This paper discusses the evaluation of interconnection capacity of small cogeneration(SCOGN) systems to the power distribution systems from the viewpoint of voltage regulation. Power utilities are required to keep the customers' voltage profile over a feeder close to the rated value under all load conditions. However, it is expected that the interconnection of SCOGNs to the power distribution systems impacts on the existing voltage regulation method and customers' voltage variations. Therefore, SCOGNs should be integrated to the automated power distribution systems to prevent interconnection problems and supply high quality electricity to the customers. For these reasons, we should proceed with the evaluation of interconnection capacity of SCOGNs to the power distribution systems. However, it is generally impossible to perform actual testing on the power distribution systems, and standardized methodologies and guidelines are not developed to evaluate it. The criterion indexes for voltage regulation and variations are presented in order to evaluate the interconnection capacity of SCOGNs to the power distribution systems. In addition, the evaluation methodology of interconnection capacity of SCOGNs for power distribution systems is presented. It is expected that the resulted of this paper are useful for power system planners to determine the interconnection capacity of SCOGNs and dispersed storage and generation (DSG) systems to the power distribution systems.
This paper presents the unified reliability evaluation technique of distribution system. To calculate accurate reliabi1ity and reliability indices which can consider line limitation and voltage drop of distribution system, we employed the deterministic evaluation technique with PLOC technique. And to evaluate the distribution system, we presented the evaluating method which is based on Analytic network process. As a result, we can evaluate the distribution system and build the expansion planning of the system considering system load and reliability indices.
This paper presents an efficient evaluation method on the role of new energy storage systems, especially the secondary Battery Energy Storage (BES) systems, in the case where they are interconnected with the power distribution systems. It is important to perform the economic evaluation for the new energy storage systems in a synthetical and quantitative manner, because they are very costly in the early stage of their development and commercialization. In this paper, the multiple functions of BES systems, which are operated at distribution systems, such as load levelling, effective utilization of power distribution systems and uninterruptible power supply at the emergency conditions are classified and analyzed. And then the quantitative evaluation methods of the multiple functions for BES systems are proposed using the mathematical modelling.
In this paper, we propose new unified methodologies of reliability and its cost evaluation in power distribution systems. The unified method means that the proposed reliability approaches consider both conventional evaluation factor, i.e. sustained interruptions and additional ones, i.e. momentary interruptions and voltage sags. Because the three voltage quality phenomena generally originate from the outages on distribution systems, the basic and additional reliability indices are summarized considering the fault clearing mechanism. The proposed unified method is divided into the reliability evaluation for calculating the reliability indices and reliability cost evaluation for assessing the damage of customer. The analytic and probabilistic methodologies are presented for each unified reliability and its cost evaluation. The time sequential Monte Carlo technique is used for the probabilistic method. The proposed DVL(Demand Varying Load) model is added to the reliability cost evaluation substituting the average load model. The proposed methods are tested using the modified RBTS(Roy Billinton Test System) form and historical reliability data of KEPCO(Korea Electric Power Corporation) system. The daily load profile of the each customer type in domestic are gathered for the DVL model. Through the case studies, it is verified that the proposed methods can be effectively applied to the distribution systems for more detail reliability assessment than conventional approaches.
It is increased for methodology to evaluate distribution power system interruption cost in power supply zones under competitive electricity market. This paper presents algorithms to evaluate system interruption cost in distribution power supply zones taking into consideration failure rate of distribution facilities and composite customer interruption cost. In this paper, it is introduced for weighting factor for each customer failure duration and failure rate of distribution facilities to evaluate reasonable system interruption cost in distribution power supply area. Also, this Paper estimates evaluation results of system interruption cost using a sample model system. Finally, evaluation results of system interruption cost based on failure rate of distribution facilities and composite customer interruption cost are shown in detail.
