The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF

The Study of Designer's Approaching Procedure by Applying Value Evaluation Method to improve Degree of Owner's Satisfactions in Design Phase (설계단계에서 건축주 만족도 증진을 위해 가치평가방법을 활용한 설계자 접근절차에 대한 연구)

  • Lee, Do-Hyung;Park, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.117-122
    • /
    • 2006
  • In spite of various approaching method to satisfy with the owner's requirements in schematic design phase, it is insufficient to evaluate intermediate process of design arithmetically with participating in design process. So the numerous changes of design after completion of design development cause a lot of loss to the design company. The designer arranges owner's requirements to prevent from this loss at the initial stage of schematic design phase systematically and lets owner and stakeholder to evaluate the value of schematic design to satisfy with owner's and stakeholder's requirements. If the evaluated value for schematic design is above a definite value index, the next design phase should be advanced. By this method, the design company can reduce the additional expenses remarkably by preventing with re-design which is occurred by not reflecting owner's intention or by changing owner's intention. Also the designer have the owner to evaluate the result of design and construction. The designer let the owner know whether the owner's requirement should well have been reflected on drawing or not. There is a strong point to be able to minimize the criticism which can be occurred after completion of construction by evaluating for owner's satisfactory degree and by having owner and designer confirm the result of design and construction arithmetically. This paper presents that the loss of design company can be minimized by going over at next step if the value is over a definite value index after evaluating value for each design from design process.

  • PDF

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

The verification about possibility of introducing Window to Floor Ratio as design index for building energy performance

  • Choi, Won-Ki;Lee, Yong-Jun;Lee, Hyun-Soo;Eom, Jae-Yong;Lee, Chung-Kook
    • KIEAE Journal
    • /
    • v.17 no.1
    • /
    • pp.23-28
    • /
    • 2017
  • Purpose: Many design index that are using in planning phase have been developed. The most popular things among them are Window to Wall Ratio and Surface to Volume Ratio. However there are some limits. Window to Wall Ratio cannot consider building size and Surface to Volume Ratio cannot do Window to Wall Ratio. Accordingly, in this paper, the Window to Floor Ratio was proposed that it can be considered both building size and Window to Wall Ratio. And analyzed correlation of energy demand. Method: For the test, 16 modules with the size of $6m{\times}6m{\times}4m$ were used to make 35 models with the same volume. The simulation was conducted to 945 cases using the window-to-wall ratio of 30, 50 and 70 % in three areas such as Seoul, Gwangju and Jeju and three kinds of windows. And IES_VE was used. Result: The findings above show that the Window to Floor Ratio that can be considered both building size and Window area have to become as design index. It was found out that design criteria with SHGC is necessary, not with the thermal performance (U-value). It is needed to additional analysis about residential building and the effect of 24-hours heating and cooling condition. It plans to carry out research to establish design indicators for climatic conditions in the country and building applications.

A Study on the Application Possibility of Green Building Design Process based on Building Information Modeling(BIM) for Sustainable Architecture (지속가능한 건축을 위한 BIM기반 친환경건축 설계프로세스 적용가능성에 관한 연구)

  • Kim, Mi-Kyoung;Jang, Won-Jun;Choi, Hyun-Ah;Jun, Han-Jong
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.113-122
    • /
    • 2011
  • About 30% of the total annual energy consumption on the earth is used in the architectural activities, including construction, maintenance management, and demonstration of a building. Also, 40% of the natural resource consumption, 50% of $CO_2$ emissions, and 20%~50% of industrial waste emissions are produced from a building. Unfortunately, the percentage of its energy consumption is staidly increasing year by year, about 8% every year, and it recently causes a sustainable architectural concept to come to the fore globally. Indeed, the importance of the sustainable architecture is increasingly becoming a worldwide trend. BIM(Building Information Modeling) is considered a new paradigm and a powerful method in building design, construction and maintenance. BIM has characteristics similar to a building's systems. All of the components in a model have a parametric relationship to each other. Understanding and capitalizing on these interrelationships typically takes numerous iterations that span multiple projects. Optimizing the integrated strategies and technologies for a high-performance, sustainable design requires a continual look at understanding how they work together to deliver the best potential. Throughout all of these concepts, we are going to be using a variety of tools that revolve around a BIM model. Some of the tools will require a heavier use of BIM than others, but all of them will utilize the model geometry you've created as part of your design. This study presents importance and validity of energy performance analyzation in the pre-design phase for the sustainable architecture with the support of Building Information Modeling (BIM) technology.

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

The Design and Implementation of S/W Packet Modem based on Frequency Hopping Legacy Radio System (재래식 주파수도약 통신장비용 S/W 패킷모뎀 개발 및 적용에 관한 연구)

  • Koo, Jung;Pyo, Sang-Ho;Kang, Kyeong-Sung;Kim, Ki-Hyung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.2
    • /
    • pp.222-231
    • /
    • 2011
  • In this paper, we have proposed a method which can make it possible to stably transmit and receive data like the ARC-164 radio frequency hopping environment as a S/W packet modem with PSK modulation. This is a method that the S/W packet modem with PSK digital modulation and the use of PC sound cards change over from data to voice signals and then transmit/receive data. We confirmed not only that it is possible to solve the slow speed communication with the use of sending data through multi-channels and PSK modulation that has the ability to methodically improve transmission rates, but also that it is possible to send the state of frequency hopping stably. In conclusion, we've confirmed both tactical values that though the transmission rate may be a tad slow, a state of frequency hopping of more than 94% confidence plus voice and data can be sent via radio at the same time. In this paper, the proposed S/W packet modem is only an implemented S/W component, so when we apply it to aircraft that we don't consider EMC problems with, then we have the advantage of a wider use of conventional UHF/VHF/HF radio that is possible to voice communication. If we recognize these operational requirements, we can apply for a lot of field equipment efficiently.