed considering the application of a thermal storage tank.

Reappraisal of Feed-In Tariffs of Electricity Generating from New and Renewable Energy Sources (신.재생에너지원 발전전력 차액지원을 위한 현행 기준가격의 재산정)

  • Kim, Eun-Il;Kim, Keon-Hoon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.04a
    • /
    • pp.281-286
    • /
    • 2008
  • Current feed-in tariffs(FIT) of Electricity generating from new and renewable energy sources are reappraised with the corrected formula of levelized generation cost(LGC) of utility power. The LGC of new and renewable electricity should be formulated in explicitly reflecting the capital cost and corporate tax during the economic life cycle based on its realistic application data. An applicable term of the FITs should, especially, be equal to the economic life cycle. The revised FITs issued in 2006 were, however, derived from the incorrect formula described in the study of KERI(Korea Electrotechnology Research Institute), and consequently misestimated. The reappraisal values for FIT of new and renewable electricity were shown and interpreted in this paper. An FIT of PV more than 30 kW, for example, should be 972.86 won/kWh instead of current 677.38 won/kWh increasing 43.6%. An upward revision of other FITs for new and renewable electricities should also be required in the range of 8.6% to 47.3%.

  • PDF

Life Cycle Costing through Operating Number Control of Air Conditioning Systems in Office Buildings (사무소 건축물의 공조시스템 대수제어 여부에 따른 LCC 분석)

  • Park, Ryul;Jung, Soon-Sung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.14 no.11
    • /
    • pp.981-988
    • /
    • 2002
  • Generally, the term "energy saving is economical" is appropriate for the national view point and for design and assessment of one system, but not appropriate when choosing the system by comparing alternative systems in the early design step. Sometimes, non-energy saving system is more economical than energy saving system because of the price of electricity, gas or oil, which are used for operating the air conditioning system. Therefore, when designing the system, we should consider the efficient alternatives through economic assessment of energy saving method. However, research on non-operating number control of the system is not sufficient because it is more common to use operating number control of the system for most economic assessment of air conditioning system. For this reason, this research can provide the economics through operating number control as basic design data. The data obtained through assesment of Life Cycle Cost based on amount of yearly energy use, were produced by system simulation of HASP/ACLD/8501 and HASP/ACSS/8502 for six alternative heating/cooling systems based on constant air volume conditioning system, which is widely used for medium and large office buildings in Busan.

A Case Study on the Reduction Costs Prediction of a Reinforced Concrete Bridge using LCC method (Life Cycle Cost 기법에 의한 RC Slab 교량의 절감비용 예측에 관한 연구)

  • Kwon, Suk-Hyun;Kim, Sang-Beom;Park, Yong-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.5
    • /
    • pp.160-170
    • /
    • 2007
  • This study predicts Life Cycle Cost of RC Slab bridge case in maintenance and operation level and calculated economic efficiency by the avoidable costs of a bridge. This result of the study can be summarized as follow: (1) LCC analysis model on the bridge case is suggested. (2) Maintenance and operation level of a bridge have been divided, and LCC of the bridge case has been predicted at current maintenance and operation level and required maintenance and operation level. (3) Reduction costs is predicted by LCC of the bridge case, and its economic efficiency is calculated.

A Models of Economic Analysis in Safety Diagnosis for Remodeling Strategies of Apartment Housing (공동주택의 리모델링 전략을 위한 안전진단의 경제성분석 모델)

  • Seo Kwang-Jun;Choi Mi-Ra;Shin Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.164-171
    • /
    • 2005
  • The importance of the life cycle cost analysis(LCCA) for apartment housing remodeling projects has been fully recognized over the last decade. Accordingly theoretical models, guidelines, and supporting software systems were developed for the life cycle cost analysis of apartment housing remodeling systems. However, the level of consensus on LCCA results is still low due to the lack of reliable data on remodeling activities for safety diagnosis. in order to predict the reliability based LCCA of the given case, suggested the remodeling strategies level after reviewing other related materials. Apply the real information of the economic index. And based on such analytical measures, remodeling and operation cost and LCC in remodeling strategies level have been predicted; suggests the basic information about remodeling interventions level for the apartment housing. The LCC analysis models and the fuzzy logic based safety assessment presented in this study can greatly contribute to the value-oriented design alternative selection, estimation of the economic analysis, and the allocation of budget for apartm.

Optimal Target Reliability of Bridges Based on Minimum Life-Cycle Cost Consideration

  • Wang, Junjie;Lee, J-C
    • Computational Structural Engineering : An International Journal
    • /
    • v.2 no.1
    • /
    • pp.11-17
    • /
    • 2002
  • Cost-effectiveness in design is considered for determining the target reliability of concrete bridges under seismic actions. This objective can be achieved based on the economic optimization of the expected life-cycle cost of a bridge, which includes initial cost, direct losses, and indirect losses of a bridge due to strong earthquakes over its lifetime. A separating factor is defined to consider the redundancy of a transportation network. The Park-Ang damage model is employed to define the damage of a bridge under seismic action, and a Monte Carlo method based on the DRAIN-2DX program is developed to assess the failure probability of a bridge. The results for an example bridge analyzed in this paper show that the optimal target failure probability depends on the traffic volume carried by the bridge and is between 1.0×10/sup -3/ to 3.0×10/sup -3/ over a life of 50 years.

  • PDF

Development and Application of the Spare-parts Cost Estimating Relationships (수리부속비 비용추정식 개발과 활용방안)

  • Ryu, Min-Kyu;Lee, Yong-Bok;Kang, Sung-Jin
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.4
    • /
    • pp.601-611
    • /
    • 2010
  • Currently, a life cycle cost estimates(LCCE) is the most important factor in weapon system acquisition process. However, operation and maintenance(O&M) cost related studies are insufficient from the previous literature survey. O&M cost consists of various cost factors such a man power, maintenance and direct & indirect support costs. We have known that spare-parts cost is a key factor in the O&M cost. In this paper, we developed the spare-parts cost estimating relationships(CERs) of fixed-wing aircraft and armored vehicle weapon systems which include 4 historical cost drivers ; system acquisition cost, deterioration rate, localization rate, mission characteristic. Furthermore, we proposed the application methodologies that O&M cost estimating, total life cycle cost estimating and determination of the economic life using the spare-parts CERs.

The Estimation of Economic Service Life on Manufacturing Equipments Which It Follows in Technological Obsolescence (제조설비의 기술진부화에 따른 경제적 내용연수 추정)

  • Cho, Jin-Hyung;Oh, Hyun-Seung;Lim, Taek;Jung, Su-Il;Lee, Jung-Youp;Kim, Byung-Keug
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.1
    • /
    • pp.74-79
    • /
    • 2011
  • Engineering valuation is a specialized discipline requiring expert knowledge and judgment, which scientifically estimates the economic value of industrial properties. By industrial properties, we mean engineering structures such as mines, factories, buildings, machines, and other industrial facilities as well as facilities of public enterprises. Particular industrial properties can have longer economic life if their performance is excellent and they are still suitable for current manufacturing needs. If not, its economic life will be shorter. As speed of technological progress becomes rapid, life-cycle and development period of a product is becoming shorter. In an industry characterized by rapid development of technology, industrial properties can become obsolescent faster. Even if they are in good working order, they could be no longer suitable for manufacturing new products based on radically different technology. In our research, we apply engineering approach to estimating functional economic life by factoring in technological obsolescence in such an industry.