• Title/Summary/Keyword: downstream of Dam

Search Result 437, Processing Time 0.022 seconds

Dilemma of a small dam with large basin area under climate change condition

  • Jeong-Hyeok Ma;Chulsang Yoo;Tae-Sup Yun;Dongwhi Jung
    • Computers and Concrete
    • /
    • v.33 no.5
    • /
    • pp.559-572
    • /
    • 2024
  • Problems of under-sized dams (small dams with large basin area) could get worse under the global warming condition. This study evaluates the possible change of these problems with the Namgang Dam, an under-sized dam in Korea. For this purpose, first, this study simulates the dam inflow data using a rainfall-runoff model, which are then used as input for the reservoir operation. As a result, daily dam storage, dam release, and dam water supply are derived and compared for both past observed period (1973~2022) and future simulated period (2006~2099) based on the global warming scenarios. Summarizing the results are as follows. First, the inflow rate in the future is expected to be increased significantly. The maximum inflow could be twice of that observed in the past. As a result, it is also expected that the frequency of the water level reaching the high level is increasing. Also, the amount and frequency of dam release are to be increased in the future period. More seriously, this increase is expected to be concentrated on rather extreme cases with large dam release volume. Simply, the condition for flood protection in the downstream of the Namgang Dam is becoming worse and worse. Ironically, the severity of water shortage problem is also expected to become much worse. As the most extreme case, the frequency of no water supply was zero in the observed period, but in the future period, it becomes once every five years. Both the maximum consecutive shortage days and the total shortage volume are expected to become more than twice in the future period. To prevent or mitigate this coming problem of an under-sized dam, the only countermeasure at this moment seems to be its redevelopment. Simply a bigger dam with larger dam reservoir can handle this adverse effect more easily.

Change of Hydraulic Characteristics in the Downstream Keum River after the Construction of Estruary Dam (금강하구둑 건설로 인한 금강하류부의 수리 특성 변화)

  • 박승기
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.41 no.5
    • /
    • pp.68-76
    • /
    • 1999
  • The purpose of the study was to investigated the change of hydraulic characteristics like water surface profile and rivered section in the down stream of Keum river after the construction of esturary dam. The effect of esturary dam on the flood control in the Keum river was recognized with the data of two flood events happened in July, 1987 before the construction and in August, 1995 after the construction of estuary dam. For example , duration time above the water level of the warning -flood was changed from 46.5 to 42.8 hours and duration time above the eater level of the danger-flood was changed from 24.7 to 19.8 hours at the Kyuam station. The time difference to reach the water level of the designated -flood between Kyuam and Kangkyung was changed from 3 hours in 1987 to 12 hours and 20 minutes in 1995. The water surface slope of river decreased 25.6% between estuary dam and Kangkyung and increased 16.5% between Kangkyung and Kyuam, and decreased 8.8% between Kyuam and Kongju. As the result, velocity was getting faster and river bed was scoured in the reach of Kangkyung and Kyuam, and velocity was getting slower and river bed was sedimented in the reach of Kangkyung and estury dam.

  • PDF

Problems of Water Use and Estimation of Water Right in North Han River Shared by North and South Korea (I) -Analysis of Diversion Impacts on Downstream Area by Imnam Dam (남북공유하천 북한강의 물이용 문제점 및 수리권 추정 (I) -임남댐 유역변경에 의한 하류 영향 분석)

  • Ahn, Jong-Seo;Jung, Kwan-Sue;Lee, Gwang-Man
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.4
    • /
    • pp.305-314
    • /
    • 2011
  • Imnam Dam construction and inter-basin water transfer use by North Korea have caused several problems including water resources management aspects in the downstream reach of North Han River. Therefore, cooperative works between North and South Korea are required to make a reasonable management situation of the shared river for water quantity and quality. However, efforts by the North and the South has done not enough to achieve equitable water use in the shared river. This study analyzes main impacts caused by Imnam Dam in key sectors for reviewing water use right regarded as the most important decision-making criterion in international rivers. As the results, water deficit by Imnam Dam is calculated at 379 million $m^3$/year when river drought year for water assessment is set in 1978 in the Han River basin. Additionally hydropower production is decreased by 234 GWh/year in exclusive hydropower generation dams. In respective of water quality, BOD concentration is increased by 0.065 ppm at Sambongli in North Han River. Finally it is identified that unequitable water use based on the absolute territorial sovereignty by North Korea in North Han River has directly and indirectly affected severe impacts to South Korea as the downstream user.

