Park, Juhyoung;Cha, Sunghyun;Jung, sungsoo;Lee, Sangshin
한국정보교육학회:학술대회논문집
/
2021.08a
/
pp.425-431
/
2021
In this study, in order to develop a manual for the AI convergence education competency strengthening project, project personnel were interviewed and an overall analysis of the business process was made. As a result of analysis, the manual includes methods to solve problems currently being raised in the field such as recruitment of graduate students, education program management, academic registration management, and budget management. In order to increase the continuity and efficiency of the project, it is necessary to build an administrative management site that provides information on the overall project, to strengthen publicity for general teachers about AI convergence education, and meet the educational needs and level of enrolled students.
The Journal of the Korea institute of electronic communication sciences
/
v.17
no.4
/
pp.663-670
/
2022
This study presents the method for integrating the software assets acquired before the weapon system software reliability test was not formed in the weapon system software development and management manual through JTDLS Batch II case. This paper describes the problems for applying manual's direction to JTDLS Batch II project, and decisions and expected effects.
Purpose: The purpose of this study is to analyze quality control strengthening pilot project in development stages of weapon systems which ensures zero-defect. In order to achieve that, we propose collaboration support system between related organizations. Methods: First, we analyze how quality control methods has been developed from reviewing the preliminary study in commercial and defense industry. Then, we suggest improvement plans for quality control in defense industry and propose a pilot study which able to improve the recognized problems. Results: The results of this study ensures the participants in defense industry recognize the importance of quality control and form a consensus by sharing a case study. Finally, we propose the standardized work process by utilizing manual and manpower dispatching. Conclusion: As a result, this study clarifies the scope and role of relevant organizations to achieve the defense quality assurance in the total life cycle(TLC). Also, this paper guides the collaboration system between the relevant organization which differs from the commercial industry currently divided into development-production-quality.
Park, Bo Kyung;Yeo, Soo Hyun;Lee, Sua;Yang, Hee Dong
Journal of Information Technology Services
/
v.19
no.4
/
pp.125-138
/
2020
This paper proposes a more advanced livestock insurance product by comparing the status of livestock management in Korea with Netherlands case. The project focused on blockchain technology, IoT based management manual and planned livestock insurance related to Insurtech. The livestock insurance policy automatically stores information on each block through sensors attached to livestock, so that the livestock manager carries out follow-up manual for each livestock. Blockchain technology contains numerous advantages such as distributed ledger and irreversibility. However, the sharing of transparent information can be a burden to the policyholder. To compensate it, new business model needs to be proposed to provide incentives to the policyholder. We focused on the data of Gyeonggi Province, which suffered the most from African swine fever (ASF) in Korea. The corresponding Insurtech based livestock insurance can enable policyholders and insurers to build trust by sharing objective and transparent information, and maximize their respective profits by enabling mutual control.
PURPOSES : Lots of criticism such as over/duplication investment, inconsistency of the policies among local governments and national plans etc. has been aroused due to the policy of supply-driven construction for transportation facilities. Recently, according to the environmental-friendly transportation policy, the investment of railroad has been expanded gradually, however the duplication with existing road facility makes it difficult to construct railroad. Thus it is necessary to evaluate the interrelationship between new project and existing facilities in the planning stage. However the method and the criteria for analyzing the duplication and over-investment of projects are not established in the manual, thus the feasibility of these projects are carried out from the economic point of view. METHODS: First, It reviewed about interrelationship criteria(domestic, overseas) and proposed implications and this study directions. Next, It developed the methods of evaluating independency, competitiveness and complementarity. RESULTS : In this study, the methods of evaluating independency, competitiveness and complementarity etc. are suggested to analyze the interrelationship between transportation facilities. The case study was carried out to examine the applicability of the methods. CONCLUSIONS: The methods raise rationality of decision-making compared to existing one. In the future, these methods are introduced into the manual of pre-feasibility study and feasibility study, more efficient decision-making and investment are expected.
Kim, Sang-Mok;Son, Eun-Seong;Seo, Young-Kyo;Baek, Sung-Ok
Journal of Environmental Impact Assessment
/
v.28
no.6
/
pp.616-625
/
2019
Health impact assessment is implemented within the Environmental impact assessment for the purpose of minimizing health damage by predicting the impact on human health following implementation of the development project. In health impact assessment, manual revision is required due to the lack of consistency in the method of estimating hazardous air pollutants emissions. This study estimated the emissions by calculating the emissions of hazardous air pollutants based on the actual industrial complex development cases and completed health impact assessments. As a result of risk assessment based on exposure concentration using CALPUFF model, the risk assessment results were different for each of the emission estimation methods, and manual improvement on the emission estimation method is needed.
Kim, Eui-Gyeong;Kim, Seong-Ju;Kim, Hyeon-Geun;Kim, Dae-Hyun
Journal of Korean Society of Forest Science
/
v.96
no.6
/
pp.684-692
/
2007
The object of this study is to identify the factors that is making and promoting cooperation for the unified forest fire administration, and then introduce cooperation process and cooperation manual for an effective forest management. For this purpose, the case studies were carried about "The East Coastal Forest Fire Administration Center" and "The Forest Fire Administration Center in Mt. Jiri Area" to have obtained excellent results by cooperation among administrative districts, and cooperative factors were extracted through analyzing each steps. That is, cooperation steps were divided into 4 steps of Initiation, Planning, Implementation, Benefiting, and in-depth interview and questionnaires were carried for extracting cooperation factors by each step for the unified cooperative forest management system. And with AHP analysis, essential four factors were extracted by each step based on priority order. Finally with the base of the essential 4 factors by each step, the cooperation process and manual appliable to forestry cooperation project were developed. This will be a guideline in order to achieve successful forest administrations through the cooperation among local administrative governments.
It is very important to forecast a back resource of a software development effort at the early stage of development life cycle for successful project processing, and it is carried out through software size estimation. The recent trend of software size estimation method is focused on the user's value such as FPA. We measure the actual development effort through case study and calculate CFP directly according to the cosmic-ffp manual V.3.0. in this paper. We also propose the software development effort estimation model by using the produced data. COSMIC-FFP does not use weights of necessary function elements, and so it has disadvantage in estimating sizes. This paper proposes the estimation model to estimate the precision software size by using system complexity as weight.
Journal of Korean Library and Information Science Society
/
v.45
no.3
/
pp.93-117
/
2014
The goal of this study is to seek for the method of effective DB conversion and related system development for the integrated KORMARC Format on the basis of the case of Sogang University Library. Since the integrated KORMARC bibliographic format was established, libraries have been converting bibliographic DB according to the new format. Loyola Library of Sogang University internally proceeded DB conversion using bibliographic DB convertor, which was developed and customized with a system vendor for Sogang University Library. The internal conversion enabled to correct or supplement bibliographic data errors. Besides, it enhanced stability of conversion and shortened the project time by adopting sampling conversion method. It was effective to reduce the additional work for DB quality maintenance, so this kind of conversion is recommendable to the library that has limited manpower for manual data correction.
Korean Journal of Construction Engineering and Management
/
v.23
no.4
/
pp.65-77
/
2022
Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.