Browse > Article

A Case Study on the Reduction Costs Prediction of a Reinforced Concrete Bridge using LCC method  

Kwon, Suk-Hyun ((주)도명E&C)
Kim, Sang-Beom ((주)도명E&C 기술연구소)
Park, Yong-Jin ((주)도명E&C CM사업부)
Publication Information
Journal of the Korea institute for structural maintenance and inspection / v.11, no.5, 2007 , pp. 160-170 More about this Journal
Abstract
This study predicts Life Cycle Cost of RC Slab bridge case in maintenance and operation level and calculated economic efficiency by the avoidable costs of a bridge. This result of the study can be summarized as follow: (1) LCC analysis model on the bridge case is suggested. (2) Maintenance and operation level of a bridge have been divided, and LCC of the bridge case has been predicted at current maintenance and operation level and required maintenance and operation level. (3) Reduction costs is predicted by LCC of the bridge case, and its economic efficiency is calculated.
Keywords
Life cycle cost; RC slab bridge; Maintenance and Operation level; Reduction costs;
Citations & Related Records
연도 인용수 순위
  • Reference
1 건설교통부, 교량현황조서, 2001.
2 권석현, "LCC 기법에 의한 도로포장형식의 경제성 분석에 관한 연구", 석사학위논문, 중앙대학교 건설대학원, 2000.
3 시설안전기술공단, "LCC 개념을 도입한 시설안전관리체계 선진화 방안 연구", 건설교통부, 2001.
4 통계청, 한국의 주요경제지표, 1999.
5 한국은행, 경제통계연보, 1999.
6 시설안전기술공단, "도로교의 공용수명 연장방안 연구", 건설교통부, 2000.
7 Ehlen, M. A., "Life-Cycle Costs of Fiber-Reinforced-Ploymer Bridge Decks", Journal of Materials in Civil Engineering, ASCE, Vol. 11, No. 3, 1999, pp. 224-231.   DOI
8 김상범, "RC Slab 교량의 Life Cycle Cost 분석에관한 연구", 석사학위논문, 중앙대학교, 2001.
9 이철규, "퍼지 및 유전 알고리즘에 의한 교량 시설물의 적정유지관리 방법", 박사학위논문, 중앙대학교, 2000.
10 한국물가협회, 월간물가자료, 2001.
11 한국건설기술연구원, "교량관리체계(BMS) 개선에 관한 연구", 건설교통부, 1999.
12 OECD Scientific Expert Group, "Bridge Rehabilitaion and Strengthening", OECD, Paris. 1992.
13 국토개발원, 고속도로 사업효과 조사, 1995.