• Title/Summary/Keyword: disassembly priority rule

Search Result 2, Processing Time 0.019 seconds

Priority Assignment Procedure in Multi-Product Disassembly

  • Min, Sundong;Matsuoka, Shinobu;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • v.3 no.1
    • /
    • pp.12-21
    • /
    • 2004
  • This paper investigates the design of a priority rule in a multi-product disassembly environment. Specifically, it is concerned with product scheduling by which the inventory control of disassembled parts can be incorporated into a priority rule to reduce part lead times. The part lead time consists of two components: flow time and supply delay. The primary focus of the paper is on the development of a disassembly priority rule that aims to reduce the supply delay. We propose a priority rule, called Minimum Distance (MD) rule, to improve the supply delay performance. Finally, we provide a comparative analysis on the performance of traditional rules and the new rule proposed in this paper via a simulation model.

Disassembly Priority for Recoverying Remanufacturable Parts(Core) in ELV (ELV에서 재제조 부품을 회수하기 위한 해체 우선순위)

  • Son, Woo Hyun;Park, Sang Jin;Mok, Hak Soo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.6
    • /
    • pp.591-598
    • /
    • 2019
  • Today, due to the development of the industrial society, the need for sustainable research and development for energy depletion and environmental protection is increasing. Among sustainable research, remanufacturing is an ideal way to meet environmental and economic aspects. In this paper, we investigated the End-of-Life Vehicle(ELV) in order to find the recovery method of the core which is the preceding stage of remanufacturing. The number of End-of-Life Vehicle is increasing year by year, but the core recovery rate from ELV is still low. Therefore, a methodology to determine the disassembly priority of each part is proposed to increase the core recovery rate. Based on the analysis Table through the disassembly process, the decision rule was selected and the weighted score evaluation Table was completed to complete the disassembly priority system. Finally, evaluation was made on gasoline vehicles to determine priorities.