Identification of Expanding the Usability of the Water Resources in Hwacheon Dam System Due to the Flood Surcharging Effects of Peace Dam (평화의 댐 흥수지체 효과에 따른 화천댐 계통 이수 능력의 증대에 대한 검정)

  • Yu, Ju-Hwan;Park, Chang-Geun;Jo, Hyo-Seop
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.6
    • /
    • pp.617-625
    • /
    • 2001
  • Peace dam constructed against the water attack had stopped in the first step, linked with Hwacheon dam through bypass tunnels and had an effect of flood surcharging in its pocket on Hwacheon dam downstream. To study the utility of Peace dam, the flood control effects of Peace dam and the restricted water level (RWL) in Hwacheon dam were reviewed and identified with operating Hwacheon dam system. Analysing the results the ideas of expanding the usability of the water resources in Hwacheon dam system were suggested. To do that, the criteria and the model of reservoir operation were established frist and the optimization of the operation have done. Based on the results the performance of the optimization was evaluated as an reference coefficient with relative value of the registered data to the optimized. And examining several alternatives for the RWL in Hwacheon reservoir operation made more feasible RWL suggested. And its economic benefit was also reckoned.

  • PDF

Flood Routing Using Numerical Analysis Model (수치해석모형에 의한 홍수추적)

  • 이용직;권순국
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.31 no.1
    • /
    • pp.117-130
    • /
    • 1989
  • In this study, an implicit one-dimensional model, DWRM(Dynamic Wave Routing Model) was developed by using the four-point weighted difference method. By applying the developed model to the Keum River, the parameters were calibrated and the model applicability was tested through the comparison between observed and computed water levels. In addition, the effects of the construction of an estuary dam to the flood wave were estimated as a result of the model application. The results of the study can be summarized as follows; 1. The roughness coefficients were evaluated by comparison between observed and computed water level at Jindu, Gyuam and Ganggyeung station in 1985. The Root Mean Squares for water level differences between observed and computed values were 0.10, 0.11, 0. 29m and the differences of peak flood levels were 0.07, 0.02, 0. 07m at each station. Since the evaluated roughness coefficients were within the range of 0.029-0.041 showing the realistic value for the general condition of rivers, it can be concluded that the calibration has been completed. 2. By the application of model using the calibrated roughness coefficients, the R. M. S. for water level differences were 0.16, 0.24, 0. 24m and the differences of peak flood level were 0.17, 0.13,0.08 m at each station. The arrival time of peak flood at each station and the stage-discharge relationship at Gongju station agreed well with the observed values. Therefore, it was concluded that the model could be applied to the Keum River. 3. The model was applied under conditions before and after the construction of the estuary dam. The 50-year frequency flood which had 7, 800m$^3$/sec of peak flood was used as the upstream condition, and the spring tide and the neap tide were used as the downstream condition. As the results of the application, no change of the peak flood level was showed in the upper reaches of 19.2km upstream from the estuary dam. For areas near 9.6km upstream from the estuary dam, the change of the peak flood level under the condition before and after the construction was 0. 2m. However considering the assumptions for the boundary conditions of downstream, the change of peak flood level would be decreased.

  • PDF

Resilience Assessment of Dams' Flood-Control Service (댐 홍수조절기능의 회복탄력성 산정)

  • Kim, Byungil;Shin, Sha Chul;Kim, Du Yon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1919-1924
    • /
    • 2014
  • Recently, due to the climate change, the frequency and intensity of extreme rainfall events have been continuously increased in regions of South Korea. As a consequence, safety issues have been raised especially in the hydrologic safety of old dams designed and constructed by the old standards. In general, for improving hydrologic safety of existing dams, two options are considered: 1) raising dam crest; and 2) constructing or expanding an emergency spillway. In this process, the main criteria of alternative selection are overtopping possibility and cost efficiency of each alternative. This approach is easy to implement but it is subject to major limitation for the proper evaluation of alternatives, overlooking downstream flood damages by any controlled flow of water that is intentionally released from dams to eliminate the possibility of overtopping. Therefore, this study suggests a framework for evaluating the dam safety strengthening alternatives in terms of a comprehensive flood control by applying the concept of resilience. The case study shows that the resilience-based evaluation framework which considering downstream flood damages is effective in the selection of dam safety strengthening alternatives.

Distribution Rate of Particles Exiting Jinju Bay in the Namgang Dam Freshwater Discharge (남강댐 담수 방류시 진주만을 빠져나가는 입자들의 수로별 분배율 평가)

  • Namyoun No;Minsun Kwon;Hyeryeon Kwon;Jonggu Kim
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.6
    • /
    • pp.576-586
    • /
    • 2023
  • In this study, a numerical particle tracking experiment was conducted to assess the distribution characteristics of freshwater exclusion resulting from the discharge of Gahwa Stream into Sacheon, Jinju, and Gangjin bays, located downstream of the Namgang Dam. The number of particles discharged into Noryang Channel, Daebang Channel, and Changseon Strait was compared by releasing 1000 particles through Gahwa Stream under three discharge conditions: no discharge, discharge during rainfall, and discharge during flood. Evidently, the percentage of particles in the Noryang Channel increased, whereas that in the Daebang Channel decreased as the discharge from the Gahwa Stream increased. Approximately 95% of the material located downstream of the Gahwa Stream generally escaped through the Daebang Channel. However, as the discharge from the Namgang Dam increased due to rainfall, the percentage of particles in the Noryang Channel increased, reaching 45.5% during floods.