대한원격탐사학회 1998년도 Proceedings of International Symposium on Remote Sensing
/
pp.213-217
/
1998
This study overviews existing evaluation methods of classification accuracy using confusion matrix proposed by Cohen in 1960's, and proposes ISDd(Index of Spatial Distribution by distance) and ISDs(Index of Spatial Distribution by scatteredness) for the evaluation of spatial distribution of satellite image classification errors, which has not been tried yet. Index of spatial distribution offers the basis of decision on adoption/rejection of classification results at sub-image level by evaluation of distribution, such as status of local aggregation of misclassified pixels. So, users can understand the spatial distribution of misclassified pixels and, can have the basis of judgement of suitability and reliability of classification results.
Reliability evaluation of power distribution system is the evaluation for all customers supplied from one power source as main transformer located in substation. However, power sources include not only the main transformer but distributed generations. Typical reliability evaluation has focused on configuration of power system with one source including failure rates of equipment. In this paper, we focus on not only configuration but power sources as distributed generations. New reliability evaluation method using power supplied probability (PSP) is proposed. The proposed evaluation method are proved through case studies.
In this paper, we propose a reliability evaluation method considering the momentary interruptions of power distribution systems. The results of research are concentrated on two parts. One is the analytic and probabilistic reliability evaluation of power distribution system considering the momentary interruptions and the other is the reliability cost evaluation that unifies the cost of sustained and momentary interruptions. This proposed reliability cost evaluation methodology is also divided into the analytic and probabilistic approach and the time sequential Monte Carlo method is used for the probabilistic method. The proposed methods are tested using the modified RBTS (Roy Billinton Test System) form and historical reliability data of KEPCO (Korea Electric Power Corporation) system. Through the case studies, it is verified that the proposed reliability evaluation and its cost/worth assessment methodologies can be applied to the actual reliability studies.
AWANG MARIKAN, Dayang Affizzah;RAMBELI, Norimah;AZMAN, Nur Ain;RAMDAN, Mohamad Rohieszan
유통과학연구
/
제20권10호
/
pp.19-29
/
2022
Purpose: This study was conducted to gauge the economic evaluation and sample distribution of conserving the Belum Royal State Park (BRSP) in Perak, Malaysia and to identify factors influencing its use by the community. This study aims to examine community perception on the conservation of the Belum Royal State Park (BRSP) and maximum community's willingness to pay for park entry permits fees. Research design, data and methodology: A questionnaire survey was conducted involving a total of 280 respondents. The study adopted the Dichotomous Choice Contingent Valuation Approach (DC-CVM) and the Logistic Model, to estimate the maximum community's willingness to pay for park entry permits fees. Results: The results established that the factors of respondent's occupation, income, ecotourism influence on the BRSP and maximum entry price, significantly influenced visitors' decision on community's willingness to pay. The average community's willingness to pay was RM9.68 per person. Conclusions: In conclusion, surveillance and patrols in protected areas should be expanded. The extra expense for ensuring safety can be offset through income from ecotourism that should also benefit the local community on economic evaluation and equal distribution on the BRSP.
The development of overload management systems for distribution transformers offers new opportunities for improving the reliability of distribution systems. It allows network planners to optimize the system resource utilization and investment cost. Such an improvement in the flexibility of the distribution network is only possible if the operator has more accurate knowledge of the realtime conditions of distribution transformers. In this paper, we present an improved overload decision system for distribution transformers using realtime monitoring data. Our study can be categorized into two parts: (a) improvement in the criteria for judging the overload conditions of distribution transformers and (b) development of an overload evaluation system using realtime monitoring data. In order to determine the overload criteria, overload experiments are performed on sample transformers; the results of these experiments are used to define the relationship between the transformer overload and the increase in the top-oil temperature. To verify the accuracy of the experimental results, field tests are performed using specially manufactured transformers, the loads and top-oil temperatures of which can be measured. For arriving at online overload decisions, we propose methods whereby the measured load curve can be converted into an overload characteristic curve and the overload time can be calculated for any load condition. The developed system is able to evaluate the overload for individual distribution transformers and calculate the losses using realtime monitoring data.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.