Influence of Delay Time and Priming Location on the Blast-Induced Ground Vibration (발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향)

  • Kang, Choo Won;Ryu, Bok Hyun;Choi, Tae Hong
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.97-109
    • /
    • 2014
  • In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

Characteristics of Tunnel Convergence Behaviour based on Variation of Rock Mass Rating (암반 등급 변화에 따른 터널 내공 변위 거동 특설)

  • Kim, Kwang-Yeom
    • The Journal of Engineering Geology
    • /
    • v.18 no.4
    • /
    • pp.545-553
    • /
    • 2008
  • Face mapping and displacement monitoring during tunnel construction are the most influential information for the stability assessment of ground and around structures. Especially, the result of face mapping and displacement analysis is essential to the excavation and support design in NATM which is based on the drilling and blasting. However, there have not been so many studies to put those useful information into practice for decision-making process during construction. The study reviewed the tunnel behaviour based on the RMR rating and displacement monitoring when the geological condition of rock mass varies inevitably. The study analysed the crown settlement using convergence equation in order to compensate the disparity induced by the location and time of measurement and found a distinct relation between the geological condition and the line of influence. As a result of analysing the various parameters related to the tunnel convergence according to the geological condition, the study suggested the basic knowledge about the relation between face mapping and displacement behaviour of tunnel.

Case Study on the Tunnel Collapse at the Shallow Depth (NATM터널 저토피 구간에서의 막장붕락 사례연구)

  • Baek Ki-Hyun;Roh Jong-Ryun;Kim Yong-Il;Cho Sang-Kook;Hwang Nag-Youn
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.102-110
    • /
    • 2005
  • ○ ○ tunnel that is located at Iksan - Jangsu freeway ○ ○, has collapsed during construction at the valley with shallow depth. Although, the site investigations, such as TSP, drilling exploration and so of indicated the presence of discontinuities in this section. The RMR was upgraded and the construction were carried out because that not only actual rock qualities were relatively good during construction but also the tunnel foe was stabilized. However, the tunnel was collapsed at the same time blasting of full face, and surface and underground water was infiltrated due to the settlement of the upper part of the tunnel face. To restore the collapsed section, 3-d tunnel stability analysis was performed and suitable reinforcement methods were chosen. The cavity of the upper tunnel face was stabilized by means of UAM and ALC injection. And the settlement was restored using L.W grouting method.

Characteristics of defect on segmental lining of TBM tunnel in operational subway (운용중인 국내 지하철 TBM터널의 세그먼트라이닝 결함특성 분석)

  • Choo, Jinho;Lee, DongHun;Noh, EunChul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.109-128
    • /
    • 2022
  • The precise inspection for safety and diagnosis (PISD) of tunnel has been conducted by the special act on safety control of public structures. However, the present assessment for the segmental lining of TBM tunnel has limitation such as: NDTs for integrity, segmental configuration for field inspection, and consideration for jacking system. Even if the number of TBM tunnel is less than 1% of enrolled facility in FMS, more attention to maintenance should be necessary due to its usage such as multi-use facility and national important facility. Compared to NATM tunnel, excavated by drilling and blasting and then installed lining by cast-in-place within 6~12 m, TBM tunnel is cut out ground by disk and cutter-bit and then assembled 7 pieces of precast segment, 1.2~1.4 m wide. Different features of design, construction, and maintenance should be considered to be more exact evaluation of TBM tunnel. The characteristics of defect is categorized and analyzed with 11 operational TBM tunnels in domestic subway. To be more comprehend various particular defects, foreign studies have been also adapted. Crack and leakage are categorized in 7 patterns. Breakage/spalling and corrosion are also grouped into 3 patterns. Patterned defects or damages are fed back in design, construction, and are useful guidelines for maintenance stage in future.

PRIMARY STABILITY OF IMPLANTS IN ILIUM OF CADAVER BY THE METHODS OF RECIPIENT SITE PREPARATION (사체의 장골에서 수용부 형성방법에 따른 임플란트 일차 안정성)

  • Sim, Jung-Woo;Cho, Jin-Yong;Kook, Min-Suk;Park, Hong-Ju;Oh, Hee-Kyun
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.34 no.2
    • /
    • pp.180-186
    • /
    • 2008
  • Purpose: This study was performed to evaluate the effect of the implant recipient site preparation methods on primary stability of implants with the instruments of $Osstell^{TM}$ and $Periotest^{(R)}$ in the iliac bone of cadaver. Methods and materials: The 8 iliac bones in 4 cadavers and implants treated with resorbable blasting media (RBM) were used. $Periotest^{(R)}$ (Simens AG, Germany) and $Osstell^{TM}$ (Model 6 Resonance Frequency Analyser: Integration Diagnostics Ltd., Sweden) were used to measure primary stability of implants. Implants were inserted into the iliac crest of the cadaver. In control group, the recipient site was prepared according to the manufacturer's recommendation: 1.8 mm guide drill, 2.0 mm initial drill, 2.7 mm pilot drill, 2.7 mm twist drill, 3.0 mm twist drill, 3.3 mm pilot drill, 3.3 mm twist drill, and 3.3 mm countersink drill as well as tapping drill were used in order. In the group 1, implant recipient sites were prepared by sequentially drilling from 1.8 mm guide drill to 3.0 mm twist drill and then inserted implants without countersinking and tapping. In the group 2, implant recipient sites were prepared to 3.0 mm twist drill and countersink drill and then inserted implants without tapping. In the group 3, the sites were prepared to 3.0 mm twist drill and countersink drill as well as tapping drill. In the group 4, the sites were prepared to 3.3 mm twist drill. In the group 5, the sites were prepared to 3.3 mm twist drill and countersink drill. A total of 60 implants were placed (n=10). The stability was measured using $Osstell^{TM}$ and $Periotest^{(R)}$ mesiodistally and buccolingually. To compare the mean stability of each group statistically, One-way ANOVA was used and correlation of instrument were analyzed using SPSS 12.0. The results obtained were as follows; 1. The stability of group 1 measured using $Osstell^{TM}$ and $Periotest^{(R)}$ buccolingually showed the highest, and there are significant difference statistically between control group and experimental group 1,2,4 in each instruments respectively (p<0.05). 2. The stability of group 1 measured using $Osstell^{TM}$ and $Periotest^{(R)}$ mesiodistally showed the highest. There are significant difference statistically between control group and all experimental groups in $Osstell^{TM}$, and between control group and experimental group 1,2,3,4 (p<0.05). 3. There are high correlation between the measurements of $Osstell^{TM}$ and $Periotest^{(R)}$ (p<0.05). Conclusion: These results indicate that the primary stability of implant can be obtained by the recipient sites preparation with smaller diameter drill than that of implant or minimal drilling.