Analysis on Hydraulic Characteristics in Down Stream of Dam for Fishway Construction (어도설치를 위한 댐하류 수리특성 분석)

  • Maeng, Seung-Jin;Lee, Bae-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.5
    • /
    • pp.11-20
    • /
    • 2007
  • In this study, we reviewed the optimal space for the fishway and fish storage establishment in the section between the downstream of the Hwacheon dam and the confluence of the Pungsan river. The hydraulic stability of these facilities was also examined. In the section between the downstream of Hwacheon dam and the confluence of Pungsan river, the release flow of Hwacheon dam was set at $5,495m^3/s,\;6,110m^3/s$ and $7,537m^3/s$, and numerical simulations were executed for each instance using the HEC-RAS model and RMA-2. In the analysis of the flow velocity distributions in the subject section by release flows of Hwacheon dam, it was shown that there was over 5.0m/s of high flow velocity at Sta. $#1{\sim}Sta.$ #3, Sta. $#4{\sim}Sta.$ #6, and Sta. $#12{\sim}Sta.$ #13 of the sections analyzed in this study. The Sta. $#0{\sim}Sta.$ #1 was considered appropriate for the fishway and fish storage establishment. As seen in the results of the numerical stability review by release flow conditions of Hwacheon dam subject to the selected available areas fur fishway and fish storage, the topographically available section for the establishment of fishway and fish storage exists at Sta. $#1{\sim}Sta.$ #3 when the release flow of Hwacheon dam is $5,495m^3/s$, whereas Sta. $#0{\sim}Sta.$ #1 should be reviewed for the subject section for the establishment of fishway at release flows of $6,110m^3/s$ and $7,537m^3/s$, in addition to the figures gathered at the $5,495m^3/s$ release flow. Finally, the available section for the establishment of fishway and fish storage was determined to be Sta. $#0{\sim}Sta.$ #3. Further, if fishway and fish storage are established in the outer bank within this section, the high flow velocity section should be avoided. An alternative would be to establish for the fishway in the inner band on the section of Sta. #1 or Sta. #3.

Distortion of Resistivity Data Due to the 3D Geometry of Embankment Dams (저수지 3차원 구조에 의한 전기비저항 탐사자료의 왜곡)

  • Cho, In-Ky;Kang, Hyung-Jae;Kim, Ki-Ju
    • Geophysics and Geophysical Exploration
    • /
    • v.9 no.4
    • /
    • pp.291-298
    • /
    • 2006
  • Resistivity method is a practical and effective geophysical technique to detect leakage zones in embankment dams. Generally, resistivity survey conducted along the crest assumes that the embankment dam has a 2D structure. However, the 3D topography of embankments distorts significantly resistivity data measured on anywhere of the dam. In this study, we analyse the influence from 3D effects created by specific dam geometry through the 3D finite element modeling technique. We compared 3D effects when resistivity surveys are carried out on the upstream slope, left edge of the crest, center of the crest, right edge of the crest and downstream slope. We ensure that 3D effect is greatly different according to the location of the survey line and data obtained on the downstream slope are most greatly influenced by 3D dam geometry. Also, resistivity data are more influenced by the electrical resistivity of materials constituting reservoir than 3D effects due to specific dam geometry. Furthermore, using resistivity data synthesized with 3D modeling program for an embankment dam model with leakage zone, we analyse the possibility of leakages detection from 2D resistivity surveys performed along the embankment dam.

Structural response of concrete gravity dams under blast loads

  • Sevim, Baris;Toy, Ahmet Tugrul
    • Advances in concrete construction
    • /
    • v.9 no.5
    • /
    • pp.503-510
    • /
    • 2020
  • Concrete dams are important structures due to retaining amount of water on their reservoir. So such kind of structures have to be designed against static and dynamic loads. Especially considering on critical importance against blasting threats and environmental safety, dams have to be examined according to the blast loads. This paper aims to investigate structural response of concrete gravity dams under blast loads. For the purpose Sarıyar Concrete Gravity Dam in Turkey is selected for numerical application with its 85 m of reservoir height (H), 255 m of reservoir length (3H), 72 m of bottom and 7 m of top widths. In the study, firstly 3D finite element model of the dam is constituted using ANSYS Workbench software considering dam-reservoir-foundation interaction and a hydrostatic analysis is performed without blast loads. Then, nearly 13 tons TNT explosive are considered 20 m away from downstream of the dam and this is modeled using ANSYS AUTODYN software. After that explicit analyses are performed through 40 milliseconds. Lastly peak pressures obtained from analyses are compared to empirical equations in the literature and UFC 3-340-02 standard which provide unified facilities criteria for structures to resist the effects of accidental explosions. Also analyses' results such as displacements, stresses and strains obtained from both hydrostatic and blasting analysis models are compared to each other. It is highlighted from the study that blasting analysis model has more effective than the only hydrostatic analysis model. So it is highlighted from the study that the design of dams should be included the blast loads.